Albuquerque Development Thread


The Central Crossing has received a $3 million grant from the state to go toward finishing the second phase of the project east of the railroad tracks. Remember that the federal government canceled the Rail Trail's $11.5 million RAISE grant funding last year, which affected this portion of the overall project. The story below by Albuquerque Business First includes a pic showing the work that recently got underway for this portion of the Central Crossing.

https://www.bizjournals.com/albuque...ic-development-new-mexico-capital-outlay.html

The state of New Mexico announced Oct. 16 it is investing just over $4 million in capital outlay funding to projects in Albuquerque, Belén and Clayton.

Economic Development New Mexico, the state's economic development agency, will direct the funding to four projects:

• Downtown ABQ Mainstreet Arts and Cultural District and the City of Albuquerque, Central Crossing Phase II, $3 million
• Belén Historic Downtown Partnership and the city of Belén, Great Blocks project phase 2B, $410,000
• Clayton-Union County Economic Development Partnership and Town of Clayton, Clayton Entertainment & Food Container Park Phase II, $500,000
• Nob Hill MainStreet and the city of Albuquerque, Triangle Park renovation, $100,000

“Both the state MainStreet program and the local MainStreet districts work closely with local government partners to plan and fund these projects,” NM MainStreet Director Daniel J. Gutierrez said. “By working together, we’re able to build momentum and coordinate investments to help these communities thrive for years to come.”

New Mexico MainStreet’s Capital Outlay program awards funds to infrastructure-related projects with an economic impact focus. It did not disclose if other projects were considered for this funding.

Albuquerque’s Central Crossing will use the funding for utility work, lighting, landscaping and more for the project connecting Downtown, East Downtown, UNM’s Innovate campus and the upcoming Rail Trail.

...

nNV4Tes.jpg
 
The UNM Alumni Association recently had an event called "Campus Reimagined" which featured the new CCAT and Humanities structures and other big development and redevelopment projects that are underway and planned across the entirety of UNM's North, Main and South campuses.

https://www.unmalumni.com/s/1730/20...&pgid=3515&gid=2&cid=7236&ecid=7236&post_id=0

One of the most interesting projects discussed is the plan to redevelop the former car dealership properties along both sides of Lomas west of University Boulevard. The page for the Alumni event included a conceptual design for what UNM is planning for these properties that it owns in the area.

The plans include a 150-room hotel with conference center, 350 units of housing in two separate multilevel structures, and a total of 347,000 sq ft of "mixed-use" space spread across several structures. The plans also show a skywalk across University Boulevard connecting to the planned new School of Medicine structure.

nGnkJgn.jpg


UNM has long planned the redevelopment of these properties with such uses and structures. I hope the plans for "The District" by a private developer in this same area along Lomas Boulevard will help kickstart UNM's plans and bring this vision to reality!

Here's a pic of the area from a visitor to our city on Facebook last week. You can see some of the new state literacy institute under construction towards the bottom left edge of the pic as well.

(Click the link directly beneath the embedded image to see it in its original size)

https://www.facebook.com/shannon.sh...T3zobc5qk7trduUWmEsmvun2MjW7y6TyvdUjtdy4H6R4l

nNWeOs1.jpg

https://iili.io/nhxAXR9.jpg

In the pic above you can also see that due to the hills and sloping nature of the area, the literacy institute is indeed situated a good bit above the UNM shuttle parking lots and the old car dealership properties to its north. Perhaps the rendering which makes it look like it's located high up above its surroundings isn't too far off from reality after all.

nNWPdQf.jpg
 
The new UNM Humanities and Social Sciences structure will be having its groundbreaking ceremony and officially begin construction tomorrow afternoon. Below is a link to the announcement on UNM's website and updated renderings from the project page on their website as well. The project cost is now given as $130.5 million, The newest renderings show a slightly different design for the structure.

Spot new things like the sloped elements underneath the windows, slightly different window placement and refined looks, and the darker brick compared to the earlier renderings that we saw. It looks more brown-colored than the peach look shown in the previous renderings. We also get some new perspectives and views of the interior design of the structure.

https://news.unm.edu/news/building-...round-on-state-of-the-art-humanities-facility

In the heart of the Albuquerque campus, The University of New Mexico will begin construction on the new Humanities & Social Sciences building on Thursday, Oct. 22, on the site of the previous Humanities facility.

The estimated $130.5 million project is the culmination of academic, space, facility, and capital planning that began in 2020. An initial assessment determined that the more than 50-year-old Humanities building had reached the end of its useful life. Opportunities were identified to bring together academic programs, improve space utilization, and support evolving teaching and learning needs with the construction of a modern, welcoming facility, with spaces that encourage collaboration and informal interaction among students and faculty.

Planning began for a new facility in 2022, with needs assessments, requests for funding, and academic programming to assess the new building’s scope. The project’s physical work began in July 2025, with the demolition of the original Humanities building and expansion of utilities and infrastructure. Design is currently being finalized, headed by Studio Tsien of New York and SMPC of Albuquerque.

Funding sources include $52 million from General Obligation Bond 3, which was approved by voters on Nov. 5, 2024, and $40 million from Severance Tax Bonds with another $2M of General Fund support contributing to the demolition of the old Humanities facility. UNM is contributing 20% of the facility replacement costs.

...

The College of Arts & Sciences has set a fundraising goal of $10 million to support additional elements of the project and invites anyone who has benefited from a humanities education to donate and help educate future generations of Lobos.

...

Construction is estimated to take approximately 2.5 years, with teaching and research operations expected to begin in 2029 upon completion and opening.

...

https://artsci.unm.edu/hss/

Humanities_Groundbreaking-PR_1920x1080_Exteriors_hero.jpg


Humanities_Groundbreaking-PR_1920x1080_Living%20Room_hero.jpg


Humanities_Groundbreaking-PR_1920x1080_Outdoor%20Terrace_hero.jpg


nNhivO7.jpg


nNhi8b9.jpg


nNhigWu.jpg


Here's one of the previous renderings of the project to compare with the new exterior rendering above.

nNhpJRf.jpg
 
Voters in the election earlier this month passed the last bit of funding necessary to construct the new UNM School of Medicine structure at Lomas and University. The $116 million in general obligation bond funds will go towards the $636 million total cost of the project.


NEW MEXICO (KRQE) – Voters approved a bond that will go towards statewide higher education improvements, including a new medical school at the University of New Mexico. GO Bond 3 will provide more than $350 million for improvements to colleges, universities, special and tribal schools statewide. UNM will receive $126 million; of that, $116 million will go towards building a new education and research facility for the UNM School of Medicine.

The facility is expected to open in fall of 2030. The bond will also fund other projects, including UNM buildings in Gallup, Los Alamos, Taos, and Valencia.

D5BBC018C99D82A1FE96815A03BB18E6.jpg


ENTRANCE-courtesy-UNM-Health.jpg
 
Nob Hill News last week had an update about projects along Central Avenue between Girard and I-25. Below are a couple of the pics that they featured, including a great pic of the new food hall and extended-stay hotel being built at The Highlands. The first pic is of the new UNM Center for Collaborative Arts and Technology structure.


9143f820-f990-47aa-9612-4ce09f0d0287_2048x1152.jpeg


939fc1a5-8d58-40d2-aabf-c3ba133267bf_2048x1152.jpeg
 
Voters in Albuquerque also got rid of the provision in the city charter requiring a vote on city spending of more than $10 million for a performing arts center.

This paves the way for the city council alone to approve spending for a new performing arts center. It's assumed any such project will be built in Downtown Albuquerque, and specifically on the Civic North site (the parking lot north of Civic Plaza).

Downtown%203_hero.jpg


In the run up to this year's election and the vote on removing this provision in the city charter, Councilor Joaquin Baca talked about a project that would include not just the performing arts center but also residential and other uses. I'm trying not to get too excited since he was so out of the loop for the recent Lomas and Broadway RFP, but I'm hoping we will indeed see such a nice, mixed-use project emerge for the future performing arts center.

Hopefully some sort of new RFP will be issued and some of the same players and proposals from the failed Civic North RFP will revive their plans, such as for the spectacular Reunion Center proposal that had it all, a performing arts center, office space, a hotel and residential uses in a new tallest structure!

50263636052_9a4ee0d57c_o.png
 
Here's another great aerial pic, this time showing the Rio Bravo Boulevard bridge replacement project over the Rio Grande in the South Valley that recently got underway. The $154 million project is also expected to be completed in 2029. The pic was posted by State Senator Michael Padilla last month on his social media accounts.

oKgJ6u9.jpg



Here are a few pics from the ground that the New Mexico Department of Transportation has posted on its social media accounts over the past month as well. The first few pics show the early part of the project to construct a causeway and help divert the Rio Grande into a controlled channel in order to construct the new river crossing. The second and more-recent set of two pics show the new foundations being built for the new crossing just north of the existing bridge structures.

oKgNjRe.jpg


oKgNMf2.jpg


oKgNEil.jpg


oKgNWU7.jpg



oKgNNDb.jpg


oKgNwOu.jpg



Here's a pic showing the new railroad crossing and improved intersection with 2nd Street that was part of the overall project to reconstruct Rio Bravo Boulevard between 2nd Street and Broadway in the lead up to the new crossing project. This portion was completed and had its ribbon-cutting ceremony back in August.

oKgEbls.jpg


oKgZfwv.jpg



Finally, here's the rendering showing the new Rio Bravo Boulevard crossing as it will look when the project is completed.

oKgGjgs.jpg
 
Here are a couple more nice aerial pics of the Rio Bravo Boulevard bridge and 2nd Street intersection/railroad crossing project. They were taken and posted last month to Facebook by State Senator Moe Maestas. Both he and Senator Padilla and other local leaders were part of an aerial tour of infrastructure and other projects in the South Valley, on the Westside and in Downtown Albuquerque that was facilitated by the Bernalillo County Sherrif's Office helicopter.

oKriWiP.jpg


oKri0Rj.jpg


 
Here are several more nice aerial pics taken during the aerial tour from both of the state senators' posts above. You can spot several current and previous projects in the South Valley, on the Westside and in Downtown Albuquerque.

They include The George apartments in West Downtown, the San Roque, La Serena and West Mesa Ridge apartments on Coors Boulevard, two of the Amazon facilities on the Westside, the NBC Universal studio project north of Downtown, and the UNM Hospital and Presbyterian Hospital expansions.

Be sure to click the links to the posts above to see a few more nice pics that I didn't choose to embed here in the thread.

oK49pUl.jpg


oK49ml4.jpg


oK4H9J2.jpg


oK4HHRS.jpg


oK4HFWu.jpg


oK4HB0x.jpg


oK4HKib.jpg


oK4HUXe.jpg


oK4He72.jpg


oK4HOdl.jpg
 
Here are just a few more nice recent aerial and skyline pics that I've seen on social media in the past month that I wanted to post and share here.

oKPyWxt.jpg


oKPyMbI.jpg


oKPyGON.jpg



HWr1mDzacAAXW2v.jpg:large




nbEsTcN.jpg


Here also is a thumbnail and link to a nice short video showing the skyline as you drive down Lomas from I-25. This has always been one of my most favorite views of the skyline, especially while driving.


oKPpF6J.jpg
 
KOB-TV has an update about the Uptown Connect project. They say the project is now fully funded at $108 million, but for a reduced project scope.

It looks like it lost one floor and has been reduced by 41 units in the larger, affordable north structure. The smaller, market-rate plaza structure in the middle looks like it hasn't been downsized and is still at 22 units in five floors. This initial portion of the overall project now has 198 total units. The underground parking garage has also been cut in half, according to the story.

No word on the status of the future market-rate south structure and whether it will also be reduced.

They say that the city now hopes to break ground on the project next month.


ALBUQUERQUE, N.M. – Albuquerque leaders say Uptown Connect could break ground soon after closing a funding gap on the $108 million housing, transit and retail project.

ABQ Ride leaders said the long-planned Uptown project in Albuquerque will turn an empty lot into a housing and transit hub after more than a decade of work.

“This project has been it’s been an animal, it’s been a beast,” said Bobby Sisneros, deputy director of ABQ Ride.

Sisneros said project leaders found a funding gap earlier this year and changed the design to move the project forward.

“The only alternatives we had left at that point was to start making some changes to design,” said Sisneros.

They cut the project from five stories to four and reduced the underground parking garage by half to 78 spaces.

What changed?

“We’re gonna have 176 affordable units with 22 market-rate units in this project for a total of 198 units,” said Sisneros. “Once that gap was closed, we were able to start racing towards the finish line, which is where we’re at now.”

The city had aimed for a summer 2026 groundbreaking, but Sisneros said the funding gap delayed that plan. Leaders now hope to close next month and schedule a groundbreaking.

“We’re right on schedule. We’re fully funded. All the dollars are in place,” said Sisneros.

Adam Silverman, vice president of development for Geltmore, LLC, said he wants to see construction begin. His family has done business in the Uptown area for more than 40 years, and he said he believes the project will help the area.

“I think good pushes out the bad. I think density is really important because Uptown is becoming a place that people want to live and work. There’s also the play aspect of it with the mall and Winrock,” said Adam Silverman.

“I think it really does give our city hope that you know we do deserve nice things in Albuquerque, and we should have them. And hopefully, they do bring some new retailers in town,” said Silverman.

The final price tag for Uptown Connect is just over $108 million, with private, city, county, state and federal funding. The project will also include a brewery, a dog park and other retailers in the future.

1183156_thumbnail.png


Here's the previous rendering of the project to compare with the updated one from the story above.

Uptown-Connect-Rendering.jpg


Note that in their story they state that it has been reduced to four stories but the new rendering clearly shows five and the rendering above shows it with six. It was already reduced from seven stories in the earliest conceptual rendering and the first refined project rendering that we originally saw.

Artboard-CABQLegiMage.jpg
 
I went looking for more information about the Uptown Connect project on the city's website just to clear up any possible confusion with the wording of the KOB-TV story above.

The project has indeed been reduced to five floors from the previous six. The affordable north structure does indeed now have 176 units instead of the 217 previously when it was 6 floors. The market-rate plaza structure remains unchanged with 22 units in a five-floor structure. The underground parking garage has indeed been reduced by about half and will now only be located below the north structure, instead of extending underneath the transit plaza as well. Its capacity will now be for 78 cars instead of 183 previously.

Below are the updated renderings, floor plans and site layouts from their most-recent submittal before the Development Facilitation Team back in September. I've also included a bit of the letter and communication from the architects to the DFT staff where they explain the reductions that they were presenting and break down the updated parking requirements and reductions as well. The updated plans were ultimately approved by the DFT.

ofSJLq7.jpg


ofSd9zQ.jpg


ofSd2qP.jpg


ofSd311.jpg


ofSdq7a.jpg


ofSdu1t.jpg


ofSd52n.jpg


ofSd77s.jpg


ofSdYkG.jpg


ofSdlI4.jpg


Here's the main rendering from above that I cropped and cleaned up the best I could in the bottom right corner where the info box was located. I wanted to give a nicer result showing just the project itself.

ofSdkQV.jpg
 
It looks like the Sheraton Uptown hotel will be rebranding to the Hilton Albuquerque Uptown next month while it's undergoing a complete renovation. They are accepting renovations under the Hilton brand beginning December 11th. Below is a link to the hotel’s new page on Hilton's website, along with renderings of what the renovated hotel will look like.


hilton-render-front-entrance.jpg


new-galleria-foyer-abq-uptown.jpg


new-abq-uptown-lobby-bar-rendering.jpg


restaurant-color-rev-03-2026-06-30.jpg


new-uptown-boardroom-abq-uptown.jpg


new-king-room-abq-uprown-rendering.jpg


02-doublequeenroom-abq-phase3-r8-2026-02-23.jpg


Albuquerque Business First reported about the hotel’s interior and exterior renovation back in June when the building permit was issued.


A $3.1 million commercial alteration at the Sheraton Albuquerque Uptown, at 2600 Louisiana Blvd. NE, was the largest commercial permit last week, according to Business First's review of building permits.

The permit, granted to VKW Construction LLC, was for $3.1 million and encompasses 169,785 square feet.

Earlier this year, Albuquerque Business First reported that California-based Modulus Architects & Land Use Planning submitted documents for a 100-unit apartment complex totaling over 65,000 square feet on the eastern portion of the Sheraton Albuquerque Uptown site.

The Sheraton Albuquerque Uptown is the seventh-largest hotel in the city, according to an Albuquerque Business First review.

Marriott, which operates the hotel, did not respond to a request for comment on what work is being done.

As you can see above, they also mentioned the plans to build a new apartment building on the northeastern corner of the hotel’s property, but of course that plan was withdrawn earlier this year. Perhaps the hotel’s renovation and rebranding had something to do with that, but I'm still hoping the plan will eventually be resubmitted and the project will go forward.

sheraton-apartment-rendering*3000.jpg


Here are a couple of nice pictures showing the hotel and the surrounding area as it exists now. In the aerial pic you can see where the proposed apartment structure would be built on the northeast corner of the hotel, directly across from the existing Uptown Square apartments, right on the corner of Chama Street and Phoenix Avenue.

uptown-square-albuquerque-nm-primary-photo.jpg


image.jpg
 
Nob Hill News had an update this morning about projects around their coverage area. Below are a few of the projects that I found most interesting. Note that it looks like the early work and demolition of the existing structures on the site of the new UNM School of Medicine structure has finally gotten underway.


Hotel Voco

Nob Hill entrepreneur and developer Rahim Kassam has begun a multimillion-dollar renovation at the former Hotel 505, located at 900 Medical Arts Ave. NE, in the Spruce Hills neighborhood near Lomas and Interstate 25.

The 120-room hotel, which has been closed for many months, could reopen sometime in spring 2027 under the name Voco. It is slated to feature a full restaurant and lobby bar.

4e9e54d2-3625-48a9-9503-98551568e674_4608x3456.jpeg


‘The District'

No dirt has moved yet, but a $50 million mixed-use project with hotel, restaurant and retail components called “The District” is expected to rise on a 5-acre lot at 1300 Lomas Blvd. NE, where a car dealership operated years ago. The site is near the Medical Arts Historic District and the Spruce Park neighborhood.

ac2c1861-0c0f-40af-8d4d-b352cd1eec2f_2506x1190.png


New Mexico Literacy Institute

Progress on a state of New Mexico initiative—the New Mexico Literacy Institute—can be seen on a hill from the intersection of Lomas and University. Located on 4 acres at 1550 Mesa Vista Road NE, the goal of the 30,000-square-foot, single-story facility is to provide space for programs that strengthen literacy for learners of all ages—up to 500 people at a time—and provide resources at no cost.

The $30 million center will feature classrooms, a library, a lounge, offices and a coffee shop.

Workers have been hustling all year to try to reach a goal of completing it before 2027.

6ab2d777-a612-418c-9424-2dd2bc91487b_2048x1152.jpeg


UNM School of Medicine

The first signs of what will be not only the largest project in our coverage zone, but one of the most significant ones in the state, is entering its initial visible stages after years of planning and design.

On the northeast corner of the busy intersection of Lomas and University, fences are being erected to mark where UNM’s new School of Medicine will be built, and hopefully completed, by 2030. The massive undertaking has a budget of more than $600 million and is designed to replace the current school, the aging Fitz Hall.

9fb629e4-7b10-40fe-a6a2-f3bd61fd15a3_2048x1152.jpeg


Velarde Center for Philanthropy

Located between UNM’s main campus and UNM Hospital at Lomas and Yale is the under-construction Velarde Center for Philanthropy. The facility will serve as the headquarters for the UNM Foundation’s philanthropic operations and related special events.

The three-story, 28,000-square-foot building was designed by FBT Architects and is being built by Bradbury Stamm Construction. The $26 million project is expected to be completed by next summer.

e426533a-4add-4fa7-b7eb-d84bc490bf6b_2048x1152.jpeg


Here also is a pic showing the earth work and early construction of the new UNM Humanities and Social Sciences structure. It was posted yesterday to the Albuquerque Memories Facebook group.


oqCIedG.jpg
 


Back
Top