ATLANTA | Development Thread V


Status
Not open for further replies.
Starting to fix things at Centergy.

fffffffffeef001.jpg


fffffffffeef002.jpg
 
Here's some good news. Sony Ericsson is moving its north american HQ from RTP to Atlanta.

http://bit.ly/3TohRR

Maybe they're big enough to warrant 50 Allen Plaza getting back on track?

wow, that's great news. i wish the R&D group was coming here too.

CE/wireless is one of the bright spots in the economy that consistently outperforms most other categories.

if only philips hadn't folded up their NA headquarters.
 
Here's some good news. Sony Ericsson is moving its north american HQ from RTP to Atlanta.

http://bit.ly/3TohRR

Maybe they're big enough to warrant 50 Allen Plaza getting back on track?

Unfortunately, they probably could have their pick of new buildings in Buckhead (a number of which have no tenants at all), before even thinking about new development. Plus, there is an even bigger chance they will just move to the suburbs.

But hey, it is a good thought. I'll be hoping for Barry to start negotiations ASAP!
 
Unfortunately, they probably could have their pick of new buildings in Buckhead (a number of which have no tenants at all), before even thinking about new development. Plus, there is an even bigger chance they will just move to the suburbs.

But hey, it is a good thought. I'll be hoping for Barry to start negotiations ASAP!

agreed on all that.

plus being the HQ, you're probably only looking at a few hundred folks tops, definitely not enough to warrant allen plaza which i think would only break ground for a major client with at least .5MM sq ft reqirement.....i'm thinking law/accounting firms, delta, coke, ncr....those types of players would need to step up for allen plaze to rise.
 
Unfortunately, they probably could have their pick of new buildings in Buckhead (a number of which have no tenants at all), before even thinking about new development. Plus, there is an even bigger chance they will just move to the suburbs.

Here is a quote from the Business Chronicle...
Morris said it is too early to tell if the RTP jobs moving to Atlanta will be at its 3344 Peachtree Road site, or another site in the city
Hopefully they're more attracted to intown if they're already at 3344 Peachtree.
I would think that would bring that building pretty close to 100%...good news for the other Buckhead developments if they pick that area of town.
 
Last edited:
Here is a quote from the Business Chronicle...

Hopefully they're more attracted to intown if they're already at 3344 Peachtree.
I would think that would bring that building pretty close to 100%...good news for the other Buckhead developments if they pick that area of town.

Still wish it could be downtown...
 
Well we went to the Costco the other day and it looks like there is some kind of new construction going on next to the Cox Building. Are they adding another tower?
 
Hmm. Interesting use of funds for 5 points station. I suppose it's a start to improving transit:

A plan to build a major passenger terminal in downtown Atlanta might soon boast new life, in the form of an $80 million-plus jump start, state officials said at Transportation Board meetings Wednesday and Thursday.

The idea has reeled in big supporters, but raised questions too -- including whether it's legal.

Congress long ago earmarked $87 million to partially fund a commuter rail line through Lovejoy, but Georgia has spent little of it, as state and local officials struggled to find funds to pay the remaining cost.

Now Congress is threatening to revoke unused earmarks, so state Department of Transportation board members and staff are looking to see whether they can spend the federal money on the terminal where the rail line was supposed to end, in the “gulch” area connecting to MARTA’s Five Points station.

The station would outclass any currently existing in Georgia. Where MARTA stations handle just subway trains, the terminal could be fitted to handle everything from high-speed rail to Amtrak to commuter rail. It would also receive commuter and inter-city buses, such as Greyhound. .

"I'm in favor of moving ahead with it," state Transportation Board Chairman Bill Kuhlke said Thursday. While there were other possible options, he said, "If you do anything, at some point you’re going to have to have a multimodal station. So why not concentrate on something that we’re going to have to have anyway?"

Gerald Ross, the state Department of Transportation's chief engineer and deputy commissioner, told board members Wednesday, "That's an opportunity we think we could use the money on." In an interview later, he cautioned that the idea was in early stages, that it was not the only possibility, and most significantly, that DOT had not yet verified that the language in the earmarks would allow the state to concentrate the money on a terminal.

In the meantime, DOT's director of intermodal programs, Erik Steavens, is in talks with city leaders and other agencies to determine what types of facilities the station would provide and how much space would be needed.

There would be opposition from Eldrin Bell, who chairs the Clayton County Commission, where the rail line is supposed to run. "I believe it would have a profound negative impact" to move the money, he said.

The project could address the fundamental problem that has dogged the commuter rail line proposal: Mass transit ticket sales rarely pay the full cost of operating the system on an ongoing basis. One idea is to gain a revenue stream for the rail lines by building and renting out office space above the terminal. DOT, MARTA and other agencies could move into that space, and form a reliable renter base even in a shaky real estate market.

If the federal government were to build out the Lovejoy train line itself as well as the intercity rail network now backed by the Obama administration, Atlanta would be ready with its central station.




I always thought that the multi-modal station should be a replica of the old Terminal station which was knocked down. Really would be classy
 
Hmm. Interesting use of funds for 5 points station. I suppose it's a start to improving transit:

A plan to build a major passenger terminal in downtown Atlanta might soon boast new life, in the form of an $80 million-plus jump start, state officials said at Transportation Board meetings Wednesday and Thursday.

The idea has reeled in big supporters, but raised questions too -- including whether it's legal.

Congress long ago earmarked $87 million to partially fund a commuter rail line through Lovejoy, but Georgia has spent little of it, as state and local officials struggled to find funds to pay the remaining cost.

Now Congress is threatening to revoke unused earmarks, so state Department of Transportation board members and staff are looking to see whether they can spend the federal money on the terminal where the rail line was supposed to end, in the “gulch” area connecting to MARTA’s Five Points station.

The station would outclass any currently existing in Georgia. Where MARTA stations handle just subway trains, the terminal could be fitted to handle everything from high-speed rail to Amtrak to commuter rail. It would also receive commuter and inter-city buses, such as Greyhound. .

"I'm in favor of moving ahead with it," state Transportation Board Chairman Bill Kuhlke said Thursday. While there were other possible options, he said, "If you do anything, at some point you’re going to have to have a multimodal station. So why not concentrate on something that we’re going to have to have anyway?"

Gerald Ross, the state Department of Transportation's chief engineer and deputy commissioner, told board members Wednesday, "That's an opportunity we think we could use the money on." In an interview later, he cautioned that the idea was in early stages, that it was not the only possibility, and most significantly, that DOT had not yet verified that the language in the earmarks would allow the state to concentrate the money on a terminal.

In the meantime, DOT's director of intermodal programs, Erik Steavens, is in talks with city leaders and other agencies to determine what types of facilities the station would provide and how much space would be needed.

There would be opposition from Eldrin Bell, who chairs the Clayton County Commission, where the rail line is supposed to run. "I believe it would have a profound negative impact" to move the money, he said.

The project could address the fundamental problem that has dogged the commuter rail line proposal: Mass transit ticket sales rarely pay the full cost of operating the system on an ongoing basis. One idea is to gain a revenue stream for the rail lines by building and renting out office space above the terminal. DOT, MARTA and other agencies could move into that space, and form a reliable renter base even in a shaky real estate market.

If the federal government were to build out the Lovejoy train line itself as well as the intercity rail network now backed by the Obama administration, Atlanta would be ready with its central station.




I always thought that the multi-modal station should be a replica of the old Terminal station which was knocked down. Really would be classy
Yeah, hopefully something Grand Central Station-ish
 
On the thing about the trains, I like them a lot and grew up with them. But is there a chance we could bring them back after 50 years? Downtown is a lot different from the way it was in those days.
 
On the thing about the trains, I like them a lot and grew up with them. But is there a chance we could bring them back after 50 years? Downtown is a lot different from the way it was in those days.

there's more than a chance.

the multi modal terminal is much less about downtown and much more about providing a singular connecting and distribution point for various modes of transport from across the region.

the more important question may be: after being america's poster child for unchecked sprawl for the past 50 years, do you think atlanta will prosper for the next 50 years without new (or reinstated) modes of transportation as an alternative to the automobile?
 
On the thing about the trains, I like them a lot and grew up with them. But is there a chance we could bring them back after 50 years? Downtown is a lot different from the way it was in those days.

We have to bring trains back to Atlanta in order for it to survive as a growing region. So long as the interstates are backed up and pollution plagues the area, Atlanta will find less and less growth. I really do believe that in the future, either metro Atlanta will exist with trains running throughout the region as a much more major city, or it'll become somewhat like Detroit, steadily declining.
 
Status
Not open for further replies.


Back
Top