Quote:
Originally Posted by City Wide
As I was driving by today the first load of steel beams was being dropped off. I'm guessing by the end of the week the frame might well be above ground level.
|
Probably not. That first load is probably the beams and joists for the first floor deck, which may take a bit of time to install. They have to build that first floor deck before starting the walls.