Great news for SUNO!.
Grass Plans Seven-Building, 48,000 Square Foot Retail Development in Kenner
http://canalstreetbeat.com/grass-pla...ent-in-kenner/
Orleans School Board placing historic buildings, empty lots up for auction
http://www.theneworleansadvocate.com...acing-historic
Bevi Seafood Co. Nabs Cajun Brothers Spot For Mid City Expansion
http://nola.eater.com/2015/7/27/9049...fall-expansion
Permits:
315 Decatur St·Renovation (Non-Structural) ·Ref Code: D0V17K
Print Summary SubmitAdd to Watch List
Type:
Renovation (Non-Structural)
Applicant:
John C. Williams
Status:
Application Submitted
Date Filed:
7/29/2015 10:21:11 AM
Closed:
No
Description
This initial submittal covers work for VCC approval of exterior modifications to the building. Future work to be included will be interior renovations to the apartment units as well as necessary repairs and upgrades to the electrical and mechanical systems. We submitted this application yesterday through One Stop at approximately 2:45, but are submitting again because the submittal is not showing up in your system.
2230 Lakeshore Dr, Bldg C·New Construction ·Ref Code: 13M108
Download (1) Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Revival Development LLC
Status:
Application Submitted
Date Filed:
7/28/2015 2:06:28 PM
Closed:
No
Description
New construction of a 4 unit condo building as per plans. (Unit C-1, C-2, C-3 & C-4 )
2230 Lakeshore Dr, Bldg B·New Construction ·Ref Code: 53D4B2
Download (1) Print Summary SubmitAdd to Watch List
Type:
New Construction
Applicant:
Revival Development LLC
Status:
Application Submitted
Date Filed:
7/28/2015 1:58:51 PM
Closed:
No
Description
New construction of a 3 unit condo building as per plans. (Unit B-1, B-2 & B-C )
3801 Tchoupitoulas St·Renovation (Non-Structural) ·Ref Code: 36S54M
Download (2) Print Summary SubmitAdd to Watch List
Type:
Renovation (Non-Structural)
Applicant:
Robert L Jones
Status:
Application Submitted
Date Filed:
7/28/2015 12:40:51 PM
Closed:
No
Description
Permit to renovate existing bar - change the way the door swings and reopen bar as per State Fire Marshal approval.
852 Tchoupitoulas St·Change of Use ·Ref Code: 1N38FA
Download (2) Print Summary SubmitAdd to Watch List
Type:
Change of Use
Applicant:
Mark and Madeline Spiers
Status:
Application Submitted
Date Filed:
7/29/2015 11:24:43 AM
Closed:
No
Description
Convert vacant commercial space into health club(tour cycle studio) as per plans. No exterior work under this permit. Signage shall require a separate permit and HDLC approval.
307-311 Tchoupitoulas St·Conditional Use · Project #ZD071-15 ·Ref Code: 1LV67V
Download (13) Print Summary SubmitAdd to Watch List
Type:
Conditional Use
Applicant:
Trinion Properties, LLC
Status:
Draft Application
Date Filed:
7/8/2015 11:58:05 AM
Closed:
No
Description
Amendment to Conditional Use authorized by Ordinance #18815 MCS to allow one additional non-time share unit on the top floor.
210 Decatur St·Renovation (Structural) ·Ref Code: 86W0N6
Download (2)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
John C. Williams
Status:
Application Submitted
Date Filed:
7/27/2015 10:02:34 AM
Closed:
No
Description
Interior/exterior renovation of five floors. Existing vacant building provide ground floor commercial white box and 7 residential units on the four floors above.
1001 Canal St·HDLC COA · Permit #15-17284-HDLC ·Ref Code: UPUHSY
Download (1)
Print Summary
Add to Watch List
progress
ype:
HDLC COA
Applicant:
Hammy Halum
Status:
Permit Issued
Date Filed:
7/30/2015 8:08:30 AM
Closed:
No
Description
Exterior Façade Restoration
217 Chartres St·Renovation (Structural) ·Ref Code: 1TF3L8
Download (1)
Print Summary
Add to Watch List
progress
Type:
Renovation (Structural)
Applicant:
Palmisano Contractors LLC
Status:
Application Submitted
Date Filed:
7/29/2015 1:12:45 PM
Closed:
No
Description
Interior Renovations
3939 Tulane Ave·Renovation (Non-Structural) ·Ref Code: RVN1B4
Print Summary
Add to Watch List
progress
Type:
Renovation (Non-Structural)
Applicant:
Brett Perrier
Status:
Application Submitted
Date Filed:
7/30/2015 12:13:54 PM
Closed:
No
Description
nterior Build Out of the 1st Floor including: addition of 2 ADA restrooms, a new office, new flooring throughout, a new HVAC system, and new light fixtures.
Moxy Hotel Renovations
Iberville Phase IV
Photos of Various Construction Projects (taken 7/30/15) Some of them are blue because of the tint on my windshield
The Jung Hotel:
The Beacon South Market:
The Paramount :
The Park:
DDay Museum parking Garage:
600 Block Baronne:
700 Block of Baronne Construction:
Office Building on St Joseph Street:
Ace Hotel :
S Rampart renovation:
Rault Center renovation:
Okeefe Garage:
The California Building:
Port Marigny would bring 429 housing units, hotel, marina, stores to Mandeville lakefront
http://www.nola.com/politics/index.s...hared-business
Where to put a public transit center in downtown New Orleans?
http://www.nola.com/politics/index.s...l#incart_river
Work on Holy Cross Redevelopment to Begin Early 2016
http://nola.curbed.com/archives/2015...ction-date.php
Palace Cafe Is Getting A Kitchen Overhaul & Swanky New Rum Bar
http://nola.eater.com/2015/7/29/9066...ky-new-rum-bar
Opening Report: Second Line Brewing Opens in Mid City
http://nola.eater.com/2015/7/30/9074...d-line-brewing
Miscellaneous Information:
Source told me Tracage should start up construction again in the next month!
deadline for Piaza Di Italia redevelopment is today!