Djeffery
Active member
so we're finally getting rid of the a-b exits... thank fuck
Yep, new efficient traffic lights at either side of the bridge lol. Seems to be the interchange standard now
so we're finally getting rid of the a-b exits... thank fuck
Yep, new efficient traffic lights at either side of the bridge lol. Seems to be the interchange standard now
http://sire.london.ca/advisory/cache/2/srqccf454p4rns55cuep5r55/3287030225201804531729.PDF
Regarding the 401/Colonel Talbot interchange
This is happening all over the country. The low traffic volumes due to COVID combined with being summer has created a rare opportunity of time to re/build needed critical infrastructure with far less disruption than what would normally be the case.
Not strictly interchange-related but there could be a new design when the new bridge gets built perhaps?
I don't have any details but I could see the interchange design getting changed to a folded diamond here vs the current diamond interchange.
Moving the ramps to the eastern side of the overpass with loops would increase the distance to the VMP interchange. These two junctions are pretty close together- it's best to space them out some more to minimize any weaving.
And if any widening comes later on the 401, you could build a continuous auxiliary lane between VMP and Westchester Bourne to aid in the traffic movements here.
Although there are some underpasses that need expansion done too. You don't really notice those as much while driving.