Quote:
Originally Posted by Zapatan
I hope it gets built, I would imagine yes since so many condos are sold
|
That is correct. Site prep is just taking a while but it will rise. We just have to be patient. Along with all the other near-supertalls currently in prep mode or just about to start prep mode. Many with excellent pre-sale achievements.
Quote:
Originally Posted by BrickellBased
Caisson rigs are on site. I can take a picture if I get back over there at some point.
|
Great news!
Quote:
Originally Posted by Zapatan
Me too, as it's in the U/C section.
If the condos are sold there's no reason not to build it right?
|
Similar situation to Okan tower. Just taking a little bit longer on the prep side. But its nothing new to Miami. As an example, the Halo in Newark NJ took forever to get the site prep done and now is rising. So patience!
Walford also has a pre-construction loan along with other financing measures secured. More optimism on that end.