HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


1000M in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Chicago Skyscraper Diagram

Map Location
Chicago Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 4, 2020, 7:53 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,989
Quote:
Originally Posted by bhawk66 View Post
If the crushed rock is not an indication of a restart, then how would one explain the following comments from the article linked above?

"...compared to the shut down picture we showed you in July, some dirt has been dug, some equipment has been moved, and there’s some new heavy equipment on site that wasn’t there before, including an excavator.

In the new picture, we count 26 rebar cages for the caissons. In the old picture, the number was closer to 20."
I love the optimism - but no - the sleeves had been trimmed down to what will be the bottom of the mat. The next step is to put in the "mud" layer (just done at SalesForce tower) . there is no reason to put gravel in on this level unless you are planning on burying it for a while. ( I hope I am wrong ).
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 1:35 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.