Welcome to the forums!
No new news on the construction front, but this really isn’t worrisome. The piling were driven to assess bedrock depth and stability. This information will be used to determine building height, but, all indications seem to be that the developer intends on a 30 storey building.
I hope for excavators on site by this summer.