HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Aug 9, 2015, 4:29 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,319
Cool CHICAGO | Highrise Projects & Construction, v7

Welcome to v7.3 (Sept 2018) of the Chicago High-rise Boom thread. - Here’s a link to the previous version of this page: CHICAGO: boom rundown - everything over 12 floors. v6

After a prolonged dip in development and construction during the leanest years of the Global Recession, the construction boom is back in full effect - while clearly not (yet) as prolific as the early 2000s, highrise activity has picked up considerably since 2013. Click on the individual building names to be taken to the corresponding Phorio building page to learn more and see pics/renderings. You can also click on the word “website” at the end of each building entry line in the list to be taken to the official project website to learn even more and for developer/marketing contact information. The buildings are ranked according to the structural height per the guidelines of Phorio. Where no roof height is listed, it is either unknown or the structural height and the roof height are one and the same.

A couple of quick notes on version 7:

- The 'Recently Completed' list will primarily reflect the new construction boom - the previous list is still accessible in version 6 of this rundown.

- Individual skyscraper thread links have been moved to the bottom of the rundown and will be updated to reflect current construction projects, plus new and forthcoming proposals.

- the 'Proposed' section of renderings has a status next to each project, whether they are 'Active' or 'Dormant' proposals. Any dormant proposals that are cancelled will be removed from the Boom rundown.

Please feel free send a private message or directed post in the thread for any updates or modifications to the page 1 list. A concerted effort will be made to make sure page 1 is always up to date. Many thanks to all of the contributors, custodians and photographers of this thread among others, for all of your painstaking work in showcasing Chicago's beautiful skyline.


***MODERATOR NOTE***
If a photographer is fine with their personal work being displayed in this forum WITH PROPER CREDIT, as well as falling in line with other forum rules, then so be it. Please refer to Forum rules if you need assistance with figuring out how to cite the work of others.


Chicago's building boom:


color code:
red = over 1,000 ft
magenta = 700 - 999 ft
purple = 600 - 699 ft
blue = 500 - 599 ft
green = 400 - 499 ft
brown = 300 - 399 ft
Black = under 300 ft or unknown


     name                                   use            height     floors     year


Under Construction:
  1. Wanda Vista                         res./hotel       1191 ft       98       2019
  2. NEMA Chicago    residential       893 ft       80       2019
  3. One Bennett Park                    res./hotel        836 ft       68       2018
  4. 110 North Wacker Drive              office            800 ft       51       ____
  5. Wolf Point, East Tower              residential       679 ft       62       ____
  6. Essex Inn addition                  hotel             607 ft       56       ____
  7. CNA Center                          office            568 ft       36       2018
  8. 465 N. Park                         residential       535 ft       45       2018
  9. One South Halsted                   residential       495 ft       44       ____
  10. The Paragon             residential       488 ft       48       ____
  11. No. 9 Walton                        residential       456 ft       37       2017
  12. Old Town Park Phase 2              residential       380 ft       39       ____
  13. Old Town Park Phase 1              residential       341 ft       32       ____
  14. The Cooper at Southbank               residential       321 ft       29       ____
  15. McHugh Hotel (Chinatown)            residential       320 ft       27       ____
  16. 1101 South Wabash                   residential       306 ft       30       ____
  17. 1136 South Wabash                   residential       304 ft       29       ____
  18. 8 East Huron                        residential       300 ft       26       ____
  19. 3Eleven Illinois                    residential       298 ft       24       ____
  20. 1600 E. 53rd Street        residential       295 ft       26       ____
  21. 1333 S. Wabash                      residential       ___ ft       28       2015
  22. Eight Eleven Uptown, Phase I        residential       260 ft       26       ____
  23. Solstice on the Park                residential       268 ft       25       ____
  24. 237 East Ontario                    residential       262 ft       26       ____
  25. Toyoko Inn Hotel        hotel       ___ ft       24       ____
  26. The Mill (734 N. Milwaukee)        residential       ___ ft       23       ____
  27. 215 W. Hubbard                      office/res.       255 ft       22       ____
  28. GEMS Academy Phase 2                educational       240 ft       13       ____
  29. The Lincoln Common Bldg.A1          residential       214 ft       20       ____
  30. The Lincoln Common Bldg.A2          residential       214 ft       20       ____
  31. 1001 W. Chicago (S. Tower)          residential       201 ft       16       ____
  32. 1001 W. Chicago (N. Tower)          residential       170 ft       15       ____
  33. 625 W. Adams                        office            ___ ft       18       ____
  34. Wicker Park Connection              residential       174 ft       15       2018
  35. Nobu Hotel                          hotel             154 ft       13       ____
  36. Webster Square - TO                 residential       152 ft       12       ____
  37. The Renelle                         residential       ___ ft       17       ____
  38. 181 Huron (Marlowe)                 residential       ___ ft       15       ____
  39. NU Biomedical Research Ctr.         hospital          ___ ft       15       2019
  40. 165 N. Des Plaines                  residential       ___ ft       14       ____
  41. 1411 S. Michigan                    residential       ___ ft       14       ____
  42. 111 South Peoria                    residential       ___ ft       13       ____
  43. Hoxton Hotel                        hotel             ___ ft       12       ____

“TO” indicates that the building has been topped out





Site Prep/Demo:
  1. 130 N. Franklin                     office            700 ft       50       ____
  2. 1061 West Van Buren                 residential       330 ft       32       ____




Proposed:
  1. Tribune Tower East/addition                         res./hotel       1422 ft       113       2020
  2. 400 Lake Shore Drive (1)                         res./hotel       1100 ft       76       2020
  3. One Chicago Square (1)                         res./hotel       1046 ft       76       2020
  4. Wolf Point, South Tower             office/res.      ~950 ft       70       ____
  5. Lake Shore East Site I                   residential       875 ft       80       ____
  6. 400 Lake Shore Drive (2)                   residential       850 ft       65       ____
  7. 1000 S. Michigan                    residential       832 ft       73       ____
  8. One Chicago Square (2)                  res./hotel        690 ft       49       ____
  9. 201 North Columbus                  res./hotel        642 ft       __       ____
  10. 725 W. Randolph/Equinox Hotel                  res./hotel        615 ft       52       ____
  11. 590 W. Madison                      office/hotel      582 ft       44       ____
  12. Atrium Village Phase 4              residential       420 ft       44       ____
  13. Atrium Village Phase 3              residential       410 ft       41       ____
  14. 900 W. Randolph              residential       ___ ft       39       ____
  15. 330 North Clark                     residential       377 ft       __       ____
  16. 1028 North Dearborn                 residential       365 ft       29       ____
  17. Weed and Fremont                    residential       339 ft       31       ____
  18. Chicago and Cambridge               residential       300 ft       __       ____
  19. State & Lake                        residential       ___ ft       31       ____
  20. River South South                   residential       ___ ft       29 & 19  ____
  21. Printers Row tower                  residential       ___ ft       24       ____
  22. Montrose and Clarendon, Phase II    residential       ___ ft       16       ____
  23. Cedar Hotel                         hotel             208 ft       18       ____
  24. 162 West Superior                   residential       189 ft       17       ____
  25. 171 West Van Buren                  residential       ___ ft       40       ____
  26. Wabash and Superior                 res./hotel        ___ ft       36       ____
  27. 353 West Grand                     residential       ___ ft       32       ____
  28. LDVA Student Housing                residential       ___ ft       32       ____
  29. 725 West Randolph                   residential       ___ ft       31       ____
  30. LaSalle and Illinois                residential       ___ ft       31       ____
  31. Wacker Plaza                        office            ___ ft       31       ____
  32. Wells & Congress Pkwy               hotel             ___ ft       27       ____
  33. 217 North Jefferson                 residential       262 ft       27       ____
  34. 460 West Chicago                    residential       ___ ft       25       ____
  35. 808 North Wells                     residential       ___ ft       24       ____
  36. Blanc Chicago (Wells and Ontario)   residential       ___ ft       23       ____
  37. Jefferson and Polk                  residential       ___ ft       22       ____
  38. 300 West Huron                      residential       ___ ft       22       ____
  39. Wells and Ontario (NW corner)       residential       ___ ft       22       ____
  40. Fulton & Ashland                    office            ___ ft       20       ____
  41. 2109-2135 South Wabash complex      residential       ___ ft       19       ____
  42. 181 N. Clark hotel                  hotel             ___ ft       19       ____
  43. 645 West Madison                    office            ___ ft       19       ____
  44. 2775 North Hampden                  residential       ___ ft       17       ____
  45. Andaz Hotel                         hotel             ___ ft       18       ____
  46. 900 West Randolph                   residential       ___ ft       17       ____
  47. Illinois Medical District Complex   hotel/res.        ___ ft       16       ____
  48. JBC West Loop Mega Lot              residential       ___ ft       13-17    ____
  49. Bush Temple Tower addition          residential       ___ ft       15       ____
  50. Study at The University of Chicago  hotel             ___ ft       15       ____
  51. Grand Imperial Hotel                hotel             ___ ft       15       ____
  52. Bluewater 5440                      residential       ___ ft       14       ____
  53. Bridgeford Foods site               residential       ___ ft       13       ____
  54. Fulton Market tower                 residential       149 ft       12       ____
  55. 210 North Carpenter                 commercial        ___ ft       12       ____
  56. 768 North Aberdeen                  residential       ___ ft       12       ____
  57. 975 West Wilson                     residential       ___ ft       12       ____
  58. Ibero-American Tower                office/hotel      ___ ft       __       ____
  59. Chicago Riverline                   multi-resi.       ___ ft       __       ____
  60. Union Station Redevelopment                   office/hotel/multi-resi.       ___ ft       __       ____
  61. Lincoln Yards                   office/multi-resi.       ___ ft       __       ____
  62. The 78                   office/multi-resi./educational       ___ ft       __       ____







Under Construction


Vista Tower







NEMA Chicago







One Bennett Park







110 N. Wacker







Wolf Point, East Tower (right) - Active







Essex Inn addition - Active







CNA Center







465 North Park







One South Halsted - Active







The Paragon Chicago - Active







No. 9 Walton







Atrium Village Phase 1







The Cooper at Southbank







McHugh Hotel (Chinatown) - Active







1101 S Wabash







1136 South Wabash - Active







State and Huron







3Eleven Illinois







1333 South Wabash







Eight Eleven Uptown, Phase I







Solstice on the Park







215 West Hubbard







1600 E. 53rd St







The Mill (734 N. Milwaukee)







145 S. Wells







Toyoko Inn Hotel







237 East Ontario - Active







1001 West Chicago







625 West Adams







Wicker Park Connection







Webster Square







The Renelle







Lincoln Common (A & B)







'Gr333n







181 Huron/Marlowe







NU Biomedical Research Center








EMME Chicago







1411 South Michigan







111 South Peoria - Active







Hoxton Hotel









Site Prep/demo


130 North Franklin







Atrium Village Phase 2







1061 W. Van Buren









Proposed


Tribune Tower East/addition - Active







400 Lake Shore Drive (1 & 2) - Active







One Chicago Square (1 & 2) - Active







Wolf Point, South Tower (center) - Active







Lakeshore East Site I - Active








1000 South Michigan - Active








201 North Columbus - Active








725 West Randolph/Equinox Hotel - Active







590 West Madison







Atrium Village Phases 2, 3 and 4 - Active







330 North Clark - Active







1028 North Dearborn - Active







Weed and Fremont - Active







River South South - Active







Wells and Congress Parkway Hotel - Active







217 N. Jefferson - Active







181 N. Clark hotel - Active







Bush Temple Tower addition







Printers Row tower - Active







808 North Wells - Dead







300 West Huron - Active






Jefferson and Polk - Active







Montrose and Clarendon, Phase II (rendering on the right) - Active







Fulton & Ashland - Active







Andaz Hotel - Active







2109-2135 South Wabash complex - Active







162 West Superior - Dormant







Fulton Market tower - Active







Nobu Hotel - Active







171 West Van Buren - Dormant







Wabash and Superior - Active










353 West Grand - Active







LDVA Student Housing - Dormant







725 West Randolph - Active







LaSalle and Illinois - Active







Wacker Plaza - Dormant








JBC West Loop Mega Lot - Active







900 West Randolph Block - Active







The Study at the University of Chicago - Active







460 West Chicago - Active







Bridgeford Foods development site - Active







Blanc Chicago (Wells and Ontario) - Active







645 West Madison - Active








Illinois Medical District Complex - Active







Bluewater 5440 - Dormant (possibly dead)






Ibero-American Tower - Active







210 North Carpenter - Active







768 North Aberdeen - Active







975 West Wilson - Active







Riverline Development (multiple highrises) - Active

__________________
Don't be shy. Step into the light.

Last edited by sentinel; Sep 2, 2018 at 2:36 AM. Reason: Updated project rendering and project status.
Reply With Quote
     
     
  #2  
Old Posted Aug 9, 2015, 4:32 PM
Kngkyle Kngkyle is offline
Registered User
 
Join Date: Jul 2006
Location: Chicago
Posts: 3,112
Nice! Thanks for taking on this huge project.
Reply With Quote
     
     
  #3  
Old Posted Aug 9, 2015, 4:47 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,319
Happy to do it. Apologies to Harry, JMT and marothisu, as your lasts posts in v6 were cut off. Please feel free to re-post here so as to pick up where we left off.
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #4  
Old Posted Aug 9, 2015, 8:30 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,457
Thanks for doing this. The thread needs a to make it easier to pick out.
Reply With Quote
     
     
  #5  
Old Posted Aug 9, 2015, 9:03 PM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Chicago region
Posts: 21,375
Great work, Sentinel!
Reply With Quote
     
     
  #6  
Old Posted Aug 9, 2015, 9:17 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,457
Also 1333 S Wabash should be listed as U/C, the foundations are already in the ground and they are clearly excavating them and prepping to form the mat.

Also, has anyone driven by 750 N Hudson recently? They closed their loan a week or two ago so they should have shovels in the ground (unless of course they are in permit hell, but they usually don't close loans until the permit has been issued).
Reply With Quote
     
     
  #7  
Old Posted Aug 9, 2015, 10:05 PM
Chicago Shawn's Avatar
Chicago Shawn Chicago Shawn is offline
Registered User
 
Join Date: Jan 2003
Location: Chicago
Posts: 2,817
Great work, although a bit sad to see the impressive recently completed list stripped from page 1. First update: Marriott Marquis is definitely under construction
Reply With Quote
     
     
  #8  
Old Posted Aug 9, 2015, 11:51 PM
jc5680's Avatar
jc5680 jc5680 is offline
Registered User
 
Join Date: Oct 2007
Location: Seattle
Posts: 1,367
Thanks for picking up the mantle, it is certainly a big project to take on, it is much appreciated

A couple things I noticed…

This guy is missing from the thread title, he is usually a part of all the Chicago threads

Hyatt Place in the loop is done, and has been operating for several weeks.

I believe gateway tower is all wrapped up now too.

I would be strongly in favor of keeping the recently completed projects list. It ads context to boom and as someone in the last version noted, it serves as a nice archive of what has been completed in recent years.
Reply With Quote
     
     
  #9  
Old Posted Aug 10, 2015, 12:10 AM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,319
So I moved the following to U/C:

- Marriott Marquis
- 1333 S Wabash

Edit: 'Recently Completed' list re-added towards end of rundown, with new additions only as they are completed, moving forward:

- Hyatt Place
- Gateway Tower, West Loop


Thanks for all of the information.
__________________
Don't be shy. Step into the light.

Last edited by sentinel; Aug 10, 2015 at 12:25 AM.
Reply With Quote
     
     
  #10  
Old Posted Aug 10, 2015, 12:54 AM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,457
Also, answered my own question earlier, 750 N Hudson is in site prep with three excavators ripping up the parking lot. I imagine it is only a matter of weeks before the cassion rigs show up.
Reply With Quote
     
     
  #11  
Old Posted Aug 10, 2015, 4:34 AM
Tom In Chicago's Avatar
Tom In Chicago Tom In Chicago is offline
Moderator
 
Join Date: Jul 2001
Location: Sick City
Posts: 7,369
Hilton Garden Inn is completed and open for business. . .

. . .
__________________
Tom in Chicago
. . .
Near the day of Purification, there will be cobwebs spun back and forth in the sky.
Reply With Quote
     
     
  #12  
Old Posted Aug 10, 2015, 2:44 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Near New City - 8/4

The name of this one always escapes me.
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #13  
Old Posted Aug 10, 2015, 2:49 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,319
^^It's The 'Xavier.'

Also, status updates for 750 Hudson and the Hilton Garden Inn. Additionally, does anyone know if New City is done, or pretty close to done?
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #14  
Old Posted Aug 10, 2015, 3:03 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
108 N Jefferson 7/28





__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
  #15  
Old Posted Aug 10, 2015, 3:11 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,457
Quote:
Originally Posted by sentinel View Post
^^It's The 'Xavier.'

Also, status updates for 750 Hudson and the Hilton Garden Inn. Additionally, does anyone know if New City is done, or pretty close to done?
From above re: 750 N Hudson:

Quote:
Originally Posted by LouisVanDerWright View Post
Also, answered my own question earlier, 750 N Hudson is in site prep with three excavators ripping up the parking lot. I imagine it is only a matter of weeks before the cassion rigs show up.
Reply With Quote
     
     
  #16  
Old Posted Aug 10, 2015, 3:16 PM
munchymunch's Avatar
munchymunch munchymunch is offline
MPLSXCHI
 
Join Date: Feb 2014
Location: Omicron Persei 8
Posts: 1,094
Can we include RUMORED projects like 1000 s state, and the SAIC tower? Also can you add River South.

Thanks for the new thread.
__________________
"I don't want to be interesting. I want to be good." -Ludwig Mies van der Rohe
Reply With Quote
     
     
  #17  
Old Posted Aug 10, 2015, 4:11 PM
Jibba's Avatar
Jibba Jibba is offline
Registered User
 
Join Date: Mar 2008
Location: Chicago
Posts: 2,940
Looks great sentinel.

FYI, rendering for 61 Erie is incorrect (the drawing for 162 W Superior is shown for its entry).
Reply With Quote
     
     
  #18  
Old Posted Aug 10, 2015, 5:03 PM
LouisVanDerWright LouisVanDerWright is offline
Registered User
 
Join Date: Jul 2012
Posts: 7,457
I guess 905 N Orleans was approved by the city:



http://www.chicagoarchitecture.org/2...-goes-bye-bye/

I think that needs to be added to the proposals list.
Reply With Quote
     
     
  #19  
Old Posted Aug 10, 2015, 5:51 PM
sentinel's Avatar
sentinel sentinel is offline
Plenary pleasures.
 
Join Date: Oct 2004
Location: Monterey CA
Posts: 4,319
^^^I saw that, but are we sure this one is different from 915 N Orleans, for which we already have an entry? Or is it the same project with an address snafu and a slightly modified design? Hmmmmm...


Also, thanks for the note Jibba. Will update soon...
__________________
Don't be shy. Step into the light.
Reply With Quote
     
     
  #20  
Old Posted Aug 10, 2015, 6:05 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
200 N Mich - getting close to the top


7/21


7/22


8/04


8/07
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 8:21 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.