Quote:
Originally Posted by goodlookin'
"Everyone seems to be quoting the Ritz at 213m high"
Like who?
Skyscraperpage - 208.4m
Urbantoronto - 684ft; 208.5m
Canuck's 400+ list - 684ft; 208.5m
Emporis - no height recorded
Ontario Municipal Board - 208.4m
often wrong Urbandb - 213m
"And Ritz has apparently started construction with RBC so why has the RBC status been changed to under construction but not the Ritz?"
nothing substantial so far to indicate 'construction' (well .. site prep but hey)has begun. And, I've also never noticed the wall of concrete barriers between the two sites before
|
thanx, i didnt mention that i meant everyone on skyscrapercity...but then thats like saying everyone on wikipedia..so reliable lol. They are also quoting BA as being 217...where do these numbers come from lol.
"nothing substantial so far to indicate 'construction' (well .. site prep but hey)has begun. And, I've also never noticed the wall of concrete barriers between the two sites before"
you could say the same for RBC could you not...i mean if they are starting at the same time..and site preping at the same time...then it only seems logical to change the status of both towers at the same time. thats my thinking anyway.