The city broke ground yesterday on the Sawmill section of the Rail Trail. They did so by driving ceremonial golden spikes into a railroad tie. The streetscape improvement project on Bellamah Avenue was also kicked off as part of the ceremony. The new estimated cost for the entire Rail Trail project is $90 million, which the city says they have exactly half of that amount on hand. This portion of the project from Mountain Road to 12th Street will cost $3 million and is expected to be completed next year.
https://www.bizjournals.com/albuque...ill-brunner-rail-trail-mountain-bellamah.html
A new website for the Rail Trail was also introduced. They say it will allow you to track the progress of the project. Below is the link to the website along with nice renderings of the Rail Trail that are posted in the site's gallery. I again hope these are the actual plans for what's going to be built that are depicted in the renderings, because I love what's shown!
https://abqrailtrail.org/
I tried to arrange the renderings in a linear fashion following the trail as it goes from the Sawmill Area and Old Town towards Downtown Albuquerque. The first rendering depicts what they are calling the Roadrunner Pavilion, which looks like it's set in a park/greenspace just northwest of the Sawmill Crossing development/subdivision.
This is the structure that I love so much and which I think is supposed to look like the legs of a Roadrunner moving quickly in a circle, sort of like on the New Mexico Lottery's logo.
The third rendering looks like it's the portion of the trail as it nears Mountain Road, with Tiguex Park in the distance. Again, with some awesome structures surrounding it.
As you get towards the other end there are two renderings that seem to depict the area next to the convention center and the Marquette at-grade crossing, with the overpass visible as well. This area looks like it will have a neat art piece depicting a giant goathead sticker, which I love and which goes well with the neon tumbleweed at the Central Crossing.
I just love all of this, I really hope it comes out this well and as depicted. This really shows what our city is capable of when we allow ourselves to do big and great things!
https://www.bizjournals.com/albuque...ill-brunner-rail-trail-mountain-bellamah.html
On Aug. 29, a groundbreaking ceremony in the Albuquerque Sawmill District marked the start of the next phase of the city's Rail Trail project, moving closer to the goal of creating a 7-mile loop that will connect Downtown Albuquerque to various local attractions.
This phase focuses on linking Mountain Road to Bellamah Avenue and includes a complete streetscape redevelopment of Bellamah Avenue, with new trees, sidewalks and improved traffic flow, said Terry Brunner, director of the City of Albuquerque’s Metropolitan Redevelopment Agency (MRA).
The $3 million project is being constructed by Jaynes Corp., Wilson & Co., Toole Design and Antoine Predock Architect PC. The development, funded by the MRA, is expected to be completed by next summer, Brunner said.
On May 22, the City of Albuquerque began construction on the first phase of the project at Central Crossing, located at First Street and Central Avenue. Currently, officials are demolishing the Southwest ramp in front of Alvarado Station at 100 First St. SW., with plans to eventually construct a safe and accessible crossing over the railway. This phase is expected to be completed by summer 2025 as well, Brunner said.
The entire Rail Trail project, estimated at $90 million, will be carried out in about eight phases. To date, the project has secured approximately $45 million in funding, Brunner said.
Following the Sawmill phase, Brunner hopes to continue construction toward 12th Street and into Old Town.
"We're looking forward to this being the first real showcase of the linear part of the trail," Brunner said. "It will be a catalyst to get the entire community to want to invest further in this trail."
Due to the overall project's funding coming from multiple sources — not solely MRA — the City is required to issue bidding requests for each segment. Jaynes Corp. received initial approval to construct the first couple phases of the project 13 months ago, Stetson Chandler, project engineer at Jaynes Corp., said.
To facilitate the Sawmill phase, the City of Albuquerque purchased approximately 3 acres of land from the Explora Science Center and Children's Museum of Albuquerque in July. The total purchase price was $300,000, Brunner said.
"We really needed this section of old rail lines from Mountain [Road] to Bellamah [Avenue]," Brunner said.
The Albuquerque Rail Trail is expected to unlock approximately $590 million in redevelopment initiatives, a figure that may fluctuate slightly by the project’s completion in 2027. Once finished, the trail will create a 7-mile loop connecting Downtown Albuquerque to attractions such as Old Town, the Rail Yards, Sawmill District, Indian Pueblo Cultural Center (IPCC) and the Albuquerque Convention Center.
The MRA currently has redevelopment plans for Barelas, Downtown, Wells Park and Sawmill.
“The idea is when this is done, that you're actually going to have some feel for what the whole Rail Trail will be about," Albuquerque Mayor Tim Keller said during the groundbreaking ceremony. "This is also going to be a wonderful demonstration of what the power of these trails has to bring us together."
A new website for the Rail Trail was also introduced. They say it will allow you to track the progress of the project. Below is the link to the website along with nice renderings of the Rail Trail that are posted in the site's gallery. I again hope these are the actual plans for what's going to be built that are depicted in the renderings, because I love what's shown!
https://abqrailtrail.org/
I tried to arrange the renderings in a linear fashion following the trail as it goes from the Sawmill Area and Old Town towards Downtown Albuquerque. The first rendering depicts what they are calling the Roadrunner Pavilion, which looks like it's set in a park/greenspace just northwest of the Sawmill Crossing development/subdivision.
This is the structure that I love so much and which I think is supposed to look like the legs of a Roadrunner moving quickly in a circle, sort of like on the New Mexico Lottery's logo.
The third rendering looks like it's the portion of the trail as it nears Mountain Road, with Tiguex Park in the distance. Again, with some awesome structures surrounding it.
As you get towards the other end there are two renderings that seem to depict the area next to the convention center and the Marquette at-grade crossing, with the overpass visible as well. This area looks like it will have a neat art piece depicting a giant goathead sticker, which I love and which goes well with the neon tumbleweed at the Central Crossing.
I just love all of this, I really hope it comes out this well and as depicted. This really shows what our city is capable of when we allow ourselves to do big and great things!