Quote:
Originally Posted by Dmajackson View Post
NRTH Condos has cleaned up this site and is no longer using it as a laydown yard.

The Grade-Alteration Permit was approved for this last week.
If you have an approved development plan with appropriate grade drawings, why would you need to apply for a separate grade alteration permit? Is this a prime example of HRM Planning red tape?
Reply With Quote
     
     
  #62  
Old Posted Mar 25, 2024, 12:45 PM
IanWatson IanWatson is offline
Registered User
 
Join Date: Feb 2013
Posts: 1,227
Quote:
Originally Posted by Keith P. View Post
If you have an approved development plan with appropriate grade drawings, why would you need to apply for a separate grade alteration permit? Is this a prime example of HRM Planning red tape?
Often they're tied together as part of the full construction permitting package, but for big projects developers will apply for the grade alteration permit on its own so that they can start on excavation while they're getting full building permits etc.
Reply With Quote
     
     
  #63  
Old Posted Apr 13, 2024, 3:40 PM
Dmajackson's Avatar
Dmajackson Dmajackson is online now
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,355
Housing Accelerator Fund proposed changes for this site;

Quote:
• This property is consolidated with parcels on Gottingen Street that carry a COR Zone with a proposed height of 7 storeys, but the site currently has split zoning between the COR Zone and the ER-3 Zone.
• Staff recommend rezoning to COR to aid with the development of the site, and further recommend extending the COR Zone to the entirety of 5511 Bilby Street which is abutting the site and also currently has split zoning between ER-3 and COR.
Regional Centre Development Requests
Reply With Quote
     
     
  #64  
Old Posted Apr 14, 2024, 4:00 PM
Dmajackson's Avatar
Dmajackson Dmajackson is online now
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,355
Quote:
Originally Posted by Dmajackson View Post
Residential Building Permit - New Building - Application Incomplete - 5518 MACARA STREET, HALIFAX - $12'000'000 - Dwelling - Multiple Units - 60 Units - 7 Floors - new apartment building
Now issued with some changes

7 Floors | 72 Units | Mixed-Use | $12 M | 5510 Macara Street, Halifax | Unknown
Reply With Quote
     
     
  #65  
Old Posted Apr 16, 2024, 5:24 PM
OldDartmouthMark OldDartmouthMark is offline
Registered User
 
Join Date: May 2010
Posts: 8,482
A question for those in the know, to satisfy my own curiosity:

If zoning was changed to allow 15 or 20 floors, with increased FAR to allow up to 200 units, would that substantially delay construction?
Reply With Quote
     
     
  #66  
Old Posted Apr 17, 2024, 11:38 AM
IanWatson IanWatson is offline
Registered User
 
Join Date: Feb 2013
Posts: 1,227
Quote:
Originally Posted by OldDartmouthMark View Post
A question for those in the know, to satisfy my own curiosity:

If zoning was changed to allow 15 or 20 floors, with increased FAR to allow up to 200 units, would that substantially delay construction?
Likely. At a minimum you're looking at redoing all the structural designs. With that many extra units you're also probably needing major changes to elevators. I wouldn't be surprised if it essentially meant a full new building design.
Reply With Quote
     
     
  #67  
Old Posted Apr 17, 2024, 12:26 PM
OldDartmouthMark OldDartmouthMark is offline
Registered User
 
Join Date: May 2010
Posts: 8,482
Quote:
Originally Posted by IanWatson View Post
Likely. At a minimum you're looking at redoing all the structural designs. With that many extra units you're also probably needing major changes to elevators. I wouldn't be surprised if it essentially meant a full new building design.
Thanks! That info kind of reframes my expectations on building height increases for existing projects that haven't quite started yet.

Appreciate the info!
Reply With Quote
     
     
  #68  
Old Posted Apr 17, 2024, 1:53 PM
Jreeb Jreeb is offline
Registered User
 
Join Date: Sep 2018
Location: B3H, Halifax
Posts: 52
Quote:
Originally Posted by IanWatson View Post
Likely. At a minimum you're looking at redoing all the structural designs. With that many extra units you're also probably needing major changes to elevators. I wouldn't be surprised if it essentially meant a full new building design.
Especially if you are going from just a mid-rise 5-7 storey building to being able to build a podium + tower. From what I understand, the redesign would take a bit longer as it would have to incorporate the setbacks involved with the tower.

Hopefully, if something is already a podium + tower change like the 15 to 20 storeys, the redesign phase is much quicker and does not require a long approval process.
Reply With Quote
     
     
  #69  
Old Posted Apr 18, 2024, 7:57 PM
kijoma kijoma is offline
Registered User
 
Join Date: May 2023
Posts: 18
Quote:
Originally Posted by OldDartmouthMark View Post
A question for those in the know, to satisfy my own curiosity:

If zoning was changed to allow 15 or 20 floors, with increased FAR to allow up to 200 units, would that substantially delay construction?
They also probably wouldn't have the available funds to undertake a larger project or it would take time to organize that even if they could. Plus, the larger the construction, the longer it tends to take to complete it as well.
Reply With Quote
     
     
  #70  
Old Posted Apr 18, 2024, 9:32 PM
OldDartmouthMark OldDartmouthMark is offline
Registered User
 
Join Date: May 2010
Posts: 8,482
Quote:
Originally Posted by kijoma View Post
They also probably wouldn't have the available funds to undertake a larger project or it would take time to organize that even if they could. Plus, the larger the construction, the longer it tends to take to complete it as well.
Great point. I hadn't considered that, for some reason.
Reply With Quote
     
     
  #71  
Old Posted Apr 21, 2024, 9:19 PM
Dmajackson's Avatar
Dmajackson Dmajackson is online now
Moderator
 
Join Date: Feb 2008
Location: B3K Halifax, NS
Posts: 9,355
This is under construction now.


HalifaxDevelopments.ca (Photo by David Jackson)

Last edited by Dmajackson; Apr 22, 2024 at 1:10 PM.
Reply With Quote
     
     
  #72  
Old Posted Apr 22, 2024, 12:41 PM
eastcoastal eastcoastal is offline
Registered User
 
Join Date: Mar 2009
Posts: 1,242
Quote:
Originally Posted by Dmajackson View Post
LOL - the sidewalk on that block of Gottingen will have been closed for a loooong time by the time this one is complete.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 12:56 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.