Quote:
Originally Posted by gebs
Crane assembly beginning at 717 S Clark.
|
Quote:
Originally Posted by Jim in Chicago
That didn't take long. The pile driving ended on Saturday (PTL) and that crane was still in place this morning, along with all the stuff they needed to clean up from the piling work. They're moving on this one!
|
I think gebs' report was premature. The pile company is still on site this morning finishing up and cleaning out, the only crane I see is the one they were using. I See no sign of a new crane being assembled. I'm sure it will come soon, however.