WILMINGTON | Crosby Hill | 140 FT | 12 FLOORS

Never thought I'd get to make a Wilmington thread!

Title: Crosby Hill
Project: Residential
Architect: Niles Bolton Associates
Developer: Buccini/Pollin Group
Location: 517 N. Shipley Street
Neighborhood: Downtown
Floors: 12
Height: 140 feet



From the Metro Thread:

Quote:
Originally Posted by Jawnadelphia View Post
^Thanks for posting. I emailed with Wilmington's zoning board and they sent me some more info.

517 N. Shipley project takes up the whole block, but the tower portion sits on the 6th Street side. Two smaller buildings run up and down Orange and Shipley Streets from the tower. The renderings below seem to be early drawings but I'll take it.

The building is 11 floors tall, but the 11th floor level is 16 feet tall (5 feet taller than the other floors) and is wrapped on 3 sides with a tinted glass railing, and there are many entrances/exits to the 11th floor outdoor terrace area which perhaps makes it possible this will be the site of a rooftop bar/lounge? Or maybe, simply rooftop amenities for residences. There is a 6 foot slab/mechanical level on top of the 11th floor level ... I'm really trying to push this to the 12 floors threshold as best as I can (haha!).

Edit: there actually is a legit level below the first floor on much of the building, that isn't counted as a floor (see the red circle below, and Orange Street side rendering). Soo 12 floors?!!

6th Street:


Shipley Street:


Orange Street:
__________________
Philadelphia Transportation Thread: http://forum.skyscraperpage.com/showthread.php?t=164129
     
     
  #2  
Old Posted Mar 16, 2021, 11:10 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,803
Amazing, thank you mcgrath!
     
     
  #3  
Old Posted Mar 17, 2021, 12:40 AM
jonesrmj's Avatar
jonesrmj jonesrmj is offline
Registered User
 
Join Date: Aug 2016
Location: Wilmington, DE
Posts: 552
This is awesome! Finally another high-rise in Wilmington!

Last edited by jonesrmj; Mar 17, 2021 at 2:12 PM.
     
     
  #4  
Old Posted Mar 17, 2021, 2:06 AM
JMKeynes JMKeynes is offline
BANNED
 
Join Date: Aug 2017
Location: SW3
Posts: 4,216
Is this Wilmington, DE or Wilmington, NC?
     
     
  #5  
Old Posted Mar 17, 2021, 2:26 AM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 45,840
Delaware.
     
     
  #6  
Old Posted Mar 17, 2021, 2:59 AM
JMKeynes JMKeynes is offline
BANNED
 
Join Date: Aug 2017
Location: SW3
Posts: 4,216
Quote:
Originally Posted by chris08876 View Post
Delaware.
     
     
  #7  
Old Posted Mar 17, 2021, 3:54 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,367
Looks superb! Looks like work is already starting on it too.
     
     
  #8  
Old Posted Mar 20, 2021, 10:49 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,803
I talked to a BPG worker while walking around this site today, he gave me some news (which is much appreciated). This project is definitely full steam ahead, the main tower crane will be erected in May.

Secondly, the old Frank Furness building which is next to here (on Market Street) and being renovated by BPG, will not only be a hotel, but BPG is putting an additional level to the top of the building which will be a rooftop bar/lounge. He also mentioned BPG is looking into putting an "underground bar" and restaurant on the ground level of the hotel as well (this must be related to their possible use of neighboring Willingtown Square).

As far as completion times, he said the hotel/bar will take about a year or so, and this project will be around two years.







Stock photo: Me

https://www.google.com/maps/@39.7416...7i16384!8i8192
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 10:05 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.