montreal

  1. D

    MONTREAL | Le Montfort | 29 + 36 Floors | 97 & 120 metres

    Forgot to post this one as well, it has been on the developers site since last year. parking lot has been closed, but nothing imminent just yet. Project includes two towers with rentals (unsure about number of units) commercial, restaurant and office space. This area will have further...
  2. D

    MONTREAL | UTILE Le Cardinal | 11,18 Floors

    Another student housing project in Downtown Montreal, 288 total units, UTILE is the developer, same as another project going on in Downtown. Construction has commenced, will eventually move to U/C once crane on site. https://www.utile.org/nouvelles/annonce-du-projet-le-cardinal
  3. D

    MONTREAL | UTILE Saint-Laurent | 42 M | 13-Floors

    Student housing project in Downtown Montreal, 168 units for students (up to 281 residences). Demolition of the once Katacombs bar should start this year. https://www.utile.org/en/projects/meridien
  4. D

    MONTREAL | Esplanade Cartier Phase 3 | 21 FLOORS

    Developer launched construction of Phase 3B, putting it here for now until it inevitably gets moved to U/C section. - 206 units NEW RENTAL UNITS IN MONTREAL: PRÉVEL LAUNCHES LOT 3 OF THE ESPLANADE CARTIER PROJECT...
  5. D

    MONTREAL | DOMUS | 23 Floors- 80 Metres/262 FT

    First announced project from the ongoing Bonaventure redevelopment plan in Downtown Montreal. Heights need to be bumped up in this area, developers are asking for a range of 80-120m.
  6. D

    MONTREAL | Place Versailles Redevelopment | 2-25 Floors (up to 115 metres)

    Major redevelopment project in the East End, where the current Place Versailles mall currently stands. Specs: - 5,000 units, multiple buildings from 2-25 floors, tallest can possibly be 115 metres - Hotel with 240 rooms - School - 260,000 sq ft of commercial space - 107.6K sq ft of office...
  7. D

    MONTREAL | 900 St.Antoine Ouest | Broccolini Project | 200M/656FT- 64 Floors

    Phase 1 of Broccolini's new project, no renders as of yet Specs: -200M tall - 664 Units + commercial spaces Article: (French Only) https://www.lapresse.ca/actualites/grand-montreal/2024-03-25/premier-feu-vert-pour-un-nouveau-gratte-ciel-de-200-metres.php
  8. D

    Montreal | Cité de l’île Project | 10-26 floors

    Beautiful proposal for Nuns Island in Montreal. Sources: https://forum.agoramtl.com/t/cite-de-lile-projet-global/4364/13 https://portail-m4s.s3.montreal.ca/pdf/2022-12-14_ca22_210305.pdf
  9. D

    MONTREAL | Le Livmore II | 156M/512FT | 46-Floors

    Phase 2 of the very successful Le Livmore project is anticipated to start either Q1-Q2 next year. Phase 1 is complete, 50% leased already, with a global clientele too. Phase 2 https://renx.ca/gwlra-find-success-upscale-livmore-multires-banner
  10. D

    MONTREAL | 1050 Rue de la Montagne | 128M/420 FT | 37 FLOORS

    Tower just got approved after the city voted against it a few months back. 38 floors with 256 units in the already ultra-dense Bell Centre cluster in downtown Montreal. Render is old, no idea if it has changed, but I know the city has told the developer to change it up and approved it with a...
  11. D

    MONTREAL | Quinzecent | 120M/394FT | 37 FLOORS

    Another project currently U/C in the Bell Centre cluster is Quinzecent, a 120 metre tower consisting of 428 condos and 50,000 sq ft of commercial space. No retailers have been announced as of yet though. Glass tower to the right, this image showcases the density that has been added to this...
  12. D

    MONTREAL | Solstice | 147M/482FT | 44 FLOORS

    Nearing completion but no thread, Solstice is built next to the hyper dense area of the Bell Centre cluster of downtown Montreal. This area's population grew by nearly 400% between 2016-2021 and other projects will continue adding to the increasing population. Solstice will have 330 units over...
  13. D

    MONTREAL | Esplanade Cartier | Multiphased Project | 7-25 Floors |

    A significant multiphase project currently U/C in downtown Montreal. The project totals 400,000 sq ft and consists of 2,000 units (condos, rentals, social housing) 600,000 sq ft of office space and 100,000 sq ft of commercial space. Phase 1 is close to completion (7 floors, 14 floors) and has...
  14. D

    MONTREAL | Condos Mansfield | 65M/213F | 19 FLOORS

    Another Brivia building going up in downtown Montreal, 226 units over 19 floors. The building will be loaded with amenities and I believe there are plans for commercial or a restaurant at the ground level. https://mansfieldcondos.com/en/project/ Source...
  15. D

    MONTREAL | Stirlyng | 85 M / 277 FT | 22 FLOORS | ON HOLD

    New 22 floor high-rise U/C in downtown Montreal. Total of 160 units, expected delivery end of 2023. Photos above are preliminary, will update when new ones are shared...
  16. D

    Montreal | Bonaventure Bridge Redevelopment Project | 7,500 units.

    Finally, a big and bold proposal/vision for this downtown area. Of course, anything can change between now and once it is approved. Hopefully the city on Montreal does not turn it into a 3,500 unit, 10-floor, majority social housing project ghetto. **MTL peeps, feel free to add anything I...
  17. Martin Mtl

    MONTREAL | 1124 De Bleury | 45 meters | 15 floors

    Credit photo: Yabucoa77 at agoramtl.com
  18. Martin Mtl

    MONTREAL | Savonnerie Barsalou | 91 meters | 30 floors

  19. Martin Mtl

    MONTREAL | 2055 Drummond | 120 meters | 38 floors

  20. Martin Mtl

    MONTREAL | 180 René-Lévesque Est | 65 meters | 21 FLOORS

    Credit photo: Dom723 at agoramtl.com
  21. Martin Mtl

    MONTREAL | Gare Viger | 20 FLOORS

    Credit photo: Dom723 at agoramtl.com
  22. Martin Mtl

    MONTREAL | Coopérative de la Montagne Verte | 45 meters | 14 FLOORS

    Credit photo: Yabucoa77 at agoramtl.com
  23. Martin Mtl

    MONTREAL | 2190 Sainte-Catherine O. | 13 FLOORS

    Credit photo: windez at agoramtl.com
  24. Martin Mtl

    MONTREAL | Sonder Maisonneauve | 20 FLOORS

    Credit photo: hermes at agoramtl.com
  25. Martin Mtl

    MONTREAL | Le Cent Onze | 12 floors

    Credit photo: Rosefellow
  26. Martin Mtl

    MONTREAL | Symphonia SOL | 45 M | 12 FLOORS

    Credit photo: Yabucoa77 at agoramtl.com
  27. Martin Mtl

    MONTREAL | Le Vittorio | 60 m | 20 floors

    Credit photo: Yabucoa77@ agoramtlcom
  28. Martin Mtl

    Montreal | Le Mildoré | 18 floors

    CREDIT PHOTO: YABUCOA77 AT agoramtl.com
  29. Martin Mtl

    MONTREAL | Hotel Honeyrose | 116.5 M / 382 FT | 35 floors

    Credit photo: Yabucoa77 at agoramtl.com
  30. Martin Mtl

    MONTREAL | KAI | 60 m | 22 floors

    Credit photo: Yabucoa77 at agoramtl.com
  31. Martin Mtl

    MONTREAL | Griffin Square (250 Peel) | 60 M | 16, 19 FLOORS

    Credit photo: Yabucoa77 at agoramtl.com
  32. Martin Mtl

    MONTREAL | 455 René-Lévesque Ouest - Tour NORD | 120 M | 35 FLOORS

    Credit photo: Mondo_Grosso agoramtl.com
  33. Martin Mtl

    MONTREAL | 455 René-Lévesque Ouest - Tour sud | 156 M | 45 FLOORS

    Credit photo: Mondo_Grosso agoramtl.com
  34. Martin Mtl

    MONTREAL | 900 St-Jacques | 200 M | 62 FLOORS

    Credit photo: SkahHigh on Agoramonreal.com
  35. MTLskyline

    MONTREAL | Central Station Redevelopment | 33, 38, 50 FLOORS

    Interesting proposal by Cominar for 1800 residential units above Central Station in Montreal: https://www.journaldemontreal.com/2019/10/04/10000-residences-pres-de-sites-commerciaux
  36. MTLskyline

    MONTREAL | Zenith | 20 FLOORS

    MONTREAL | Zenith | 20 FLOORS 1565 Rue Saint-Hubert, Montréal, QC 135 Units 20 Stories Architect: Geiger Huot Architectes Developer: Mondev Est. Compl. Oct 2019 http://www.geigerhuot.com/en/projects/st-hubert/ https://www.buzzbuzzhome.com/ca/zenith#image-All-2
  37. D

    MONTREAL | 1 Square Phillips | 203 M / 664 FT | 61, 20, 14 FLOORS

    No renders yet, but according to a city document, the project will have 61,20 & 14 floors, 1,150 units and a hotel. :cheers:
  38. D

    MONTREAL | Dorchester Apartments | 120 M / 394 FT | 35 FLOORS

    Another 120m tower going up on Rene Levesque Boulevard in downtown Montreal! groundbreaking starts in March as well. No idea on how many apartments the tower will have, but it'll be good for the sector since you have Guy Concordia nearby and a few colleges as well. ...
  39. MTLskyline

    MONTREAL | MAA Condominiums (2070 Peel) | 120 M / 394 FT | 33 FLOORS

    MONTREAL | MAA site (future condo project) | 33 FLOORS Location: https://goo.gl/maps/fzndym49GaM2 (2070 Peel, MAA Building) https://devimco.com/en/project/maa-project/ https://www.devimcomaa.com/en/
  40. D

    MONTREAL | Hampton Inn & Homewood Suites by Hilton | 13 FLOORS

    New hotels/condos going up in downtown Montreal's Chinatown. It may not be the best design but new hotels + condos replacing a parking lot and adding more life and people in this part of downtown is great news! :cheers: Digging so far Source...
  41. D

    MONTREAL | Quartier Des Lumieres Phase I | M | 13 FLOORS

    This project was announced a few months back, but it is to develop the lot of the old CBC tower in the Eastern part of downtown Montreal. The whole development is 4.5 million square ft including: 3,000 units, 24-floor hotel in the old CBC building, offices, a school, entertainment, retail, and...
  42. D

    MONTREAL | Enticy | 23 FLOORS

    New condo project on the ever-evolving Rene Levesque Boulevard. The project was announced earlier but new renders have come out in the past day. https://www.enticycondos.com/ Edit: Can mods please change it to Enticy please.
  43. D

    MONTREAL | 1201-1215 Phillips Square | M / FT | ? FL

    I'm just making a thread about this project. We should be hearing about it later this month though. Past project As some people on here know, this land was to be used for a 40-floor office tower a couple of years ago by Canderel. Source...