Forgive the small scale (I actually hate this place, but at least it's another business opening)
What!? I love me some Waffle House!
Forgive the small scale (I actually hate this place, but at least it's another business opening)
Highland Park Townhomes (at Highland and the Beltline)
Taken Saturday by me
![]()
![]()
![]()
![]()
Great to see people out and about in the neighborhood and Beltline as well.
Another student housing project in midtown?
http://atlantadev.com/100-midtown-considering-expansion/
That'd be 3 student complexes a few blocks from each other.
I've been lurking for a while - haven't had much to say lately. But, with things picking up I've been thinking...
With the new stadium and talk of improving East-West connections, why not propose another streetcar line. Have it go all the way from the AUC complex, around the new stadium, through downtown, across the connector where the new cap is supposed to go after they demolish the old capital parking deck, and along the park that supposed to be built between Memorial Dr. and MLK. and terminate at Oakland Cemetery. (You can add a loop later to pick up Turner Field and Grant Park.)
See my sketch:
![]()
Should this Ferst renovation/expansion project be added to the Atlanta Dev site? It is listed as a 2013 capital project by GT.
http://bldgs.org/ferst/index.php
http://www.space.gatech.edu/planning/index.html?id=341&year=2013
Also, what's the source for the 100 Midtown expansion? I haven't seen that anywhere other than the Atlanta Dev site, which doesn't name a source.
We have a source but they don't wish to be named.
Well, as much as it'd be nice to connect to Turner field, your phase 1 is pretty much useless compared to many other lines that could be built. It pretty much directly parallels the east-west Marta line just a block or 2 north. There's many other lines that could use a streetcar well in advance of a line like this. The main reason the streetcar under construction makes sense is that it will eventually tie into the Beltline, connecting it with Marta, it connects major tourist attractions, and allows for the light rail maintenance facility to be put in a location on otherwise unusable land under the connector. Maybe if a line like this connected Turner Field and the new Dome somehow then provided service up Northside it could make sense.
Highland Park Townhomes (at Highland and the Beltline)
Taken Saturday by me
![]()
Great to see people out and about in the neighborhood and Beltline as well.
I realized that it was somewhat redundant with MARTA's East-West line. However, the proposed Peachtree Streetcar had redundancies with MARTA as well. I was thinking that this would be a catalyst for development. As I believe the currently under construction streetcar line will be. My proposed line would connect some significant points (like AUC, Stadium, MMPT, Capital, Oakland Cemetary) and leverage those with some really under-utilized property.
The AUC needs better surface connectivity to downtown. The MLK/Memorial parkway area is ready for re-development. There is a need to pull these places together. And there have been rumblings about cleaning up the MLK corridor (from the Mayor in a couple of recent articles).
I know this would probably never happen, but it is interesting to think about.
What is promising is MARTA's recent moves to develop TOD's at select stations. I also think that the streetcar is going to give a boost to development in the Edgewood and Auburn Ave corridors. I've even seen a few articles mention Tax Allocation District type funding mechanisms to help pay for additional transit plans.
I think the Atlanta Business Chronicle was leaning a bit towards boosterism last week saying that we are about to hit a wave of in-town development as big as the Olympics, but I do think things are definitely looking up.
also, the concept 3 map by the ARC also proposes a streetcar alignment similar to yours. i'm sure streetcars down MLK (especially between northside and ashby) is an eventual goal.
I realized that it was somewhat redundant with MARTA's East-West line. However, the proposed Peachtree Streetcar had redundancies with MARTA as well. I was thinking that this would be a catalyst for development. As I believe the currently under construction streetcar line will be. My proposed line would connect some significant points (like AUC, Stadium, MMPT, Capital, Oakland Cemetary) and leverage those with some really under-utilized property.
The AUC needs better surface connectivity to downtown. The MLK/Memorial parkway area is ready for re-development. There is a need to pull these places together. And there have been rumblings about cleaning up the MLK corridor (from the Mayor in a couple of recent articles).
I know this would probably never happen, but it is interesting to think about.
What is promising is MARTA's recent moves to develop TOD's at select stations. I also think that the streetcar is going to give a boost to development in the Edgewood and Auburn Ave corridors. I've even seen a few articles mention Tax Allocation District type funding mechanisms to help pay for additional transit plans.
I think the Atlanta Business Chronicle was leaning a bit towards boosterism last week saying that we are about to hit a wave of in-town development as big as the Olympics, but I do think things are definitely looking up.
I've been lurking for a while - haven't had much to say lately. But, with things picking up I've been thinking...
With the new stadium and talk of improving East-West connections, why not propose another streetcar line. Have it go all the way from the AUC complex, around the new stadium, through downtown, across the connector where the new cap is supposed to go after they demolish the old capital parking deck, and along the park that supposed to be built between Memorial Dr. and MLK. and terminate at Oakland Cemetery. (You can add a loop later to pick up Turner Field and Grant Park.)
See my sketch:
![]()
http://map.atlantadev.com