"The Theia Group project is a tremendous opportunity for the city of Albuquerque in our ongoing efforts to be a central hub to the fields of aerospace technology and create jobs in higher paying engineering, chemistry, physics and other science related fields," Albuquerque City Council President Cynthia Borrego (5th District) said in a statement to Business First prior to Monday's vote.
Theia Group Vice President James Reid Gorman previously said in a statement the development will be "one of the largest construction projects" in the country.
As of March, the company had openings that appeared on job boards, including those for a spacecraft systems engineer and software operations lead. It also recently expanded in Albuquerque with the takeover of facilities formerly occupied by Raytheon Co. — representing a multiyear commitment to establishing a presence here.
"Our number one focus right now is ramping up these facilities because these facilities are going to be driving a lot of the talent that migrates to the Orion Center when it opens," Gorman said during Monday's city council meeting.
Development Review Board approval
Albuquerque's Development Review Board was set to consider plans for the project this week, but the discussion was deferred to April 28.
Small told Business First that a site plan, site infrastructure list and plat would be submitted this month with DRB review in late April and final approval in June.
FAA approval
Gorman previously told Business First the Federal Aviation Administration was requiring the company to do an environmental assessment study.
A representative for the agency was unavailable for comment on the environmental assessment. But in an email to Business First, Davis wrote that the company "has completed our requirements for the environmental assessment."
The permit for the largest project in terms of estimated cost was issued on April 8 to Crystal Jordan for an addition at 7300 Meridian Pl. NW. The project is estimated to be about 14,400 square feet. The estimated cost of the work is about $2.5 million. The work will be done by BRR Architecture Inc. and Ryan Companies US Inc.
Gabe Mounce, director of the Space Force Accelerators program at AFRL, told the Journal that Q Station will help the Air Force collaborate with potential partners in Albuquerque’s growing commercial space sector, making connections with startup founders and venture capitalists in the space.
"By being here too, companies get exposed to not just resources in New Mexico, but potential funding streams, to the venture capital community,” Mounce said.
Randy Trask, president of the New Mexico Trade Alliance, said the space will be open to partner organizations and members of the business community that are deemed to be an integral part of the community’s directed energy and commercial space ecosystems.
“We don’t want to compete with shared working spaces, we want our shared working spaces to thrive,” Trask said. “This is an enclosed membership to encourage collisions within this particular industry sector.”
Trask said the expectation is that members will use the space for meetings, get-togethers and on a drop-in basis, forming organic partnerships with like-minded Burquenos.
“We want that constant activity,” Trask said.
Mounce said the Air Force has focused on doing more outreach to the private sector in recent years, but added that bringing businesses to Kirtland Air Force Base for meetings can be a challenge.
Having the space in Nob Hill, rather than behind the fence, makes it easier to form connections organically and may appeal to out-of-state employees, who may be familiar with similar spaces in Austin, Boston and Los Angeles, Mounce said.
The New Mexico Trade Alliance was recently awarded a $750,000 grant for the station. That money will go to help buy communication technology for the space.
The space will include:
State of the art communications technology designed to create a hybrid work environment, post COVID-19.
A co-working space for Q Station partners and the companies working with them.
Accessibility for those who are currently working with AFRL or who may have an interest in doing so.
Temporary free space to out-of-state and international companies and local start-ups that are working on space and directed energy technologies who want to grow or expand operations in New Mexico.
Ekstrom is targeting Farmington for the first Slim Chickens in New Mexico, which he is expecting to open in September. Ekstrom said he has letters of intent out to developers and landowners in Albuquerque and Rio Rancho. Once a letter of intent is accepted and the leasing process starts, it takes six to eight months for a location to go live, he said. The hope, Ekstrom said, is to open a few stores in the Albuquerque area by the end of the year.
John Ramsay, vice president of franchise sales for Noodles & Co. told Business First on Monday that New Mexico — specifically the Albuquerque-area — is a prime target for the company to grow its franchise of fast-casual restaurants. As of Monday, Noodles & Co. is in talks with a few groups for franchising in the Albuquerque area, Ramsay said.
While deals aren't in place yet locally, Ramsay said he envisions about five to seven restaurants in densely populated areas in New Mexico. He specified Central Avenue near the University of New Mexico, the Northeast Heights, Uptown, the Westside, Rio Rancho and Santa Fe on Cerrillos Road as ideal locations for possible Noodles & Co. restaurants. Generally, each location employs about 20 people.
Monterey Place, a future 42-unit apartment complex near El Vado, finally kicked off construction this month following a long pandemic-related financing delay. The project, which will include some groundfloor retail space, is slated to take one year, according to Ryan Whitt, the construction director at PacifiCap.
Rennaker is the developer of El Vado and expects to begin construction of a project at the old Motel 21 property across Central in 2022. He is also behind the forthcoming overhaul of the Imperial Inn, near Central and I-25.
A city land-use hearing officer appears ready to reverse a Landmarks Commission decision denying a demolition permit to a developer looking to build a 45-unit apartment complex at 6th and Coal.
Though word of a final decision from Steven Chávez had yet to be published by the city as of last week, he didn't mince words at a recent appeal hearing: "It's my belief that the Landmarks Commission erred grossly," Chávez said. "They don't have authority to just outright deny the application."
The commission didn't impose such a delay in January, but it could well do so if it is asked to review the case again. The prospect of another delay - something that could in any event only be decided at the commission's next meeting - was clearly on the mind of Jennifer Facio Maddox, an architect with Dekker/Perich/Sabatini who is working on the project on behalf of DBG Properties, which currently owns the property, and Bernalillo County, which is looking to put up the apartments.
"All of the things that would normally happen under that 120-day review purview have been reviewed," she said. "I think going back to the hearing is just going to delay this."
Chávez concurred: "I agree it's going to delay it," he said, explaining that he was likely to remand the case back to the Landmarks Commission anyway.
A Bay Area company helping clients acquire new customers plans scores of jobs in Downtown Albuquerque.
The company, LQ Digital, uses various digital tactics to help clients attract more business, including search engine optimization and marketing, social media and contact center services. By the end of the year, LQ plans to have built a workforce of 100 in Albuquerque, adding to its nationwide workforce of about 300, according to CEO Katy Keim.
Yes, below is the recent report about that by KOB-TV. It's really more like the project is canceled, unfortunately. The mayor says he would like to revisit it in a second term, but there's no guarantee he will get one with the hellish year we're having with murders in the city right now.The lounge in the Monterey looks really cool, as do the rooms
Regarding downtown- saw that the 4th and Marquette project was on hold for now. Something like 80 million away from being feasible
The proposed skyscraper at 4th and Marquette will not be funded in this latest investment project.
Keller said developing the property would have cost taxpayers too much money.
"I was really excited about the opportunity for that project but unfortunately all the proposals have had a $50 to $80 million hole, so unless we find $80 million, we want to spend on those, I think we'll revisit it in hopefully a second term," Keller said.
3. Albuquerque, New Mexico — 87102
Selected monthly owner costs: $976
Median rent: $714
Monthly cost of utilities: $203
Monthly public transportation pass: $30
Albuquerque is a Southwestern gem nestled in the center of New Mexico. Just outside the limits of this affordable ZIP code lie the charms of Old Town Albuquerque, the ABQ BioPark Aquarium and the New Mexico Museum of Natural History & Science. Albuquerque is also the home of the world's longest cable-car route, the Sandia Peak Aerial Tramway, offering breathtaking views of the valley below from a height of 10,378 feet.
516 Arts and Outpost Performance Space, two organizations that have become household names in the Downtown and university-area cultural scenes, are planning to build a new $10 million 31,000-square-foot arts center at the corner of 18th and Bellamah in the Sawmill neighborhood.
The building would be divided up roughly into thirds, with Outpost and 516 controlling about one-third each and a new non-profit administering the rest of the space, which could potentially include artist studios, an arts-focused business incubator, a café, and a combined film screening area and lecture hall.
So far, the capital campaign has raised $2.6 million for the effort, which does not include $500,000 in funding that the City Council appropriated this week in an amendment to a larger budget bill sponsored by City Councilor Isaac Benton. That move still needs a signature from Mayor Tim Keller, but he has previously endorsed the project in a statement posted on a special website set up to attract donors. The state legislature also contributed $1.1 million toward the center in this year's infrastructure spending package, and Bernalillo County is set to consider a contribution in the coming weeks, supplementing about $450,000 raised thus far from individuals and private foundations.
If all goes to plan, workers would break ground in August of 2022, finishing up in early 2024 ahead of a spring opening.
The project would see both 516 and Outpost move out of their present locations in the coming years, selling their buildings to help the larger fundraising effort in the process, 516 Executive Director Suzanne Sbarge told DAN. 516 will keep its name, she added, even though it refers to its present address on Central.
Pacificap, the organization led by Chad Rennaker that also redeveloped El Vado and the Monterey Motel, would oversee the construction of the complex. Pacificap also plans to develop 40 apartments on the site in a separate project.
Initial construction on a railside trail connecting Lomas and the Rail Yards should begin by roughly the end of the year, Metropolitan Redevelopment Agency Manager Karen Iverson told the Barelas Community Coalition last month.
Phase one of the project will be a new crossing at Marquette that would allow local traffic to cross the tracks, a more direct route between such attractions as the convention center, the Fusion Theater, Villa Myriam Coffee Roasters, and a forthcoming museum dedicated to neon signs (map).
Meanwhile, the final results of a separate feasibility study looking at a trail from Lomas to Sawmill via the rail spur have yet to be released.
In the bigger and even longer-term picture, the city would like to see the trails become part of an 8-mile walking and bicycling loop, Iverson said, connecting Sawmill to the bosque trail and returning to the Rail Yards via Santa Fe Avenue in Barelas.
Albuquerque home prices continued their meteoric rise in April, but an uptick in new listings may be a cause for optimism for potential buyers.
The median sales price for a detached single-single family home in Albuquerque hit $283,375 in April, a jump of more than 20% since April 2020, according to monthly figures from the Greater Albuquerque Association of Realtors. The mean sales price in April hit $328,768, up $21.4% over the same period.
A key factor driving the recent home price growth has been a persistent lack of inventory, as more buyers have competed for fewer available homes. In April, however, the number of new single-family listings in metro Albuquerque increased 22.5% compared to last April, the first month in 2021 GAAR statistics have shown a year-over-year increase in listings.
A month after tying with three other markets for the lowest monthly supply of houses, the Albuquerque metro now stands alone.
Re/Max published its monthly report Monday and found Albuquerque's 0.4 supply to edge out Denver, Seattle, Manchester, New Hampshire, and Raleigh-Durham, North Carolina for the lowest among 53 metro areas surveyed.
Homebuilders are looking to keep pace as well with Pulte Group's Wade Messenger describing the housing market as "gangbusters" to Business First this month as the homebuilder makes progress on its 400-home planned Broadmoor Heights subdivision in Rio Rancho.
Hakes Brothers opened its first 37 homes to buyers this month in the Legacy@Sierra Vista subdivision in Los Lunas, according to previous Business First reporting.
John Garcia, executive vice president of the Home Builders Association of Central New Mexico, said the industry is dealing with three L's: lots, lumber and labor. Garcia said, for one individual house, lumber prices have increased $25,000 on the low end up to $36,000.
"We're holding on. When the market's hot, you got to play. And the builders are playing and doing their best," Garcia said.
According to the St. Louis. Federal Reserve, in the Albuquerque MSA, there were 308 single-family permits pulled in March, compared to 184 a year ago.
Strickland said a fueling station has signed a lease, but declined to disclose its name and added that several other leases are in various stages of the leasing process. The field of tenants could include a bank, restaurants, other food concepts and a dental office, among others, he said. Strickland said about 60% of the space is already spoken for with commitments.
Construction on the retail center is in the early stages, with grading ongoing for the next three to four months. The infrastructure and access points are also being built. From there, Strickland said the shells for the retail tenants should be ready five months from there.
The permit for the largest project in terms of square footage and estimated cost was issued on May 4 to Juan Astiazaran for a new building at 6500 Americas Parkway NE. The project is estimated to be about 397,570 square feet. The estimated cost of the work is more than $37 million.
“A huge part of our collection is from the Manhattan Project and the Cold War era just because we tell the story of the atomic age from its early developments to today’s peaceful uses,” said the Museum’s Deputy Director, Jennifer Hayden.
However, the Museum is running out of room for all of their artifacts. “Our museum has the largest collection of unclassified weapons in the entire world and currently we only have one fifth of them on display for public viewing,” said Hayden.
“When we see large projects like Amazon, it’s not uncommon to see kind of the tentacles of that project go out,” said Brennon Williams, planning director for the City of Albuquerque. “It’s not uncommon for those two to kind of depend upon each other and work off of each other as it relates to one gets started and then inevitably, the other one is coming in.”
According to the city’s Development Review Board, many of the new construction projects applying for permits are apartment complexes. In addition to the potential apartment complex at the mixed-use center in the works near Unser and McMahon, a massive 333-unit complex is already under construction at Paseo and Woodmont, south of Ventana Ranch and minutes from the Amazon warehouse.
New Mexico United is working to get its own stadium as three more United Soccer League teams open their own stadiums this year. The team and the City of Albuquerque are waiting on a feasibility study to see where a stadium could go and what it should look like. The team has its sights set on downtown.
“This could be much more than a soccer stadium, this could be a community center. This could be a place where we have art installations, it could be something we have activated every single day. It could drive a lot of economic development, and ancillary benefits for the community if it’s downtown,” Peter Trevisani, President of the team, said.
The results of the feasibility study are expected to be released in late June or early July.
While the city waits to get the results of a recent feasibility study that will reveal the best location for a new New Mexico United soccer stadium, it looks like the Rail Yards is very much still in the mix as a potential spot. City officials and neighbors took a private tour through the Rail Yard site Wednesday and during that meeting, the mayor’s office said nothing is set in stone, but acknowledged the Rail Yards is a strong competitor for a possible stadium.
New Mexico offers some of the nation’s lowest-cost renewable generation for large customers, thanks to nearly 300 days of sunshine every year, plus billowing wind on the state’s eastern plains. Those readily-available, low-cost renewable resources helped attract Facebook to Los Lunas, and state agencies are now using clean energy as a major selling point to lure more companies here.
“Some major projects are in the works that we can’t discuss and that could be announced in the next few months,” Fallgren said. “We want to be prepared.”
Public Service Co. of New Mexico (PNM) on Monday put out two request for proposals (RFP) seeking 700 megawatts in reliable power capacity from prospective energy developers.
The two proposals focus on electric demand “to serve PNM’s forecasted economic development load growth needs by and before” June 2022 and 2023, according to a news release.
PNM spokesman Ray Sandoval said the two proposals are considered “all source,” meaning that PNM isn’t just looking at solar or wind.
“It's going to be everything,” Sandoval said.
Construction is underway for the first multifamily project built at the Journal Center office park.
Titan Development confirmed to Business First that it is targeting December 2022 for the completion of the 158-unit Allaso Journal Center apartments, but hopes it will begin the leasing process by fall 2022.
"Breaking ground on this project, and finally getting multifamily in the Journal Center, I think it's been a dream of many stakeholders within the Journal Center for a long time to create a live-work-play district," said Josh Rogers, Titan's vice president of development. "We recognize the character and quality of Journal Center and what it represents as being one of the great office parks of the Albuquerque metroplex."
Allaso Journal Center's property operator will be Greystar Management, according to a news release. Pavilion Construction and ORB Architecture are the project's general contractor and architect, respectively. The two companies also worked on Titan's Allaso High Desert apartments, which broke ground in February near the base of the Sandia Mountains. Titan hopes to have the 281-unit project completed by 2023.
Rogers added that Titan's Allaso Vineyards project is slated to break ground in October. The 111-unit apartment complex will be located near Ventura Street and Holly Avenue, he said.