HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


    Baylor St. Luke's Medical Center Expansion in the SkyscraperPage Database

Building Data Page   • Houston Skyscraper Diagram

Map Location
Houston Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Dec 17, 2015, 4:14 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: 360, St. Edwards
Posts: 12,383
Lightbulb HOUSTON | Baylor St. Luke's Medical Center | 210 FT | 21 FLOORS

Developer:
Architect: HKS
Type: Institutional, Office
Location: Old Spanish Trail, Texas Medical Center
Construction Timeline: Jan. 2016 Start Date - 2019 Completion



http://www.bizjournals.com/houston/m...aylor-chi.html

Quote:
Originally Posted by HBJ
Exclusive: Expansion plans revealed for Baylor, CHI St. Luke's McNair campus

The Baylor College of Medicine and CHI St. Luke's Health plan to break ground on the next phase of their McNair Campus in early 2016.

The next phase of the campus will feature a second patient tower that will house 420 beds, and a medical office building. The patient tower is expected to begin construction in January, and the medical office building will begin in the fall. The projects are expected to be completed by 2019, according to a statement.
__________________
HAIF

Last edited by Urbannizer; Dec 18, 2015 at 1:26 AM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 10:39 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.