Winnipeg | Downtown | The Forks Market | Railside at The Forks


Cyro

New member
Winnipeg | Forks Redevelopment - Parcel 4 - Rail Side Initiative | Preliminary Proposals

Mixed-use redevelopment preliminary proposals. Located at the junctions of the Red and Assiniboine Rivers in downtown Winnipeg, Manitoba.
Initiative includes recreational, historical and cultural, residential, and institutional and supportive commercial uses.

Proposals Include:

- Public Spaces - Parks, Plazas, and Promenades
- Mixed-Use Development Parcels
- Community-Cultural Land Bank
- District Eco-Targets

PrelimConcepts_2.jpg

PrelimConcepts_3.jpg

PrelimConcepts_4.jpg

PrelimConcepts_1.jpg

Images

Preliminary Revitalization Concepts

More info at : http://www.theforks.com/

Nov.2015
Revised concepts for Initiative(PDF)
http://s3.documentcloud.org/documents/2298490/forks-railside-open-house-boards-final-package.pdf

Proposals 2025:

Railside Residential Village at The Forks
Developer: The Forks North Portage Partnership
Status: Development Permit
Documents: PDF Storyboard
Media: Housing development at The Forks to break ground–CBC News Manitoba YouTube
Project Thread: Forks Redevelopment
Description: Railside at The Forks represents a transformative milestone in the evolution of Winnipeg's iconic meeting place, introducing the site's first-ever residential component by redeveloping two former surface parking lots—known as Railside and Parcel 4—into a vibrant mixed-use neighbourhood. Faithful to The Forks' founding vision as an all-season cultural and recreational hub, this significant project enhances the area's rich heritage with expanded commercial, retail, and high-quality public spaces, ultimately accommodating up to 2,500 residents in approximately 1,200 rental and condominium homes of varying sizes. Phase 1 features 10 distinct mid-rise buildings (typically 4-6 storeys) developed by a consortium selected through a competitive RFP process, with an emphasis on equitable, innovative, and diverse architectural designs to create a dynamic urban village. The layout is thoughtfully organized around a network of interconnected public open spaces that function as the development's "town squares"—primarily two central courtyards/plazas in Phase 1, linked by short pedestrian-priority streets, shared alleys, pathways, and additional green areas spanning over 3.5 acres of publicly accessible space. These plazas and courtyards serve as the heart of the neighbourhood, framed by the surrounding buildings to encourage gathering, with features like vivid lighting, outdoor seating, greenery, public art installations, café-style areas, and seasonal activation to foster connection, exploration, and year-round community life. Buildings are oriented to define and enclose these "outdoor rooms," activating ground floors with local shops, dining, cafés, services, arts, culture, and community spaces that prioritize pedestrians and cyclists while minimizing vehicle impact (kept to the perimeter). This creates a compact, walkable village atmosphere that seamlessly extends The Forks' existing attractions—such as the Market, recreational venues, and proximity to the Canadian Museum for Human Rights—connecting to downtown Winnipeg via Israel Asper Way and beyond, all while preserving sky views, reducing wind, and emphasizing sustainable, people-first design. The interconnected public realm, including these town-square-like courtyards and alleys, weaves the development into a cohesive, inviting extension of The Forks rather than isolated structures, ensuring public spaces remain the vibrant focal points for residents and visitors alike.

Permits: #24-138052 DP-2024-09-06, Permit. Development Permit Application for the first phase of the Railside South Development at The Forks'. Work includes re-alignment of the private approach, paving for parking, drive aisles, pedestrian connections, landscaping, installation of garbage enclosures and CSTE transformers, as well as the addition of six (6) fire hydrants to the site.
H3LZWDR.jpg

KN6ON1P.jpg


54985791739_f822c84131_c.jpg


54985830300_212d6bffc7_c.jpg


55048808388_fd1887f644_c.jpg


54985718708_de96614e03_c.jpg


54985781509_004b6c78d5_c.jpg


54985545661_3829911c90_c.jpg


54985718723_1aa9964a40_c.jpg


54985830310_7ea6c5da4d_c.jpg


  • Railside | Kink | Site 16
Location: Israel Asper Way
Developer: GSD
Architect: ATLRG Architecture
Status: Proposed
Documents:
Project Thread: Forks Redevelopment
Renderings
Description: Ground floor commercial with 29 deeply affordable apartment units within the 6 storey mass timber building. The kinked form is located at the nearest point to the market proper, with a carved-out plaza serving as a gateway to the residential component of the historic site.
54457125449_633f7f21d1_c.jpg


54457194173_7cf290a158_c.jpg


54456094607_5ea97102d6_c.jpg


54457124584_7ec27818c5_c.jpg


54456094592_f23070876c_c.jpg


  • Railside | Pilot & Porter Condominiums | Site 15
Location: 32 Israel Asper Way
Developer: StreetSide
Architect: Prairie Architects
Status: Proposed
Documents: VARIANCE: 25-121080/B-April 24, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application to build mixed-use building with two ground floor storefronts and 45 apartments on the floors above.
Permits:
54788366728_c256f5cbe0_c.jpg


55570813815_021be498c0_c.jpg


55570813820_678b53a512_c.jpg


  • Railside | Slip | Site 14
Location: Israel Asper Way
Developer: Vishin Developments/Trademark Homes
Architect: ATLRG Architecture
Status: Proposed
Documents:
Project Thread: Forks Redevelopment
Description: The Slip is a thoughtfully designed 4-storey mixed-use residential apartment building within the Railside at The Forks development in Winnipeg. It features up to five micro-commercial units at ground level to support small businesses and activate the streetscape, while the three upper storeys house 18 compact micro-residential rental units. Complementing these are amenities such as a public washroom on the ground floor, dedicated exterior tenant planter boxes for greenery, a rooftop deck for communal outdoor space, and an innovative rooftop urban apiary to promote local pollinators and sustainability. The building's dynamic, shifting form—with strategic overhangs and balconies—responds sensitively to its 360-degree surroundings, including adjacent plazas, public streets, and pedestrian alleys, thereby establishing a distinctive and engaging edge for the broader Railside neighbourhood.

55045821242_be6cbb3ff1_c.jpg


55046901198_81b292bc11_c.jpg


55047054670_9bc4fb9bde_c.jpg


  • Railside | Site 13
Location: 44 Israel Asper Way
Developer: Alston Properties
Architect: 1X1 Architecture
Status: Development Permit
Documents: VARIANCE: 24-191468/B-September 13, 2024
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a 6 storey mixed-use housing development (1 CRU & 35 Units)
Permits: #24-176694 DP-2024-11-12, Permit. Development Permit Application for a proposed 31,970 sq. ft. six-storey mixed-use building with a 3,108 sq. ft. commercial retail unit on the main floor and 35 multi-family residential units occupying the second through sixth floors.
54455670152_b95cee24da_c.jpg


54456765668_16fc177f7f_c.jpg


54456871165_18d34deb9a_c.jpg


53601766562_045ae1e79f_c.jpg



  • Railside | Site 12
Location: 50 Israel Asper Way
Developer:
Architect: 2 Architecture
Status: Proposed
Documents: VARIANCE: 24-271940/B-April 4, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application to build a six storey mixed-use building with seven (7) ground floor commercial units and 40 residential units on the floor above.
Permits:
54452567816_7c0c17ebf7_c.jpg


55046894409_88b4b8dce7_c.jpg


55046817363_319c93e102_c.jpg


55046969290_425f630582_c.jpg


54985665414_75210b073d_c.jpg


54985603418_226ea89c26_c.jpg


54984535917_9885a4fb10_c.jpg


54985665409_8ea6ec25bd_c.jpg


  • Railside | Site 11
Location: 64 Israel Asper Way
Developer: Alston Properties
Architect: 1X1 Architecture
Status: Development Permit
Documents: VARIANCE: 24-191465/B-September 13, 2024
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a 6 storey mixed-use housing development (1 CRU & 23 Units)
Permits: #24-176631 DP-2024-11-12, Permit. Development Permit Application for a proposed 24,000 sq. ft. six-storey mixed-use building with a 2,150 sq. ft. commercial retail unit on the main floor and 23 multi-family residential units occupying the second through sixth floors.
54454814910_4ca9069e90_c.jpg


54453608797_8253bf484c_c.jpg


54920250544_cf9c5d74e6_c.jpg


  • Railside | Building 5X | Site 10
Location: 68 Israel Asper Way
Developer:
Architect: 2 Architecture
Status: Proposed
Documents: VARIANCE: 24-271871/B-April 4, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved a Conditional Use under Downtown Zoning By-Law No. 100/2004 to permit a Restaurant use located at ground level and not directly accessible from a public sidewalk, 4 storey mixed-use building 1 ground floor commercial unit and 06 residential units on the floors above.
Permits:
54452803658_7a1bc2dd25_c.jpg


54920250549_ccc4836264_c.jpg


54452744919_1989fc00c7_c.jpg


54976261247_91543753a9_c.jpg


55046628511_ec550ce961_c.jpg


54951525210_260d797cdb_c.jpg


  • Railside | Parcel 9 | Site 09
Location: 72 Israel Asper Way
Developer: FNP
Architect: Number TEN Architectural Group
Status: Proposed
Documents: VARIANCE: 24-279590/B-April 17, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a six storey mixed-use building with four ground floor commercial units and 91 residential units on the floors above. Recipient of the Housing Accelerator Fund Capital Grant Incentive.
Permits:
54521161198_b31a600c0b_c.jpg


54521473192_eb2dc72745_c.jpg


54470285548_25f615056f_c.jpg


54470370720_fea38af2a1_c.jpg


54985661840_b6f6832d29_c.jpg


54984492672_5500a960b2_c.jpg


55530532744_f7713d99d9_c.jpg


55530382646_382e003b42_c.jpg


  • Railside | Building 5Y | Site 08
Location: 80 Israel Asper Way
Developer:
Architect: 2 Architecture
Status: Proposed
Documents: VARIANCE: 24-271356/B- April 4, 2025
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a four storey residential building with 16 units
Permits:
54452809623_7c9a4fbd68_c.jpg


54951410823_1741c5ef2e_c.jpg


55046628496_8d021e5309_c.jpg


55046817378_cee17e764a_c.jpg


  • Railside | Station X | Site 07
Location: Israel Asper Way
Developer: UWCRC 2.0
Architect: LM-ESP
Status: Proposed
Documents:
Project Thread: Forks Redevelopment
Renderings
Description: Station X is a 7-storey, 67,275-square-foot mixed-use, mixed-income residential project at Railside spearheaded by the University of Winnipeg Community Renewal Corporation. The building delivers 73 studio to three-bedroom units blending affordable and market-rate housing, while its ground floor hosts a 56-space YMCA-YWCA child care centre—Winnipeg’s largest operator—and flexible live/work studios for small retailers and makers. Designed within a compact urban block to buffer nearby rail noise, the structure opens onto three landscaped front courtyards and crowns with a partial seventh-floor amenity level featuring a fitness room, multi-purpose lounge, and expansive terrace overlooking the Canadian Museum for Human Rights, the historic Forks site. Emphasising sustainability, community integration, and urban vitality, Station X is slated for completion in 2027.
Permits:
54910402560_89ecc1b450_c.jpg


54910084401_7fe213fb91_c.jpg


54910084391_49c632d19b_c.jpg


54920303860_a3e04e10c0_c.jpg


55046645661_c1c8d41bb2_c.jpg


55046986390_8c2cf5cfaf_c.jpg


55046834018_cfa4ffdda9_c.jpg


  • BOXCAR ALLEY at Union Station
Location: Union Station/The Forks, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architect: PUBLIC CITY
Status: Proposed
Renderings
Description: As a part of the Railside Residential Village at The Forks development, The Box Car Alley design playfully highlights the space under the CN rail line at the Forks, a space that is currently under-utilized and overlooked. The project seeks to brighten the peripheries of The Forks, revitalizing an important public space through public engagement, local business promotion and creative opportunities for artists and visitors.
jO2ndr0.jpg


  • Railside | Art | The Candle
Location: Israel Asper Way
Developer: The Forks North Portage
Artist: Ian August
Status: Proposed
Project Thread: Forks Redevelopment
Media: The first public art piece unveiled for Railside at The Forks-The Forks Market
Description: Local Métis artist Ian August's whimsical sculpture titled The Candle has been selected as the first public art piece for the Railside at The Forks mixed-use development in Winnipeg. The artwork features an off-white candle form that bends and curves along the ground, emerging from a simple holder at one end and rising 12 feet high at the other, where a light mimics a flame, drawing inspiration from surrealist paintings and 1970s comic books. Positioned as a focal point in a public courtyard, The Candle will invite visitors to sit, rest, and socialize, symbolizing comfort, warmth, hospitality, home, and belonging while reflecting Railside's evolution into a residential community that fosters connection and welcome. August, who has personal ties to The Forks through past work and family memories, explains that the piece draws from universal symbols of opening one's home to create an accepting environment. The selection followed a 2023 request for qualifications from Manitoba-based artists, where 19 submissions were narrowed to four finalists, and August's conceptual proposal was chosen by a panel of experts. Funded by a $200,000 grant from The Winnipeg Foundation, The Candle will be installed upon completion of Railside's public courtyards and spaces, with construction on the broader development beginning in spring 2026.
55048852933_89fe73aea6_c.jpg


• Video Link


55446222324_9600f4b2ae_o.jpg


55446181728_c3c8fc5163_h.jpg
 
Last edited by a moderator:
Approximate Scale of Development in each Phase
Phase 1 – Rail Side
2 mixed use development parcels which will include:
•Approximately 20,000ft2 of retail / destination / office space
•100 housing units – parking included
400 Public Stall Parkade*
Public Spaces, Public Art and Green roofs

~~~~~~~~~~

Phase 2 – Parcel 4
3 mixed use development parcels each having :
•20,000ft2 of retail / destination / office space
•100 housing units – parking included
300 Public Stall Parkade*
Public Spaces, Public Art and Green roofs
*Additional parking for residential units, (500 units) would be built on a full cost recovery basis.

~~~~~~~~~~~~
REPORT OF THE STANDING POLICY COMMITTEE ON DOWNTOWN DEVELOPMENT, HERITAGE AND RIVERBANK MANAGEMENT

4. Proposed Parcel 4 - Forks Rail Side Development
+ Attachment

http://clkapps.winnipeg.ca/dmis/viewdoc.asp?docid=13745

==============

I'll try to add General Forks development information in this thread as well.
This project has a looooong way to go. Anyway, some info included above..:)
 
WATERPARK :titanic::notacrook::cheers::cheerleader:

Maybe with an all weather dome included for our sub arctic conditions...?

It could be covered with a green roof..;)


EDIT...and time to take this fine work of art down as well, yes I hear the name has changed and it's structurally wonderful...(the one on the left..I mean right..)

scotiabank-stage-1024x744.jpg

destinationsdetoursdreams.com
 
Maybe with an all weather dome included for our sub arctic conditions...?

It could be covered with a green roof..;)

The entire Forks should just be an underground mall with a big green roof, connected to Winnipeg Square. Now that would be golden. Think a teletubbies-inspired village.
 
It sounds like they're going to develop 5 more "plans" and do 1654684 more rounds of consultation. They've done tons already and the general response has been OMFG YES SOUNDS GREAT... time to get going already.
 
I really enjoyed your vision of what Parcel 4 + Rail Side may look like in the future..(added it here)...

dNKV0jG.jpg


With parcel 4 and true north square, the models are almost fantasy because i am being hyper-optimistic, but hey. These pics look like a skyline, and its Winnipeg! (wait, what?) :haha:
 
yep, very cool - plus will bring cohesion to that part of downtown, which oftentimes feels disconnected from downtown even though it is officially a part of the downtown area
 
At the last public consult they did the plan appears to have shifted from high rises to 5-7 story buildings, with retail on bottom and then residences above.
 
From what I understood, each building will be designed by a different firm, but will all follow similar guidelines, and will be built in phases. So the whole thing won't be built at once, rather in smaller chunks... I think the info is online somewhere, I'll try to find it...
 
Is this actually moving ahead with concrete plans? Or is it highly conceptual RFP type shit?

From what I've heard the plan is to subdivide the land with guidelines on what type of development/building can go at each spot, and they are hoping to have lots ready to go by spring. Railside will be happening before parcel 4 IIRC.
 


Back
Top