Hello,
the following projects are now U/C and some need modified titles to reflect their updated heights.
TORONTO | 75 Mutual Street | M / FT | 38 FLOORS is
under construction and should be modified to TORONTO | 75 Mutual Street | 113M / 374FT | 36 FLOORS
The thread:
https://skyscraperpage.com/forum/sho...d.php?t=213157
The 4th and 5th posts suggest construction (and well, its nearly completed)
TORONTO | 215-229 Church St. | M / FT | 46 FLOORS is also
under construction and should be modified to TORONTO | Social at Church | 165M / 541FT | 52 FLOORS
The thread:
https://skyscraperpage.com/forum/showthread.php?t=215866
The 5th post suggests construction.
TORONTO | 8 Cumberland St. | 193 M / 635 FT | 64 FL is also
under construction and should be modified to TORONTO | 8 Cumberland St. | 170 M / 557 FT | 51 FL
The thread:
https://skyscraperpage.com/forum/sho...d.php?t=215737
The 21st to 23rd posts suggest construction.
Thank you very much.