HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Suburbs


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Nov 7, 2012, 11:04 PM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
Stoney Creek Update

I am starting this new thread to be similar to the Downtown Update thread.

Seeing as there are small projects going on in Stoney Creek that don't always need a seperate thread and have nowhere else to be posted, I thought it was a good idea.

Just like the Downtown Update thread, we could dedicate this thread to new food / drink / retail shops.

Also any updates like road work, renovations to buildings, and just Stoney Creek developments in general can be posted here.

So update away!!!
Reply With Quote
     
     
  #2  
Old Posted Nov 7, 2012, 11:49 PM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
New Downtown Parkette Will Compliment Fountain Design

A new parkette will be built in downtown Stoney Creek on the western corner of Jones St and King St E. The parkette has been planned since the 1990s and was part of the Stoney Creek Old Towne Urban Design Plan approved by the former city council before amalgamation (Olde Towne Urban Design Plan pdf). The parkette design will mimic the design of the arbour structure at the fountain area on the opposite corner of Jones&King E. The parkette will feature a new clock tower, open green space, a circular walkway with benches, and a mixture of trees and shrubs. The project is expected to cost $400 000 and construction is expected to begin in spring 2013.



How the site currently looks:


Fountain area in the foreground that the parkette design will mimic, with the future parkette location in the background to the left:


Image Source: Google Maps&Google Street View
Reply With Quote
     
     
  #3  
Old Posted Nov 9, 2012, 4:31 PM
palace1 palace1 is offline
Registered User
 
Join Date: May 2008
Posts: 221
From the streetview image it looks like the current space already has Open Green Space, Shrubs and Trees, Benches.
Guess I'll have to wait and see the $400,000 "Olde Town Parkette" version to compare!
Reply With Quote
     
     
  #4  
Old Posted Nov 28, 2012, 4:35 PM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
An update for anyone who hasn't been to Stoney Creek in a while...

Here is an update on a few things that have happened in Stoney Creek (Mainly Olde Town/Downtown Stoney Creek) within the last few years for anyone that hasn't been to Stoney Creek in a while.


__________________________________________________________________________________________________________________________________

The old Fire Hall, built in 1931, was demolished.

Before:

After:

__________________________________________________________________________________________________________________________________

This convenience store on the corner of Lake Ave Dr and King St W was recently demolished to make way for a new doctors office.

Construction of the new doctors office...

Completed building...

__________________________________________________________________________________________________________________________________

After the bar/restaurant on the south-east corner of Queenston Rd and Lake Ave Dr burned down, this new building for a law firm replaced it. (I believe the old bar/restaurant was called the Day N' Night)

New building under construction...

Completed new building...

__________________________________________________________________________________________________________________________________

Another new building on the corner of 2 St N and King St W was built on an empty lot...

And this lot next door has been zoned for a 4-floor residential/commercial building...

A sign currently on the empty lot...




Sources:
Old Fire Hall Picture
Old Convenience Store Picture
& Google Street View
Reply With Quote
     
     
  #5  
Old Posted Nov 28, 2012, 5:30 PM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
"The owners of 120 King Street West (vacant lot east of the Police Station), Stoney Creek, have submitted an application for a zoning change to permit a four storey apartment building (69 units) and 10 lots for condominium townhomes. The City's Planning Department is currently examining the plan, and a notice will be mailed to adjacent property owners advising of the date, time and place of the Planning Committee where the application will be heard." - Source




Image Source: Google Street View
Reply With Quote
     
     
  #6  
Old Posted Nov 29, 2012, 3:55 PM
mishap mishap is offline
Registered User
 
Join Date: Dec 2007
Posts: 313
Maybe someone in this thread can answer a question for me: Where is (or was) the Stoney Creek Town Hall building within the old town? I figure it has to be somewhere near King & Lake. The old town had a very small area.
Reply With Quote
     
     
  #7  
Old Posted May 3, 2013, 12:10 AM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
The site is fenced off and construction is starting on the new parkette and clock tower.

Quote:
Originally Posted by MeIsThomas View Post
A new parkette will be built in downtown Stoney Creek on the western corner of Jones St and King St E. The parkette has been planned since the 1990s and was part of the Stoney Creek Old Towne Urban Design Plan approved by the former city council before amalgamation (Olde Towne Urban Design Plan pdf). The parkette design will mimic the design of the arbour structure at the fountain area on the opposite corner of Jones&King E. The parkette will feature a new clock tower, open green space, a circular walkway with benches, and a mixture of trees and shrubs. The project is expected to cost $400 000 and construction is expected to begin in spring 2013.



How the site currently looks:


Fountain area in the foreground that the parkette design will mimic, with the future parkette location in the background to the left:


Image Source: Google Maps&Google Street View
Reply With Quote
     
     
  #8  
Old Posted May 11, 2013, 12:40 AM
thomax's Avatar
thomax thomax is offline
Registered User
 
Join Date: May 2012
Location: Toronto
Posts: 5,380
Update

An update on projects happening in and around Downtown Stoney Creek:


1) There is construction going on at the Stoney Creek Plaza (where Boilers restaurant was). They are either starting the demolition of the building from that side, or they are renovating that side.

2) On the site of where the McGlashon's Martial Arts building use to stand (in between Britannia Cleaners and Shoppers Drug Mart), I saw some construction workers on the site. Something could be starting construction there soon.

3) Construction of the new parkette and clock tower on the corner of King St and Jones St is moving fast. The whole site is ripped up right now.
- Interesting fact: The sidewalks that surround the lot, where the new parkette will be, have been ripped up and will be replaced with the Hamilton styled sidewalks. The sidewalks that were ripped up were only 10 years old and they were part of the 1990s Olde Towne Urban Design Plan. The entire downtown Stoney Creek was suppose to get that style of sidewalk, but the only place they were ever built was around the new parkette site and around the fountain across the street. Now the sidewalks around the fountain across the street are the only remaining ones from the Olde Towne Urban Design Plan.

4) At Smiths Knoll (the memorial across the street, and a bit east from battlefield park) they are adding a memorial for the American soldiers. All of the walkways on the site have been built and some kind of statue may be built on the site soon.

5) The Target at Queenston Place is getting closer to completion, and all of Queenston Place is getting a renovated exterior.
Reply With Quote
     
     
  #9  
Old Posted Mar 15, 2013, 5:08 AM
Dr Nevergold Dr Nevergold is offline
Registered User
 
Join Date: Jun 2000
Location: Winnipeg
Posts: 20,104
Interesting, didn't even know Stoney Creek had its own sub topic until now. I have a friend in the area I visit often, so I'm there frequently.
Reply With Quote
     
     
  #10  
Old Posted Jul 9, 2013, 3:03 AM
Dwils01's Avatar
Dwils01 Dwils01 is offline
Urban Fanactic
 
Join Date: Mar 2010
Location: Coquitlam
Posts: 3,246
Eastgate Sqaure reclad/renovation


Stoney Creek Gateway Ice Centre


Old Stoney Creek Dairies site soon to be condominium.


Pictures by me.
Reply With Quote
     
     
  #11  
Old Posted Aug 31, 2013, 10:06 PM
lucasmascotto's Avatar
lucasmascotto lucasmascotto is offline
Registered User
 
Join Date: Feb 2012
Location: Hamilton
Posts: 356
Green space delayed
The Hamilton Spectator
By: Dave Churchill

Stoney Creek residents have been waiting a long time for improvements to a downtown parkette.

Now it seems the wait is going to be a little longer.

The small but prime piece of land at King Street East and Jones Street has been awaiting some improvements for years, said area Councillor Brad Clark, who has publicly laid the blame for recent delays on a contractor from Concord.

The $400,000 project includes an open green space area, a circular walkway with benches, and a mix of trees and shrubs. The work should have been completed by now, Clark said.

"There is a lot of frustration from the community. It's really a small parkette."

Clark said Pine Valley Enterprises had the lowest bid to complete the work but added, "I guess they've had trouble getting a subcontractor."

He said it was his understanding that a subcontractor hired to do stormwater, water tap connections and concrete work walked off the job before the project got under way.

Calls to Pine Valley Enterprises to ask about the delays weren't returned Friday.

While the delay is frustrating, Clark said he is enthusiastic about the impact the project will have on downtown Stoney Creek. Once the parkette is complete, the next big step will be rebuilding King Street, which will be done in consultation with the BIA and local residents.

Clark said the changes to King will help retain a small-town feel. "It's really quite exciting. It will make the downtown much more walkable for residents and tourists."

Ed Strecker, the head of the Olde Stoney Creek Business Improvement Area, said some of the merchants have grown tired of looking at the construction site surrounded by fencing.

"We're trying to tell people we're going to have a beautiful area when it gets done," Strecker said. "We've seen the pictures and it looks great but we just want to see it get done."

Work has been spread out over a number of years with the bulk of the capital cost set for 2014 and 2015.

Draft plans of the streetscape will be unveiled later this year to the BIA's merchants and residents. In 2014, public works will begin upgrading the sewers in advance of the rebuilding of King Street in 2015.

David Zimmer, a senior landscape architect for the city, said the parkette project has had some delays because of weather and other unexpected issues related to stormwater connections at the site.

Getting a subcontractor to complete the concrete work has also been a problem, he said.

"The site is all serviced and the water is in," he said. "Once the concrete gets done, things will move along quickly."

Zimmer expects Pine Valley to be back at the site in the next two weeks.
Reply With Quote
     
     
  #12  
Old Posted Sep 12, 2013, 3:04 PM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
CLC defers to others to critique Taro dump redesign
(Stoney Creek News, Richard Leitner, Sept 12 2013)

The Taro industrial dump’s community liaison committee won’t take a stand on owner Newalta Corp.’s bid to pile waste higher at the site, leaving it to others, including the city, to weigh in on the plan’s technical merits.

Citizen members on Monday agreed instead to simply inform the Ministry of the Environment they’re satisfied the public has been consulted and given the chance to comment – although only 10 people have done so thus far.

“We’re not considered to be experts on any of this stuff. We’re here to represent the community,” said Brad Hart, one of three citizen reps. “It wasn’t asked that all of a sudden we become environmental engineers and understand it.”

Area councillor Brad Clark suggested the neutral stand as a way “out of a box” the CLC was in because it didn’t have independent experts to critique the plan, which would limit the site to its current footprint but pile waste 4.5 metres higher than allowed by existing approvals.

He said the CLC has done all it can to ensure people are aware of the plan, including by holding a special meeting in July, insisting all documents be made publicly available and pushing Newalta to extend an initial Aug. 5 deadline for commenting to Sept. 30.

The company also advertised the proposal twice in the Stoney Creek News and circulated flyers to residents within 1.5 kilometres of the site, located at the southwest corner of Upper Centennial Parkway and Green Mountain Road.

“I don’t know what else the CLC could do,”Clark said. “We did reach out as best as we could, and the company did, but the CLC has pushed them to do it.”

Clark said the city is still assessing the proposal, but will likely raise concerns about the new height, potential odor and dust impacts on new homes being built to the north and south, and the scrapping of a planned new entrance off Mud Street.

He said the city’s lawyers are already objecting to the ministry’s view that the redesign is exempt from the Environmental Bill of Rights, which would require broader public consultation and allow any decision to be appealed.

“We think the EBR is being flushed. It’s slowly being dismissed,”Clark said, accusing the provincial Liberal government of putting business interests ahead of the public’s.

“More and more instruments (proposals) are not being filed on the EBR. I don’t even know what it’s worth anymore.”
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan
Reply With Quote
     
     
  #13  
Old Posted Sep 22, 2013, 12:51 PM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
Work set to begin on Taro leash-free dog park
(Stoney Creek News, Sep 12 2013)

Eighteen years after it closed, the former Taro west quarry industrial dump is finally being put to a promised community use with the announcement that work is set to begin on converting the site into a passive park that will include a leash-free area for dogs.

Lorenzo Alfano, site manager for owner Newalta Corp., said the first phase of the project will take about six weeks and start with the creation of pathways at the 23-hectare grassy wasteland, located at the northwest corner ofMud Streetand First Road West.

Work will then turn to the two-hectare dog park, he told the Taro community liaison committee on Monday.

Alfano said if “the weather cooperates,” the entire park will be open by the spring.

The city will maintain both the park and leash-free area, which will be fenced and the biggest ofHamilton’s eight dog parks.

“The biggest thing is obviously the plantings. We want to make sure we don’t put plantings into the ground too late,” Alfano said, citing a bad experience at the neighbouring Heritage Green sports park.

“They (once) planted about 2,000 trees in November and pretty much they were twigs the next year. We do not want the same thing to happen.”
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan
Reply With Quote
     
     
  #14  
Old Posted Sep 22, 2013, 12:56 PM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
New light, speed limit eyed for Upper Centennial Parkway
(Stoney Creek News, Richard Leitner, Sept 19 2013)

Stoney Creek Councillor Brad Clark says he hopes to see Upper Centennial Parkway add a new stoplight at Green Mountain Road by the end of the year as part of an overall plan to slow traffic by new residential development in the area.

Clark said he is preparing to introduce motions at city council this fall for the stoplight and a reduction in the speed limit on Upper Centennial and Mud Street to 60 km/h because the existing limits are no longer appropriate.

The new stoplight is needed, he said, to accommodate traffic generated by the Empire Homes survey being built to the northwest of the intersection on the former Chris Utter Farms property.

“If I had my way I’d have them done before the end of the year, but I don’t think we can get that accomplished,” Clark said of reducing the speed limits on Upper Centennial and Mud to 60 km/h from 80 km/h and 70 km/h, respectively.

“I hope to have the stoplight put in before the end of the year because the issue now is it’s not the people living there, it’s people coming in to consider buying. The fact that they’re not living there is irrelevant, they’re still coming in, lots of customers.”

Clark revealed his traffic plans for the area during discussion of Newalta Corp.’s plans to redesign the Taro dump at last week’s meeting of the site’s community liaison committee.

The redesign would pile waste 4.5 metres higher than allowed by existing approvals in return for limiting the dump to its current footprint – a reduction of 18 hectares.

It would also scrap plans to replace the existing entrance off Upper Centennial with a new one on Mud Street by the new Penny Lane Estates survey.

Clark said the city and Newalta had agreed to the proposed new entrance as a way to reduce the accident hazard posed by slow-moving waste trucks turning into the site on Upper Centennial.

He said the new entrance would see trucks “disappear” into the site via an internal road so that they wouldn’t be lined up on Mud.

Citizen members of the committee were divided on the new entrance.

“If I was in Penny Lane Estates and I lived in that area, I’d prefer that the entrance stayed out on Centennial,” Brad Hart said. “To me, it just makes so much more sense to keep the entrance out of a residential area.”

But Randy Valchuk said in his discussions with neighbours he’s found that how people feel about the entrance’s location depends on how often they use Mud or Upper Centennial, formerly known as Highway 20.

He said he’s concerned the redesign will only add traffic to the dump because of a plan to fill the foregone 18 hectares of quarry with clean fill.

“When I come up Highway 20 and almost see somebody slamming into the back of the truck all the time, especially when they’re turning just before the Pioneer (gas station) when people are coming up, it’s actually scary coming up Highway 20 with those trucks coming up there,” Valchuk said.

Newalta communications director Greg Jones said the redesign is projected to result in an additional 12 truck trips to the dump per day for a total average of 97.

That’s still well below the 250 allowed by the site’s licence, he said.

Clark said afterwards he believes Newalta is using opposition to the new entrance to “leverage” community support for the redesign, which he fears will only increase dust and odour issues, especially at the Empire Homes survey.

“It’s really not fair for that community,” he said. “If I had known as a councillor that they were going to be doing that before we approved Empire, I would have fought vigorously to not approve Empire for 10 years.”

The public has until Sept. 30 to comment on the redesign. Newalta has posted more information on the plan at www.newalta.com\landfilldesign.
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan
Reply With Quote
     
     
  #15  
Old Posted Oct 7, 2013, 5:47 PM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
Officials unveil $25-million arena complex
(Stoney Creek News, Mike Pearson, Oct 7 2013)

After six months of user feedback, the reviews are looking good for the Gateway Ice Centre.

The 128,000 square-foot, three pad facility held a grand opening on Saturday to showcase its three NHL-sized ice rinks, 8,000-square-foot Five-Star Fitness and Nutrition Centre plus a Don Cherry’s Sports Grill with a panoramic rink view.

Gateway co-owner and president Danny Trombetta has heard many positive comments from users so far.

“It’s spectacular. It’s beautiful. Its a go-to destination,” he said.

Located at the corner of South Service and Fruitland roads, the $25-million complex will host the 2014 Esso Cup, which will feature the country’s best midget girls hockey teams next April. Sports tenants include the Stoney Creek Girls Hockey Association, Steel City Hockey Development Program, the Gateway Ice Centre Figure Skating Program and the new Senior AAA expansion franchise, the Stoney Creek Generals. Local fans will get their first opportunity to see the Generals in action when the team faces off for its first preseason game on Oct. 20. The Generals will play the majority of their home games on Sunday afternoons.

Gateway officials are already poised for further expansion. The current three pad complex can be expanded to four. A three-storey commercial addition is also in the works.

Gateway project manager Tony Falasca said the commercial space would be marketed towards sports-related tenants. Falasca’s goals include attracting a hockey development school, sports agency and a sports injury rehabilitation centre. The commercial expansion would also feature a community meeting room.

Trombetta hopes to have the fourth ice pad built by September, 2014....

Gateway’s rink one includes a skybox viewing area, a professional style overhead scoreboard, 7,000 watt sound system and a glassed viewing area from Don Cherry’s Sports Grill. Rink one has a seating capacity of 1,400 in a bowl shape around the ice. Rinks two and three seat 400 each. Bleacher style seating is arranged in two rows with safety glass and netting to protect fans.

Infrared indirect heating is used for climate control, with an oversized dehumidication system to reduce fog in the viewing areas.

Rink two features a rubberized wraparound running track with five sprinting lanes. A pro shop includes skate sharpening and free WiFi access.

Rink three is slightly smaller than the other two NHL-sized surfaces. It is used primarily as a figure skating practice rink.
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan
Reply With Quote
     
     
  #16  
Old Posted Oct 8, 2013, 8:24 PM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
Hamilton begins to transform Confederation Park
(Stoney Creek News, Kevin Werner, Oct 7 2013)

The multi-million-dollar makeover of Confederation Park, which may include honouring the iconic War of 1812 ships, the Hamilton and Scourge, should begin later this year.

Members of the public works committee approved at their Oct. 7 meeting, cutting down 76 existing trees at the park’s Stoney Creek Pond area. An additional 28 trees that are in poor condition or are invasive species will also be cut down.

The work will allow city staff to build another kilometer of trail, which is an important aspect to the $80-million Confederation Park master plan project that council approved earlier in 2010. A public information session to outline the draft uses of the project was presented to the community in December 2012.

The plan includes constructing a Class ‘A’ 6-metre asphalt paved trail that would connect with the Lake Ontario Trail system. The new trail will provide an additional 790 metres of trail and an accessible observation platform. An existing 1.5-metre granular trail along the eastern shoreline of the Stoney Creek Pond will be maintained. It’s expected to cost about $5,000 annually to maintain the trail.

About 80 per cent of the trail will be constructed on existing roadways within the park. A portion of Confederation Drive, for instance, will be converted into trail and to for service vehicle use only. About 20 per cent of the trail will be constructed through the forested area.

Ward 5 councillor Chad Collins said construction on the trail should begin later this year, and be fully available to the public by next year.

It’s expected to cost just over $100,000 to remove the trees, but $36,300 will be offset for the new tree plantings.

But the trail project is only the beginning of what will be a multi-year project to rejuvenate the 93-hectare Confederation Park so it becomes a destination point for people.

“I want to have something going on every year at the park,” said Collins.

He said about $3 million has been allocated in the 2014 budget for the park.

Collins said he will be securing the estimated $7 million to construct the sports park around the 5.8-hectare Stoney Creek Pond area, and eradicate the former campground site, identified in the master plan. The sports field area, which will include a cricket pitch, two intermediate soccer fields that can be changed into a junior cricket pitch, an on-site parking lot, washrooms, and new tree plantings, was one of the new additions to the uses of the park that had area residents applauding.

The Stoney Creek Pond is near an adjacent forest and is designated as a local natural area under the city’s urban official plan.

Collins said the cost for the sports park will be comparable to the Heritage Green sports complex on Upper Stoney Creek.

But the $7 million will only be a portion of the $80 million that will be spent on renovating Confederation Park. The master plan recommends creating a year-round, multi-use facility for the public that proposes relocating the go-kart facility from the west end to a more central facility; eliminating the greenhouse; building a new main entrance at the end of Centennial Parkway; allowing public transit access within the park; partnering with the private sector to open some commercial ventures, such as a restaurant; and allowing winter activities, such as an ice skating area.

The park attracts about 1,200 visitors a day, and about 250,000 people in a year. Collins suggests that as the park transforms into a more user-friendly area, it could conceivably see over 1 million people take part in activities in the facility.

He will also be securing money for a new entrance from the North Service Road, and the relocation of the park’s main entrance. Collins said he will be talking to residents along Grays Road to mitigate any parking and traffic issues in their area.

What Collins also envisions is to redevelop the park to honour the War of 1812 ships Hamilton and Scourge, which he says have been forgotten by the city and residents.

“We have undervalued the importance of those ships,” said Collins.

He said there was initial excitement within the community when the ships were discovered in Lake Ontario in 1975. And that positive feeling remained when they were featured on the cover of the National Geographic magazine. But Collins said over the years, even during the War of 1812 celebrations, the Hamilton and Scourge have been, if not forgotten, at least muted in their importance to the community. A memorial area in the park for the Hamilton and Scourge sailors who lost their lives is tucked away, hidden from view by the trees and buildings.

Collins is suggesting a design contest be held to create a new entrance to the park. He wants to keep with the nautical theme throughout the park, and incorporate the new design into signs, and information areas.

Collins helped to create the nautical theme entrances to Bayfront Park, and along the Waterfront. The sculpture design at Pier 4 with the sale being held down by individuals has become a distinctive scene for the Hamilton area. Collins wants the same thing to happen for the newly designed Confederation Park renovation.

“It’s important to have a significant gateway entrance for the park,” said Collins.

“I would like to see the park celebrate the Hamilton and Scourge, and identify with it.”
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan

Last edited by thistleclub; Oct 8, 2013 at 8:42 PM.
Reply With Quote
     
     
  #17  
Old Posted Nov 12, 2013, 4:11 PM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan

Last edited by thistleclub; Nov 12, 2013 at 4:22 PM.
Reply With Quote
     
     
  #18  
Old Posted Nov 15, 2013, 2:49 AM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
Devil’s Punchbowl to get brighter, energy-efficient cross
(Stoney Creek News, Nov 13 2013)

Tony Goemans loved to hike the Devil’s Punchbowl Conservation Area, making it part of a daily round trip that he and his dog took from their Battlefield Drive home for nearly 15 years – one that took precisely 42 minutes.

Now, the upper Stoney Creek park’s iconic cross will burn more brightly in the memory of Goemans, founder of the successful appliance-store chain that bears his name, thanks to a $50,000 donation from his family.

The money will allow the Hamilton Conservation Authority to replace the deteriorating cross with a brighter, more energy efficient one and make other improvements to the surrounding landscape and amenities.

Son Jason Goemans said the donation on behalf of his dad, who died from melanoma in August at age 66, acknowledges the joy the Devil’s Punchbowl brought his entire family.

He said an annual, supplemental donation will keep the cross powered and help remove the parking meter to make the area more of a visitor destination.

“That area represents a lot of good times, a lot of good memories and we just want to offer a small token of our appreciation,” Jason Goemans said.

“It really is un underutilized resource that a lot of people don’t know. There’s all kinds of wildlife, birds,” he said. “The vistas of the city really are fantastic.”
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan
Reply With Quote
     
     
  #19  
Old Posted Nov 15, 2013, 2:52 AM
thistleclub thistleclub is offline
Registered User
 
Join Date: Mar 2008
Posts: 3,728
Second time the charm for Fruitland-Winona plan?
(Stoney Creek News, Kevin Werner, Nov 13 2013)

The Stoney Creek community will get a do-over to dissect the controversial Winona-Fruitland Secondary Plan next week after city councillors approved the document last June.

But the outcome should be the same, with the document, which is a blueprint for the future growth of the Winona and Fruitland area, heading to the Ontario Municipal Board to decide its future.

Stoney Creek councillor Brenda Johnson said she has been consulting with planning staff about the problem areas of the plan, such as building height. But she is still prepared to oppose the document just as she originally did five months ago.

The secondary plan was thrown back to the municipality again in September because of a bureaucratic mix-up. When the Ontario Municipal Board approved most of Hamilton’s urban Official Plan in September it meant the official plans of the former suburban areas, including for Stoney Creek, were rendered null and void.

So the Winona-Fruitland Road Secondary Plan has to go through the city planning process again, including holding a public meeting and having councillors vote on it, to add it to the city’s new Official Plan.

The secondary plan is scheduled for discussion at the Nov. 19 planning committee meeting, starting at 9:30 a.m.

At the insistence of Johnson, the meeting is being held at the former Stoney Creek city hall on Jones Road to accommodate what is expected to be a large number of interested local residents who will turn out for the debate.

City planning officials said the substance of the secondary plan will not change. After a contentious and long public meeting in June, councillors approved the plan. An OMB date had already been scheduled in the fall after 16 appellants appealed council’s decision.

Johnson expressed some concerns that opponents of the secondary plan will use the bureaucratic confusion to their advantage in an attempt to overturn council’s decision.

But city planning staff said they followed proper planning procedures.

The controversial secondary plan, which was first proposed in 2007, has created a lot of hard feelings within the Winona and Fruitland Road areas.

Residents have opposed such planning ideas as increasing the density within the area, especially along Barton Street, the possible harm to the area’s tender fruit farmers, and realigning Fruitland Road to the east.

The plan also includes a gateway feature, a Winona Road commercial area, and boosts the density for the area by 73 people and jobs per hectare in an attempt to accommodate about 21,000 more people. The plan will immediately impact the lands bordered by Fruitland and Fifty roads, and Barton Street to Highway 8.

Opponents have stated the plan will destroy the small-town lifestyle of the area, increase traffic, and contribute to more health and safety issues.

During the June public meeting over 100 people packed city hall’s council chambers in protest of the plan. They were particularly incensed at having a document that would allow six-storey apartments along Barton Street and four-storey buildings along other streets in the Fruitland-Winona area. A petition, which had about 400 signatures, was also presented to councillors in opposition to the document.

Politicians did narrowly prohibit six-storey buildings after residents complained about a “wall of apartment buildings.”

A Stoney Creek Urban Boundary Expansion community advisory committee, chaired by resident Cal DiFalco and created in 2007, had recommended a revised secondary plan in 2009. But city officials rejected the committee’s recommendations and suggested their own plan for the area. City officials rejected the committee’s ideas.

DiFalco said at the public meeting members felt they were ignored by the city after they spent two years of their time trying to create a proper planning document for their community.

“The plan has lost its way,” said DiFalco.

Developers, though, have applauded the plan. They described it as “balancing” the needs of the community, and they have assured the community there is no market demand for apartments along Barton Street.

The entire plan is available to people to view at the city’s website www.hamilton.ca/fruitland-winona. People can also see the document at the Stoney Creek Municipal Service Centre.
__________________
"Where architectural imagination is absent, the case is hopeless." - Louis Sullivan
Reply With Quote
     
     
  #20  
Old Posted Nov 15, 2013, 6:51 AM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 6,527
Quote:
Originally Posted by thistleclub View Post
Opponents have stated the plan will destroy the small-town lifestyle of the area, increase traffic, and contribute to more health and safety issues.
With all due respect to their opinions, I still don't understand the opposition. "Small town" doesn't really exist in Winona - between the Hwy 8 "village" and Barton St. is mostly subdivision development. It does not say small town as it is, not to me anyway.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Suburbs
Forum Jump



Forum Jump


All times are GMT. The time now is 2:37 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.