Here is the first picture of the Mobimo project near central station of Lausanne.
In 2012, renovation of large existing building (which dates from 1964).
From 2015, construction of part 2, probably a tower about 100m.
The tower will be built over the future Metro3 station.
•Former post office distribution centre with office building andcurrent interim use, area 40,000 m2
•Future use after urban development: commercial, shops, services, hotel, residential
•Investment approx. CHF175 to 225 m.
•Development period: approx. 5 years (design plan)
•Target segment: All possible types of use close to railway station in the town centre
•Location: Totally urban, central location right by Lausanne station
Actually:
SSC Thread