1 ( downtown )


moosanova

New member
Anyone know whent his project is slated to begin... i am seriously looking forward to this project go up....... along with the addition of 1521 just around the corner.... this i hope will seriously revitalize and clean up that part of town......

I know you folks know what i mean by that area....... 2nd ave between pike and pine...... Plus it's a bad ass design.....
 
The new planned start date is now Spring 2007. For a project that already has over half of its units reserved and a hotel operator already signed, it is astonishing that they still haven't been able to break ground.
 
The work on the garage renovation has been progressing for months now. Not sure if that includes some prep work for the Hotel 1 portion.
 
But it takes additional days to reach full strength.

Not according to Walsh Construction; they gave me a figure of 2-3 days for 80% maximum strength after a pour before they posttension their slabs.

This is why they can do a floor every 10 days on most highrise residential; most of the time is spent building the shoring.
 
Not according to Walsh Construction; they gave me a figure of 2-3 days for 80% maximum strength after a pour before they posttension their slabs.

This is why they can do a floor every 10 days on most highrise residential; most of the time is spent building the shoring.

That's all correct, except I was talking about "full strength".

Does Walsh do high-rises? Around here they're known as 2+5 guys, i.e. two levels of concrete topped by five woodframe. For highrises you'd hire someone like us instead.
 
True, although they are doing The Strand condo blocks (11-13 story, post-tensioned slab construction) down in Riverplace by the Marquam Bridge in Portland.
 
I love it because it turns a terrible "black hole" location into something that energizes its neighborhood.
 
And hopefully clears out or at least runs away the current clientel that frequents that area..... if ya know what i mean????
 

Really? This project has been discussed on this forum for years, I would think that a regular on this forum would be familiar with it by now...

Anyways, this is going to be a great project whenever it does get completed. I'm very curious about what retail tenants they're going to sign, for a project like this I'm expecting some very upscale names.
 
Really? This project has been discussed on this forum for years, I would think that a regular on this forum would be familiar with it by now...

Anyways, this is going to be a great project whenever it does get completed. I'm very curious about what retail tenants they're going to sign, for a project like this I'm expecting some very upscale names.

Well, I also thought you were a bus driving Nazi... sooo :frog:

I actually just wasn't familiar with the building being called 1 instead of 2nd & Pine.
 


Back
Top