One of the overpasses will be rebuilt way to the east of the current structure. Usually replacements are made right next to the existing bridges.
8 lanes for the 401??
Also noticed today that they have rebar forms up for at least 2 centre pillars at Highbury on the west side of the current bridge. I suspect this will be a case of building a partial bridge on the west side, shift traffic, demolish and rebuild the rest of the new bridge in the existing alignment.
I don't think anything is going on at Colonel Talbot yet but I haven't been down that way in quite a while.
About a month ago I drove through there and there was some work happening - construction signage was up, tree clearing was happening, and there was equipment doing some minor grading work east of the Glanworth Drive overpass.
Does anyone know what the finished project will look like on the 401 between Highbury and Wellington? It seems that they will be adding lanes either to the main traffic flow or more lanes to exit onto Wellington? It's hard to tell what they are doing.