Quote:
Originally Posted by Ned.B
I heard that this building does indeed have piles for a foundation instead of caissons from someone on the design team.
FYI, the official ground breaking was yesterday, not that that has any association with being U/C
|
801 S Financial and 235 W Van Buren are on friction piles (technically caissons are piles as well). Has to do with the soil conditions in that area.