Normally at this time I would say "All photos taken by me today" and post a few photos from the exact same spot as previous weeks.
Unfortunately my computer decided to crash and destroy its hardware last night so the computer I am on right now is an older computer that does not like my photos and doesn't like photo upload sights either so I will post the photos later in the week once I have a brand new laptop to play around with. So in lieu of visual photos I will just provide this;
Ecole Secondaire is coming along nicely with most of the frame up and with the base in for the part that extends towards the road. Blasting is occuring on Larry Uteck in order to clear the future sites of condominium/apartment buildings. And the houses under construction on Southgate Drive between LU and Ravines Dr are well under way with work taking place on Saturdays now.
Quote:
Originally Posted by Keith P.
Even brand-new roads here are patched and cut up! Why can this town not build a decently-surfaced street?
|
When I was back up in the area today I took a close look and well theres a reason the road looks so patchy.
In reality the road is actually very smooth but the reason it's still not perfect is because they have not put on the final layer of asphalt. Theres about an inch or so between the current asphalt level and the curb/manhole level which I imagine they will fill in later on after the heavy construction vehicles stop using the road so much.