My records request came in for Adeline. Here's what we got going. There will be some additional parking on the ground level in 2 seperate spots:
Section 1 appears to be for passenger drop off area only and has 5 spots (4 standard and 1 handicap) for what is probably short term parking. This will have an entrance on the Jefferson side and an exit on the 3rd St. side. Section 2 will have 34 spaces (31 standard and 3 handicap). This area will have both entrance and exit on the 3rd St. side. I can only surmise this is some kind of valet parking area or it could also be for employee parking. Either way, this is all the parking that will be added to the development.
The 10 floor section behind the tower WILL be built, but it is a very small footprint that appears to be for the studio units. It will not front the 3rd St. side and is only about half the width of the main tower. Also, there will be large LED signs on both Jefferson and on 3rd similar to the Ryan in size.
Project details can be found on my Google Drive. There are other projects mixed in such as the Park and other previous projects, but most of it is Adeline.
https://drive.google.com/open?id=1H-...rOZ06r5YzrcLC_