Quote:
Originally Posted by jayden
Oh wow yeah that looks weird.
That entire portion of the site is weird to me. There was no below ground foundational work just the columns and the core in the middle. This is where the residential tower will be built right?
|
Is this the crane you all are referencing? Looks like the existing residential tower crane might be limited on its reach range because of the existing buildings so they are adding a 4th one for coverage?
This portion of the site doesn't seem weird. Looks like there will be a service level that connects all the buildings that's mostly below grade - which is what you're seeing constructed right now. Most of the residential parking is above grade otherwise. The new Arts Center Way extension will run on top of what looks to be the service/parking level below grade closer to the north side of the site.