Hi,
There is a building called "The Duke" that is shown as U/C in the Montreal diagram. The design as shown by the diagram is one of a project which has not been heard of for more than a year. There was probably confusion with another project called "Le Duke" on the same street which has been U/C for a while.
Also, the project (of which I am currently making the diagram) called "2025 Peel" is now U/C instead of proposed.
For reference, I am now talking about these two projects: