Phase 1 at Restaurant Avo is now complete! It had a fast-track, 2 month turnaround. Phase 2 is starting soon… A big shout out to Chef Nick Lama, Studio West Design & Architecture, and our PEC Team for their hard work thus far! #PEC #Construction
We’ve made a lot of progress out at the Elmwood Shopping Center. The exterior facade looks fresh for the new Boulevard American Bistro location. Shout out to Dwell Design Studio and L+A Retail for being great clients! #Construction #PEC
618 N Rampart St·VCC General Work · Ref Code:B2ZPFY
Print Summary Submit Add to Watch List
Type:
VCC General Work
Applicant:
Javier Barrera
Status:
Application Submitted
Date Filed:
9/25/2019
Closed:
No
Description:
Interior Buildout of a sushi restaurant in an existing mix use building. no structural.
201 N Rampart St·Interior Demolition · Ref Code:RFN187
Print Summary Submit Add to Watch List
Type:
Interior Demolition
Applicant:
Walter Antin
Status:
Application Submitted
Date Filed:
9/23/2019
Closed:
No
Description:
The property has been vacant for decades. Last recorded use was a furniture store. Demo Scope: remove all of the old furniture and household items, remove all temporary (plywood) walls from ground level and level 3 (see red walls in plan). Remove old duct work on ground level. We intend to hire a haul & trash company and will not require a site dumpster for this job. No demolition to exterior shell, framing, slabs, floors, or roof.
3503 N Rampart St, 3523 N Rampart St, 1013 Gallier St, 1035 Gallier St·Conditional Use · Project #19-1883 · Ref Code:VC58SK
Download (13) Print Summary Submit Add to Watch List
Type:
Conditional Use
Applicant:
Cp Dlbf LLC
Status:
Application Submitted
Date Filed:
9/23/2019
Closed:
No
Description: