Albuquerque Development Thread

The new state film school at the Rail Yards had its ribbon-cutting ceremony yesterday. Below is a report by KOB-TV and a few pics of the ceremony and facility that were posted by the mayor and CNM on their social media accounts. CNM will operate the facility along with the New Mexico Media Arts Collaborative.

https://www.kob.com/new-mexico/albu...film-and-digital-media-facility-for-students/

ALBUQUERQUE, N.M. – CNM has opened a nearly $73 million film and digital media training center featuring industry-standard sound stages and a Dolby-certified speaker system.

CNM opened the Film and Digital Media Training Center on Tuesday morning after four years of work. School and city leaders said students will begin using the facility this fall.

The center includes sound stages, postproduction suites, flexible production spaces, classrooms and advanced equipment and technology. Leaders said the Dolby-certified speaker system is rarely found in an educational setting outside Los Angeles.

“We wanted to keep the historic nature of the site, and so we built a project where we have a building built inside the building,” said Samantha Sengel, former vice president for workforce and community success at CNM. “Rather than try to figure out how to make the historic skeleton accommodate all of the new things we were doing, our architecture team figured out how to build essentially all these boxes inside so everything could be maintained while allowing us to innovate for the future.”

Sengel, Albuquerque’s chief administrative officer, said Mayor Tim Keller started the project in 2018 when she was serving as CNM’s vice president for workforce and community success. She said Keller came to CNM looking for a vision for the Rail Yards, where the building had sat unused for 50 years.

“I don’t know if there’s anything quite like this in the country right now,” said Mateo Frazier.

Frazier, executive director of the New Mexico Media Arts Collective, said the center gives students opportunities that previously did not exist in facilities not designed for film training.

“We didn’t have purpose-built spaces. We basically used whatever we had available to us,” Frazier said. “This is truly a dream come true.”

Alan Trever, academic affairs director for CNM’s film and digital media program, said the center also includes a theater with more than 100 seats and two educational sound stages.

“They will also be able to go into full recording studios, sewing labs, hair and makeup labs and fabrication labs. It’s just an endless amount of new technology,” Trever said. “They’re built to industry standards. If they go to a Netflix studio, a studio in Los Angeles, Atlanta or New York, they will experience the same soundstage design used throughout the industry.”

With the film and technology industries continuing to evolve, Trever said the facility will help prepare students for future workforce demands.

“We are hoping that this facility attracts not only traditional filmmakers and film content creators, but also creators working in new media, emerging technology and vertical content,” Trever said. “We also want to support work in music and other creative fields.”

School leaders said they hope to add more programs by fall 2027, including audio and music production, television production and creative technology in emerging media.

CNM-opens-film-and-digital-media-facility-for-students.jpg


https://www.linkedin.com/feed/update/urn:li:activity:7500694268613890048/

https://www.linkedin.com/feed/update/urn:li:activity:7500682931028402176/

nHXvUMb.jpg


nHX6NqX.jpg


nHhS7NS.jpg


nHhZwPV.jpg


nHh9j9I.jpg


nHhByBI.jpg


nHhKdDN.jpg


n9miWkg.jpg


nHWDj4I.jpg


The new film school occupies the former Boiler Shop structure at the Rail Yards, which is adjacent and connected to the Tank Shop structure, where part of the Rail Yards Market is held every weekend. As part of this new project, they built a wall to better separate the two spaces. It was covered with a new mural by artist Shepard Fairey, who's famous as the artist behind the Obama "Hope" image. Below are a couple of nice pics posted by him and the city back in late July when the mural was complete and first unveiled.

https://www.instagram.com/obeygiant/p/DbO8C4AgRGd/

n9tKUGe.jpg


https://www.cabq.gov/artsculture/ne...r-mosaic-becomes-albuquerques-newest-landmark

n9tKg6u.jpg
 
Here's an update about the state fairgrounds redevelopment project. The state says that they expect to choose a development partner by the end of the month. But they say that the expected timeline for beginning construction on projects isn't until late 2028 or early 2029.

That includes the proposed stadium, which the state says the "anchor developer" will be responsible for choosing what kind of stadium it will be and which prospective team or tenant will use it, by way of an RFP that would close in November.

The story by KRQE below includes a very brief statement by the New Mexico United on whether they would make a proposal to be the stadium tenant.

https://www.krqe.com/news/albuquerq...rch-for-developers-for-the-state-fairgrounds/

ALBUQUERQUE, N.M. (KRQE) – For months, state leaders have looked at how to redevelop the state fairgrounds, including adding housing and a stadium. KRQE has now gotten an update on where those plans stand. The state wants to revamp more than 200 acres on the Expo New Mexico property, which is located in Albuquerque’s International District.

State officials say this project will provide much-needed upgrades. “It’s basically a turning point and once-in-a-generational opportunity,” said Anna Silva, Cabinet Secretary for the state’s General Services Department.

The state said plans to improve the state fairgrounds are in motion. Earlier this year, the Fairgrounds District Board voted to move forward with a plan to redevelop much of the west side of the property. Those plans consist of building housing and even a new stadium. “Not only upgrading the infrastructure, but also breaking down socio and economic divides, upgrading the facilities, and improving the overall fair,” said Silva.

Anna Silva is the cabinet secretary for the state’s General Services Department, the group that originally hired Stantec to draft the master plan. She said that right now, they are looking to select the anchor developer, who will then send out a request for proposals to pick tenants. “The contractual obligations of the anchor developer are going to be to develop the stadium and construct the stadium as well as develop and design and construct the housing,” said Silva.

Silva said they’re hoping to select that anchor developer by the end of this month. The redevelopment plans also include new roads through the fairgrounds property, a public green space, and new business space.

KRQE asked if a tenant has been selected for the stadium, but the state said that’ll be up to the developer to choose someone by November. The state said this new stadium would be able to hold about 15,000 people.

KRQE reached out to New Mexico United to ask if they had interest. In a statement, they said:

"We are excited to see it and, assuming it’s an appropriate fit, participate in the RFP."

But regardless of who is selected to build, the state says construction could still be far out. “Of course, the facility has to be designed first, and design will be probably about a year to complete the design of the stadium and a year for the design of the housing units. So we’re not looking for construction to start probably until the very end of 2028 or the beginning of 2029,” said Silva.

When it comes to the New Mexico State Fair, Silva said right now it’s not going anywhere. “So part of the plan in the focus is to keep the fair operations ongoing throughout the design, throughout the construction,” said Silva.

The state also told KRQE that they’re still in conversations to acquire properties on the corner of San Pedro and Central. They said they will work with each owner individually throughout the design. The state said they currently have $206 million earmarked for this phase of the project.

Overall_Phase-1-courtesy-State-of-New-Mexico.jpg
 
Curia has opened its $200 million Albuquerque expansion that has created an additional 250 production jobs at their site in the Renaissance area of North I-25. With this expansion they say that will now employ about 600 people in Albuquerque. The expansion involved construction of a 2-story, 70,000 sq ft addition to house a 5th fill line for their pharmaceutical production.

https://www.bizjournals.com/albuque...curia-add-250-jobs-albuquerque-expansion.html

Curia opened a $200 million expansion of its Albuquerque facility Sept. 3, adding a fifth line and about 250 jobs to its local plant.

Curia operates "a major pharmaceutical manufacturing and research campus in Albuquerque, specializing in the aseptic fill-finish and freeze-drying, or lyophilization, of sterile injectable medicines and vaccines," according to Yahoo Finance. The local facility fills vials and syringes with approved medications, partnering with pharmaceutical and biotechnology companies to package their products.

CEO Philip Macnabb said the expansion adds 70,000 square feet to the existing 200,000-square-foot plant. The facility currently employs 350 people, and the company plans to increase its headcount to about 600 staff with the new expansion.

State officials said the average salary of the new employees will be more than $50,000.

“It’s not quite double but a significant increase,” Macnabb said.

Curia is based in Albany, New York, and has facilities worldwide, including nine in the United States.

With the new line, Curia will be able to produce 400 vials per minute in the commercial fill-finish operation, depending on the size, with up to 200 million units of either syringes or vials per year, according to Macnabb.

Macnabb said Curia had been in Albuquerque for about 40 years, including an expansion about 20 years ago to the current facility at 4401 Alexander Blvd. NE.

The more recently unveiled expansion has been in the works since 2021 and used resources from federal, state and local governments.

Gov. Michelle Lujan Grisham said the expansion was a team effort across governments and the company.

“It's a shared partnership. Every resource is leveraged,” she said. “Every opportunity is realized.”

Albuquerque Mayor Tim Keller said the expansion is a reminder of the decades of work in the medical research field in New Mexico.

“This is an overlooked core component of who we are as New Mexicans. And the history as was stated is pretty straightforward, but we want to remind folks now with Curia’s expansion,” he said.

The state of New Mexico provided more than $5 million in Local Economic Development Act funding for the facility. The city of Albuquerque and Bernalillo County each provided $250,000 in LEDA funding as well.

The expansion was assisted by a cooperative agreement with the Biomedical Advanced Research and Development Authority, part of the U.S. Department of Health and Human Services' Administration for Strategic Preparedness and Response.

ndHYpzg.jpg


https://curiaglobal.com/albuquerque-expansion-ribbon-cutting-press-kit/

ndH1SoX.jpg
 
Here's another great aerial pic taken during a balloon ride showing the New Mexico Literacy Center under construction near Lomas and University. It was taken and posted on Facebook a couple of weeks ago by Coddiwomple Ballooning, a local balloon ride company with a special gondola that accommodates people with mobility issues who need wheelchairs, etc.

(Click the link directly beneath the embedded image to see it in its original size)

https://www.facebook.com/permalink....FVXmMKqbMk4Ve4kjKpjQiXJUql&id=100068475397471

ndJnTas.jpg

https://iili.io/ndJnu8G.jpg

Here are a few pics taken back in late July showing the New Mexico Literacy Center construction from the ground. They were taken during a site tour for members of CREW New Mexico and posted on the group's LinkedIn account.

https://www.linkedin.com/feed/update/urn:li:activity:7486565447048507392/

ndJAEXf.jpg


ndJAlbs.jpg


ndJA1zG.jpg


ndJAcen.jpg


ndJAVql.jpg


ndJAW12.jpg
 
The UNM Foundation has announced that the school has reached over $1 billion in endowment for the first time in its history. It joins an elite group of universities and colleges to have endowments greater than a billion dollars, currently numbering less than 135 institutions across the country.

https://www.facebook.com/UNMFoundat...able-milestone-a-1-billion-/1460463072795606/

nddmwG4.jpg


Here's a thumbnail and link to a recent video that the UNM Foundation posted on its Facebook account showing the construction of its new headquarters across from UNM Hospital.

https://www.facebook.com/reel/4542695639298331

nd239eV.jpg


Here are another couple of pics showing a concrete pour for the structure at nighttime that Duke City Redi-Mix and a commenter posted last month on its Facebook account.

https://www.facebook.com/photo.php?fbid=1651397680327770&set=pb.100063726605733.-2207520000

nd2CrGI.jpg


nd2nZUF.jpg
 
Here's a nice pic showing the UNM Cancer Center and its recent addition. It was taken and posted this morning by the Rainbow Ryders pilot on his Facebook account. I've also included another nice aerial pic from his post. It shows the UNM North Campus Area and the Cancer Center in the upper left background of the pic, with Downtown Albuquerque in the upper right background. The Big I is at the center of the pic, and Midtown Albuquerque is in the foreground.

(Click the links directly beneath the embedded images to see them in their original size)

https://www.facebook.com/kris.brade...u4VjhHu3YsJYzuzRoNd46mCuBC6JsS7RvJ74CY4vLzMrl

nd4RAn1.jpg

https://iili.io/nd4vhIp.jpg

nd4RTZP.jpg

https://iili.io/nd4vjhN.jpg
 
Revel Entertainment has announced that they will be having a groundbreaking next week for their new outdoor venue, the 888-seat amphitheater on the empty lot adjacent to their existing 3,000-capacity indoor venue. They say that they expect the new venue to open next spring.

https://www.bizjournals.com/albuque...l-entertainment-new-outdoor-amphitheater.html

Revel Entertainment is breaking ground on a new outdoor amphitheater in Albuquerque. The expansion will create a new outdoor venue for live music and entertainment adjacent to Revel’s existing indoor campus.

A groundbreaking event is scheduled for Sept. 18. Renderings by Equiterra Regenerative Design show a venue featuring pastel-blue colors and repurposed cargo shipping containers.

The site was previously approved for an indoor racing and go-kart facility, but the project was never built.

Current plans for the 24-acre site now include an outdoor amphitheater with space for 888 people, including about 45 VIP seats, according to previous Business First reporting.

Back in July, Revel received unanimous approval from the city’s Environmental Planning Commission.

Daniel Chavez, founder and owner of Revel Entertainment, said the amphitheater is expected to open in spring 2027.

"We've always believed in the power of live entertainment to bring people together, and this project allows us to take that vision to the next level,” Chavez said. “We're excited to invest in Albuquerque and create a new outdoor space where people can experience live music and entertainment."

Revel recently acquired the property next to its current venue and received approval from the city of Albuquerque to move forward with the development. The exact cost of building the new outdoor venue was not disclosed.

The project is now moving into construction. More details about the amphitheater, including its final design, events and opening date, will be announced as development continues.

The existing venue is located at 4720 Alexander Blvd. NE, near the intersection of Interstate 25 and Montaño Road, just down the street from Topgolf. The new outdoor venue will be built on an undeveloped parcel at 1500 Desert Surf Circle NE.

nFzN321.jpg


nFzNJEB.jpg
 
Albuquerque Business First has an update about the La Plata Apartments on 4th Street in the North Valley. The developer says that they expect the project to be completed by the end of the year.

https://www.bizjournals.com/albuque...lata-apartments-albuquerque-north-valley.html

Before construction began on a new 24-unit apartment complex in Albuquerque’s North Valley, the undeveloped parcel had an interesting role: overflow parking for a wedding.

At the northeast corner of Fourth Street and La Plata Road, La Plata apartments developer Shastyn Blomquist said the property had historically been used for parking. When a nearby neighbor asked to use it for overflow parking for a wedding, she was happy to accommodate them.

“I love those little stories because they’re a reminder that even an undeveloped piece of land can already be part of a neighborhood’s history,” Blomquist said. “That said, I'm also very aware of the need for workforce housing and have a strong belief in developing these types of infill parcels to fill that need.”

Blomquist said construction on La Plata began in September 2025, with completion anticipated by the end of 2026 for the two-story complex featuring 24 one-bedroom units. The complex is located at 333 La Plata Road NW.

The rent for the units is still being finalized as Blomquist gets closer to leasing, but she said they are positioning them to be accessible and competitive with comparable new apartments in the North Valley.

La Plata apartments are designed to make efficient use of their square footage while still feeling comfortable and livable. Units include an in-unit laundry, while the complex features enclosed bike storage, a pet waste station, two EV charging stations and easy access to public transportation.

Scott C. Anderson & Associates Architects is the architect, and Jose Rodriguez of J&S is the general contractor. The project is a contemporary Southwestern building that uses modern earth tones and steel.

The city of Albuquerque’s Metropolitan Redevelopment Agency has also partnered on the project. The property is within the North Corridor Metropolitan Redevelopment Area, and the project was approved for the city’s Redevelopment Tax Abatement program, which is a tax incentive for redevelopment projects. The cost of the project was not disclosed.

Blomquist said it isn’t a huge project, only 24 units. But she said adding housing doesn’t require massive construction or disrupting an existing neighborhood's character.

“We were very intentional about both the use and the scale," she said. "We could have pursued a more commercially intensive project on the site, and the zoning would have allowed us to build taller. Instead, we chose residential and limited the building to two stories because that felt more appropriate next to the existing homes and townhomes."

nFzVQG1.jpg


nFzVLCP.jpg
 
Homewise had a ribbon-cutting ceremony yesterday for its Sombra del Oeste townhome development on the Westside. The first eight of its 72 units have been completed and come on the market for homebuyers.

Below is a story by Albuquerque Business First and pics of the development by a Homewise broker marketing the homes on Facebook, along with pics of the ceremony by Housing New Mexico on its LinkedIn account.

https://www.bizjournals.com/albuque...e-sombra-del-oeste-albuquerque-townhomes.html

Homewise’s Sombra del Oeste, a brand-new townhome community in southwest Albuquerque, will celebrate its grand opening Sept. 10.

The new, all-electric townhome community at 8948 Mountain Ash Ave. SW features 72 homes.

Homewise, a nonprofit homeownership organization serving New Mexico, developed the community.

“Sombra del Oeste features two-story townhomes built with modern craftsman style architecture,” the Homewise project website reads.

The community offers three floor plans:

• The Sandia, with two bedrooms, 2.5 bathrooms and 1,176 square feet, starting at $300,000.

• The Manzano, with three bedrooms, 2.5 bathrooms and 1,416 square feet, priced at $325,000.

• The Jemez, with three bedrooms, 2.5 bathrooms and 1,638 square feet, priced at $350,000.

Down payment assistance is available for income-qualified buyers, according to Homewise’s website. Contact Homewise for more details on assistance.

Homewise broke ground on the project in 2024 near the intersection of 98th Street and Gibson Boulevard.

The community sits near schools including Solare Collegiate Charter and Atrisco Heritage Academy.

Lisa Huval, Homewise’s senior director of real estate development, told Business First in 2024 when it was announced that the project aims to address Albuquerque’s housing shortage, particularly the limited supply of starter homes.

“This is an important part of helping to address the lack of homes for sale in Albuquerque,” she said at the time.

The grand opening celebration and special ribbon-cutting ceremony runs from 9-11 a.m. Sept. 10. and is open to the public.

Homewise President Johanna Gilligan will lead the festivities, joined by Bernalillo County Manager Cindy Chávez; New Mexico Cabinet Secretary Sarita Nair; Director of Policy and Planning for Housing New Mexico Robyn Powell; and U.S. Bank Business Banking Relationship Manager Jordan Franco.

nfjuoNf.jpg


https://www.facebook.com/brennan.po...xP1REdkLeHt9y8nGFBbvBSHBxReFhjjphpyBbbgugfGhl

nfjYp9t.jpg


nfj1e24.jpg


nfj1N4f.jpg


nfj1wEG.jpg


nfj1jBs.jpg


https://www.linkedin.com/feed/update/urn:li:activity:7504282669283946497/

nfjwmwx.jpg


nfjwbuj.jpg


nfjwtyb.jpg


Here's another pic of the development by the Albuquerque Journal showing more of the townhomes under construction.

https://www.abqjournal.com/business...me-community-in-southwest-albuquerque/3119023

3099805.jpg
 
Array Technologies also had a ribbon-cutting ceremony and officially opened its new headquarters and manufacturing facility on the Westside earlier this week. Below is a partial quote with pics from their press release, along with a few more pics of the ceremony and facility that the mayor posted today on his LinkedIn account.

https://www.globenewswire.com/news-...ng-facility-with-ribbon-cutting-ceremony.html

Array Technologies has cut the ribbon on a new 216,000-sq-ft manufacturing facility in Albuquerque, New Mexico. Company representatives say the new plant represents a significant advancement for domestic manufacturing of U.S. solar technology.

The New Mexico-based developer of solar tracking technology and fixed-tilt products, foundation and other balance-of-system solutions, software and services celebrated the opening of its more than $50 million manufacturing facility on Sept. 9. The new plant is roughly three times the size of Array’s prior Albuquerque site, expanding the company’s domestic manufacturing capabilities and supporting approximately 300 jobs across production, assembly, design, engineering, customer service and other functions.

Founded and headquartered in Albuquerque for more than 35 years, Array has grown from its New Mexico roots into a global solar technology leader with more than 100 GW of tracker deployments worldwide. The new facility builds on that history, and expands ARRAY’s ability to deliver benefits to customers through greater supply-chain control, shorter delivery times, lower costs, and increased flexibility.

“Array was founded here in Albuquerque, and manufacturing has been at the heart of our company from the beginning,” said Kevin Hostetler, CEO of Array Technologies. “This investment reflects our confidence in the future of Array, our commitment to our customers and our continued belief in American solar manufacturing. By expanding what we can produce here at home, we are strengthening our supply chain, creating skilled career opportunities and building capabilities that will help us serve our customers for years to come.”

nfw29kP.jpg


nfwerXf.jpg


https://www.linkedin.com/feed/update/urn:li:activity:7504204958838435840/

nfOpTiv.jpg


nfOpoDg.jpg


nfOpIWJ.jpg


nfOpzxa.jpg


nfOpYJI.jpg
 
Here are the most recent pics I can find of the Amazon "Project Lola" site under construction on the Westside. They were posted back in July on LinkedIn by a project coordinator for the builder, Ryan Companies.

https://www.linkedin.com/feed/update/urn:li:activity:7478201000051376128/

nobMhzP.jpg


nobMWmB.jpg


Here's further confirmation that the project is indeed for Amazon on the electrical contractor's website. They describe the project as being a delivery station with 306,000 sq ft of space. I've also included a few of the pics from their website showing a bit of the early interior work and a more recent view.

https://dkdenterprise.com/portfolio/project-lola-amazon/

DKD-Enterprise-Electrical-Contractors-Amazon-Project-Lola-2-rotated.jpeg


DKD-Enterprise-Electrical-Contractors-Amazon-Project-Lola-1-rotated.jpeg


DKD-Enterprise-Electrical-Contractors-Amazon-Project-Lola-1.png
 
The Albuquerque Development Commission had its monthly meeting this afternoon. As part of their meetings they have a presentation from the director of the Metropolitan Redevelopment Agency who updates them on current projects, initiatives, policies and processes, etc.

https://www.cabq.gov/mra/albuquerque-development-commission

Today's update by MRA director Terry Brunner included information about the Lomas and Broadway RFP that recently closed. He stated that they received one submission and that they will be negotiating with the Albuquerque Metropolitan Arroyo Flood Control Authority to sell the property in order for the project to go forward. AMAFCA co-owns the property along with the city. It of course has a history to do with flood control as the former site of a temporary ponding area for runoff and floodwaters in the area during heavy rains.

Below are the basic elements and information that he revealed about the lone submission and proposal that they received for the RFP by Noblespace, which is a company that develops scientific office and lab spaces. Remember that they are also involved in a project at Innovate ABQ further down Broadway at Central Avenue. It would seem that this project would serve to extend the Innovation District north of Lomas Boulevard as well.

Lomas and Broadway RFP:

1 submission by Noblespace

90,000 sq ft of space
2 buildings
offices and labs
event space
cafe
100+ jobs

I'm disappointed that there weren't more proposals and submissions to the RFP, but realistically, I didn't think we'd see much due to the zoning situation and the very late effort to change the zoning to allow residential uses on the site. This actually doesn't sound like a bad project at all and it fits with what I thought could be one of the better uses and projects that we could hope for on the site under the existing zoning.

MRA Director Brunner didn't specifically say that they accepted the proposal by Noblespace, but I assume that's so and that they will now be going forward with project agreement negotiations, etc. I look forward to whenever the project is brought before the ADC for review, possibly as soon as next month's meeting. Hopefully we'll get to see the renderings, site layouts, etc. for the project. I'm only expecting buildings in the 2-3 story range, but perhaps we may get something taller.

Again, this might not be a dream project for the site, but it's certainly a nicer use than what could have been proposed under the existing zoning. A mixed-use, multistory building with residential uses would've been my ideal for the site, but I'm certainly willing to give this project a shot!

Here's a nice aerial pic showing Downtown Albuquerque with the RFP site at Lomas and Broadway on the bottom right corner. It was taken during a balloon ride and posted back in March by the Rainbow Ryders pilot on his Facebook account.

https://www.facebook.com/photo.php?fbid=26702197926044294&set=pb.100000423456416.-2207520000

nxdJ2wB.jpg
 
I thought it would be interesting to compare the office building across Lomas from the RFP site to gauge what we might see in the proposal by Noblespace. The existing building is 5 stories with a little over 81,000 sq ft of space. It sits on a little over 2 acres of land (2.10 ac), which is similar enough to the RFP site (2.77 ac). It also has a total of 78 surface parking spaces on its property.

https://www.loopnet.com/Listing/707-Broadway-Blvd-NE-Albuquerque-NM/4150152/

https://www.loopnet.com/property/707-broadway-blvd-ne-albuquerque-nm-87102/35001-101405839608541111/

image.jpg


map.jpg


Given this information, I'm sticking with my estimate of 2-3 stories for the buildings of the Noblespace proposal. The slightly larger plot would allow for extra parking spaces for the approximately 9,000 sq ft of additional space in the Noblespace proposal and their figure of about 100 jobs being located in the buildings.

I of course assume that they will have surface parking for their project. I really don't think that they will build structured parking.

I think the best layout we can hope for is the buildings placed fronting directly along both Lomas and Broadway, with perhaps a small plaza right on the corner between them. The cafe would optimally have a street-facing entrance on the ground floor of one of the structures, and perhaps also face the plaza with outdoor seating, etc. The surface parking would then be located behind each building on the interior of the property and accessed from Commercial Street on the west side.

Below is a very crude visualization of what I'm talking about and what I envision as a good layout for the project. Forgive me for not having the tools and ability to make a better rendering.

nIo65a1.jpg


Again, I look forward to seeing the actual layouts and renderings for this project!
 
Here are some pics of the new 516 Arts space on 1st Street in Downtown Albuquerque. They were posted by the architects on Facebook, the 516 Arts website and on an event platform advertising the opening exhibition and benefit night, which will be taking place in November.

https://www.eventbrite.com/e/516-arts-opening-night-a-celebration-benefit-tickets-1996313167423

nToLOAJ.jpg


https://www.facebook.com/FORMATIVEa...dBAmfyCN9T699PBqUAiHd9ykADzreKb3S1mjSZv7igGrl

nToLj8g.jpg


nToLN9a.jpg


nToLhcF.jpg


nToL8np.jpg


nToLSMN.jpg


nToLUPI.jpg


https://516arts.org/november-13-516-arts-opening-night-a-celebration-benefit/

nTz5YaR.jpg


The new 516 Arts space also took part in this month's Art Walk and hosted an event in front of their new venue.

https://www.facebook.com/BillyandBe...jj2ytiEd5Vq1hTAZDiYzgUYYv8U4YYQKBYbtb8QWMv5nl

nTQZKS1.jpg
 
Albuquerque Business First has a story about the Noblespace project at Lomas and Broadway.They say it's a $45 million project overall and give an expected completion date of early 2029 if everything goes well. The story includes three renderings of what they are proposing. Mark Baker's firm is designing the project. It looks very awesome and has exceeded my expectations for what I thought we would see for this proposal. I'm quite excited now for this project to come to fruition!

https://www.bizjournals.com/albuque...bespace-downtown-albuquerque-science-hub.html

A Los Angeles developer is eyeing a vacant Downtown Albuquerque property for a $45 million project featuring two three-story buildings designed to attract and retain science companies in New Mexico.

Noblespace is proposing to develop flexible office and laboratory space on a vacant lot northwest of Broadway and Lomas boulevards that would be leased to science and technology companies, founder and CEO Howard Kozloff said.

“You need the physical facilities for those companies if they’re going to stay,” Kozloff said. “The reason we like this site specifically is that it turns what is now a dead corner into Downtown’s front door.”

Kozloff said the proposed mixed-use development could transform the lot, which has sat vacant for decades, into a more productive property. The site is visible to motorists entering Downtown from Interstate 25.

Noblespace builds, acquires and remodels properties to lease to early-stage science and technology companies. Although the proposed project could house multiple businesses, no tenants have been secured because the science hub is still in its early stages.

In Downtown Albuquerque, Noblespace is the real estate partner for Roadrunner Venture Studios’ roughly 100,000-square-foot Roadrunner Quantum Lab at 523 Commercial St. NE, where the state’s first quantum network was launched, according to previous Business First reporting.

The company is also the designated ground lessee for Innovate ABQ, a 7-acre Downtown innovation site at 101 Broadway Blvd. NE developed through a public-private partnership involving the University of New Mexico, the city of Albuquerque and the business community.

Baker A+D is the architect for the proposed project at Broadway and Lomas boulevards.

Agora Partners, Noblespace’s sister company, is focused on programming and activating public spaces.

About two-thirds of the proposed site would consist of a publicly accessible plaza, courtyard, garden and landscaped areas. Plans also include a cafe with outdoor seating and space for small events.

The project is estimated to create about 100 permanent jobs. However, Kozloff said the final number would depend on the buildings’ uses and the number of employees working for each company.

Albuquerque’s Environmental Planning Commission unanimously approved a zoning change Aug. 20 for the approximately 3-acre vacant lot at 229 Lomas Blvd. NE, from light manufacturing to mixed-use zoning to support future development at the site.

The proposed footprint, density, height and parking comply with the property’s existing zoning, so Noblespace would not request any zoning changes, according to Kozloff.

Kozloff said Noblespace has not been officially selected or awarded the project, and the company has only been notified that its response to the city’s request for proposals satisfied the requirements.

Noblespace estimates the project will cost $45 million, although several factors, such as changes to building size, could affect that figure.

City officials expect the selection process and negotiations with the chosen developer to continue through approximately June 2027. During that period, Noblespace would complete the approval, architectural and engineering work if selected to acquire the land.

If the deal moves forward, the company hopes to break ground shortly after receiving the necessary approvals. Construction is expected to take 15 to 18 months, with completion targeted for the first quarter of 2029.

Terry Brunner, director of the city of Albuquerque’s Metropolitan Redevelopment Agency, said at a Sept. 17 Albuquerque Development Commission meeting that Noblespace was the only respondent.

He added that the proposal has been submitted to the Albuquerque Metropolitan Arroyo Flood Control Authority, which co-owns the property with the city, for approval of the sale.

“They will hear that at the end of October,” Brunner said. “As soon as we get permission to move forward, I think we’ll be in a better position to negotiate a sale and development agreement.”

nu7yHn1.jpg


nu7pyZP.jpg


nu7yJMF.jpg
 
Downtown Albuquerque News had a pic last week showing new fencing that has went up on Central Avenue east of the railroad tracks. They quote the city as saying that work on the other half of the Central Crossing project will begin before the end of the month.

https://downtownalbuquerquenews.com/

City expects work on Central Crossing to resume soon

New construction fencing went up recently on Central east of the train trestle. Metropolitan Redevelopment Agency Director Terry Brunner said a demolition phase and other prep work for the ramp that will lead up to the tracks should begin later this month.

nu76Ntf.jpg


d03b2dc8-6cbd-4f6a-a34d-e16687748325.png
 


Back
Top