ATLANTA | Development Thread V


Status
Not open for further replies.
Does anyone else think this looks kinda...bla? I guess it's as good as can go on that site and it meets the street...I guess I'm just getting tired of Atlanta/sunbelt development patterns. Look at how green that area is! And not usable green, but straight forest.

I think it's fine. Would you be happier or feel better if they cut down the trees? 600 feet behind the development are houses that you can't see because the trees are taller and the angle of the shot. Atlanta is a city in the forest. It's not on a bay, or island, or navigable river or the plains, or desert - you are gonna see trees.
 
So apparently now Fig Jam is planning to come to 1010 Midtown as well?

Between:

Lure (just opened)
Cucina Asellina (opened earlier in the year)
STK (opened earlier in the year)
Fins (opening soon I guess)
Intermezzo (planned/build out)
Mi Cocina (planned/build out)
The two restaurants under build-out in 1180 Peachtree
Fig Jam (possible 2013 relocation; also to 1010)

...it's really tough to imagine there being enough demand for all of these new restaurants within a two block radius, and most of them competing in a similar price point and quality level.
 
I'd imagine they'd do well at lunchtime, assuming they're open for lunch (STK isn't) with a reasonable menu. FYI, the restaurants in 1180 will be article 14 (across from the new Subway) and Olmstead (in the former Trois location). I work upstairs, and there's already furniture in Olmstead. Both are looking for restaurant staff now, according to the signs. My real concern is what happens to the Thursday food trucks if construction ever starts at the lot formerly slated for Mandarin Oriental.
 
So apparently now Fig Jam is planning to come to 1010 Midtown as well?

Between:

Lure (just opened)
Cucina Asellina (opened earlier in the year)
STK (opened earlier in the year)
Fins (opening soon I guess)
Intermezzo (planned/build out)
Mi Cocina (planned/build out)
The two restaurants under build-out in 1180 Peachtree
Fig Jam (possible 2013 relocation; also to 1010)

...it's really tough to imagine there being enough demand for all of these new restaurants within a two block radius, and most of them competing in a similar price point and quality level.

I dunno... Atlanta's foodie scene is pretty strong, I think having them all in one area will just boost foot traffic and vitality, plus give all the people going out on crescent later in the night somewhere to stop for dinner first.

Also there are 2 large apartment buildings about to fill up with people right in that area.

I'd give a restaurant a better chance of making it than another overpriced furniture store, which peachtree already supports several of...
 
I think it's fine. Would you be happier or feel better if they cut down the trees? 600 feet behind the development are houses that you can't see because the trees are taller and the angle of the shot. Atlanta is a city in the forest. It's not on a bay, or island, or navigable river or the plains, or desert - you are gonna see trees.

Those trees cover a drop dead GORGEOUS neighborhood along and adjacent to Houston Mill Rd. I'm talking big creeks with waterfalls and stone outcroppings, houses built into cliffs and an absolutely dream like mature tree cover. I could certainly not afford to live back there. ;)

simms3, do yourself a favor and take a spin through there sometime to truly appreciate yet another ITP jewel that really does set us apart from other similar sized metros.
 
Does anyone else think this looks kinda...bla? I guess it's as good as can go on that site and it meets the street...I guess I'm just getting tired of Atlanta/sunbelt development patterns. Look at how green that area is! And not usable green, but straight forest.

For some reason the "wrapped-deck" development solution seems to trigger a retro kitch design style in Atlanta - Maybe because this typology became popular at the same time as New Urbanism, which usually relies on historicist references. It would be great to see Atlanta developers graduate to a more modern sensibility.
At least this project is not foam and dryvit pastiche......we kill way too many dryvits around here :D
 
The Emory Pointe development is scaled perfectly for the area. Take a drive down Clifton. The buildings fit seamlessly into the existing height. And while the design is pedestrian (on the dull side) it is tastefully done. If Clifton had some community support - perhaps through Emory - to rebuild the sidewalks, plant trees, install unique street lighting reflecting the history of Emory and the Clifton Corridor, than the walkability Emory Pointe is creating would be extended up and down the entire boulevard. Atlanta needs more impact developments such as this. The key is to magnify their influence. Otherwise this is just another island like Atlantic Station.
 
The Emory Pointe development is scaled perfectly for the area. Take a drive down Clifton. The buildings fit seamlessly into the existing height. And while the design is pedestrian (on the dull side) it is tastefully done. If Clifton had some community support - perhaps through Emory - to rebuild the sidewalks, plant trees, install unique street lighting reflecting the history of Emory and the Clifton Corridor, than the walkability Emory Pointe is creating would be extended up and down the entire boulevard. Atlanta needs more impact developments such as this. The key is to magnify their influence. Otherwise this is just another island like Atlantic Station.

Whether you agree with the T-SPLOST or not, if it would have passed and the Clifton Corridor transit line would have been built it would make that area really livable. A lot like many of the stops further out on the DC Metro. Now that line won't be built for probably 20 - 30 years and in the mean time the traffic is going to be unbearable.
 
Whether you agree with the T-SPLOST or not, if it would have passed and the Clifton Corridor transit line would have been built it would make that area really livable. A lot like many of the stops further out on the DC Metro. Now that line won't be built for probably 20 - 30 years and in the mean time the traffic is going to be unbearable.

Yes it is a pity, because the Clifton road corridor combines offices, housing, lots of students, hospitals, public buildings, etc and could easily become a high traffic transportation area. This is one of the most significant losses from the defeat of the TSPLOST. It is remarkable that Emory (along with Tech) has developed a fairly comprehensive private shuttle system to get people around. The CDC is investing in concentrating all offices in two campus areas, Clifton and Chamblee. Theoretically they could be quickly connected by Marta to each other, and the Clifton corridor line would have helped make that feasible.. At the present time there is only dependence on private cars to commute from one campus to anther. Highly inefficient.
 
Agreed on both of the above points re: Emory Pointe. Emory will continue to be an island, unfortunately.

Meanwhile in Midtown:

I peeked behind the posters covering the windows at article14 in 1180 Peachtree (Symphony Tower), and there are already dinner tables and chairs and new tile floors. I'm not sure about the opening date, but both this and Olmstead could easily open this year.

From my office, I see that 77 12th is roaring along, and it will be surrounded by all the amazing restaurants within a 2 block radius. I walk by 11th and Peachtree some mornings, and that area is becoming very attractive, especially with a MARTA station nearby (with one of the best real subway-type entrances in Atlanta besides Ptree Center, on the north side of 10th Street).

Meanwhile in 30363:

San Francisco mobile payments startup Square picks Atlantic Station office

Welcome to Southeast Hollywood / Southeast Silicon Valley!
 
Hope it happens

Re: LRT to the Clifton Corridor, it doesn't sound like Emory intends to not try to move forward somehow. Between the University and the CDC's critical mission, something may be in the works.....

http://news.emory.edu/stories/2012/08/er_what_next_for_clifton_corridor/campus.html

I hope they can put something together. Much damage has already been done by the delay of a Clifton Corridor LRT. (Ideally there should be a heavy rail line connecting Lindbergh and Decatur, but that is dreaming). In the meantime CDC has invested a lot in building massive parking blocks for employees that are free for employees. As former CDC staffer, I used to joke that my car had more "office space" than my personal office space. I tried for several years to routinely take MARTA to work, but in the long run, it proved too difficult and the multi-campus structure of CDC made it ultimately impossible. Eventually all CDC employees are supposed to be either at Chamblee or Clifton and theoretically this would make MARTA use a real possibility for travel between the two areas. However the continued building of on site free parking garages does not encourage any public transit use either to get to work or to travel between campuses. So, even if you build high rise offices, transit will not be used if at the same time you build huge parking facilities and give free parking.
 
With regard to 77 12th st: what are they doing? is their a high construction expert on board who can explain this work over the past week and what is happening now. It looks like they are preparing a template for all floors.
 
With regard to 77 12th st: what are they doing? is their a high construction expert on board who can explain this work over the past week and what is happening now. It looks like they are preparing a template for all floors.

Yeah, I've been scratching my head as to this new brick colored flooring. If you look below it, there are these bars hanging down. It looks like it's a completely useless level underneath. Maybe it's a utilities floor? Would love to hear from somebody who knows.

http://oxblue.com/open/brasfieldgorrie/7712thstreet
 
77-12th

With regard to 77 12th st: what are they doing? is their a high construction expert on board who can explain this work over the past week and what is happening now. It looks like they are preparing a template for all floors.

Yeah, that's the template for the residential floors. The Skyhouse used the same system, which allows for quick construction of typical floors (basically all of its floors above the 1st or 2nd were typical residential floors). 77-12th has the atypical parking podium with sloped ramps which takes longer to construct due to unique formwork, and is just now getting to a point where they can use that system. Construction should speed up from here (vertically speaking).

Skyhouse went with an adjacent precast parking garage for these reasons; a reduced construction time (no podium) and lower costs (less labor intensive and precast construction).
 
Yeah, that's the template for the residential floors. The Skyhouse used the same system, which allows for quick construction of typical floors (basically all of its floors above the 1st or 2nd were typical residential floors). 77-12th has the atypical parking podium with sloped ramps which takes longer to construct due to unique formwork, and is just now getting to a point where they can use that system. Construction should speed up from here (vertically speaking).

Skyhouse went with an adjacent precast parking garage for these reasons; a reduced construction time (no podium) and lower costs (less labor intensive and precast construction).

Thanks for the clarification. Hopefully the pace will now pick up. :cheers:
 
Beltline Eastside Trail Progress:

Taken a few days ago by me
IMG_1433.jpg


IMG_1434.jpg


IMG_1465.jpg


IMG_1447.jpg


Here's some progress on that Highland Park development with 66 townhomes:
(sorry the site plan is upside down)
IMG_1458.jpg


IMG_1444.jpg


IMG_1454.jpg
 
I was surprised to see in this flyer for Skyhouse's retail section that there are 4 distinct retail spaces. With 2 in the disgusting parking deck. I can't even imagine what kind of business would go in there. I have a feeling a lot of this space will be empty for some time, especially with 77 12th having a ton of new retail coming.

http://skyhousemidtown.com/files/Skyhouse-WEBRETAILFLYER-061512.pdf

Wouldn't be surprised if they never even underwrote the retail. They fought the retail knowing they wouldn't lease it up and it would come with carrying costs, so after reluctantly putting in the retail I'm sure anything that happens there will be a nice little surprise pop. My guess.

That retail is 8,000 SF or so? Maybe $12-$15 NNN rents tops? If it leases within Novare's hold period? LoL Yea it's worth practically nothing when you have 320 units, or around 300,000 additional square feet leasing up at $20-$25 annualized. Do the math, the retail is about 2% of the value of Skyhouse IF they underwrote it at all. hehehe
 
Status
Not open for further replies.


Back
Top