HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Feb 17, 2016, 3:43 PM
TheGreenBastard's Avatar
TheGreenBastard TheGreenBastard is offline
Registered User
 
Join Date: Nov 2015
Location: Halifax/Toronto
Posts: 177
Smile [Halifax] Scotia Square Redevelopment | Completed

Reply With Quote
     
     
  #2  
Old Posted Feb 21, 2016, 3:12 PM
Jringe01's Avatar
Jringe01 Jringe01 is offline
Registered User
 
Join Date: Feb 2009
Location: Montreal
Posts: 175
Details? Pics? Renderings?
Reply With Quote
     
     
  #3  
Old Posted Feb 21, 2016, 3:38 PM
q12's Avatar
q12 q12 is offline
Registered User
 
Join Date: Mar 2008
Location: Halifax
Posts: 4,526
Reply With Quote
     
     
  #4  
Old Posted Feb 21, 2016, 3:54 PM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
So long as there is *something* there for the public to kick around in from the cold, rather than standing outside waiting for buses.
Reply With Quote
     
     
  #5  
Old Posted Feb 21, 2016, 9:24 PM
Colin May Colin May is offline
Registered User
 
Join Date: Mar 2014
Posts: 1,487
Quote:
Originally Posted by counterfactual View Post
So long as there is *something* there for the public to kick around in from the cold, rather than standing outside waiting for buses.
No benches ? No planters ?
Reply With Quote
     
     
  #6  
Old Posted Feb 22, 2016, 1:31 AM
TheGreenBastard's Avatar
TheGreenBastard TheGreenBastard is offline
Registered User
 
Join Date: Nov 2015
Location: Halifax/Toronto
Posts: 177
In that second rendering...is that supposed to be Duke Tower?
Reply With Quote
     
     
  #7  
Old Posted Feb 22, 2016, 2:31 AM
counterfactual counterfactual is offline
Registered User
 
Join Date: Jul 2013
Location: Parts Unknown
Posts: 1,796
Quote:
Originally Posted by Colin May View Post
No benches ? No planters ?
I'll take benches and planters too.

But right now, waiting for the bus there in winter is the worst thing ever.
Reply With Quote
     
     
  #8  
Old Posted Feb 22, 2016, 11:03 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
Quote:
Originally Posted by TheGreenBastard View Post
In that second rendering...is that supposed to be Duke Tower?
It should be Barrington Tower since it would be approximately from this Google Street View perspective - https://www.google.ca/maps/@44.65075...7i13312!8i6656

There are drawings and more renderings in this document - http://www.halifax.ca/boardscom/drc/...1130411drc.pdf
Reply With Quote
     
     
  #9  
Old Posted Feb 22, 2016, 4:04 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
We should also include Westhill on Duke in this thread.

http://www.halifaxdevelopments.com/westhill-on-duke.php



Not sure if they have found any potential tenants yet, but the space below this has been cleared out and gutted. I wonder if they are doing prep work for this addition.
Reply With Quote
     
     
  #10  
Old Posted Feb 25, 2016, 4:36 AM
fenwick16 fenwick16 is offline
Honored Member
 
Join Date: Feb 2007
Location: Toronto area (ex-Nova Scotian)
Posts: 5,558
This was posted previously in a different thread, but this is a good place to re-post it.

(source: http://www.halifaxdevelopments.com/i...-portfolio.pdf)
Reply With Quote
     
     
  #11  
Old Posted Feb 25, 2016, 11:44 AM
kph06's Avatar
kph06 kph06 is online now
Registered User
 
Join Date: Dec 2006
Posts: 2,025
I saw crews doing bore holes by the trade mart Tuesday. Not a definite sign something is on the horizon, but at least is shows preliminary data is being assembled.
Reply With Quote
     
     
  #12  
Old Posted Feb 25, 2016, 10:10 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
Quote:
Originally Posted by kph06 View Post
I saw crews doing bore holes by the trade mart Tuesday. Not a definite sign something is on the horizon, but at least is shows preliminary data is being assembled.
How did I miss that?! My apartment looks over that site?!
Reply With Quote
     
     
  #13  
Old Posted Feb 25, 2016, 10:56 PM
kph06's Avatar
kph06 kph06 is online now
Registered User
 
Join Date: Dec 2006
Posts: 2,025
Quote:
Originally Posted by Jonovision View Post
How did I miss that?! My apartment looks over that site?!
Now that I look at google maps I am slightly wrong, it was between the apartment building and the auto shop on Barrington.
Reply With Quote
     
     
  #14  
Old Posted Feb 27, 2016, 8:11 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
Quote:
Originally Posted by kph06 View Post
Now that I look at google maps I am slightly wrong, it was between the apartment building and the auto shop on Barrington.
It could have to do with tearing down Cogswell.
Reply With Quote
     
     
  #15  
Old Posted Feb 28, 2016, 6:44 AM
curnhalio's Avatar
curnhalio curnhalio is offline
Registered User
 
Join Date: May 2013
Posts: 314
Quote:
Originally Posted by Jonovision View Post
It could have to do with tearing down Cogswell.
Heard a rumour about the first phase of the knockdown starting later this year. This article from December doesn't give that much hope for a 2016 construction start.

http://www.metronews.ca/news/halifax...g-forward.html

'It's exciting:' Halifax's Cogswell Interchange redevelopment project inching forward

By: Zane Woodford Metro Published on Thu Dec 17 2015

The long awaited Cogswell Interchange redevelopment project is getting closer to becoming a reality.
At the city’s Community Planning and Economic Development Standing Committee meeting on Thursday, city staff gave a presentation outlining the plan for the redevelopment of the unpopular downtown Halifax interchange.
Reply With Quote
     
     
  #16  
Old Posted Mar 1, 2016, 3:24 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
The Metro did a cull insert yesterday about the future of Halifax and all the construction. One of the articles was about Cogswell and said the RFP was out to hire the surveyors and designers. The design phase is to take 12-14 months with demolition beginning fall 2017.
Reply With Quote
     
     
  #17  
Old Posted Apr 5, 2016, 3:24 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
Work is progressing at a good pace. The first above ground structures are taking shape.

Reply With Quote
     
     
  #18  
Old Posted May 17, 2016, 5:53 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
Steel work is now well underway.

20160516_164012 by Jonovision23, on Flickr

20160516_163943 by Jonovision23, on Flickr

20160516_163918_HDR by Jonovision23, on Flickr
Reply With Quote
     
     
  #19  
Old Posted Jun 1, 2016, 2:50 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
Reply With Quote
     
     
  #20  
Old Posted Jun 8, 2016, 9:05 PM
Jonovision's Avatar
Jonovision Jonovision is offline
Registered User
 
Join Date: Sep 2003
Posts: 5,004
I think most of the basic steelwork is now assembled. Just one small bit left.

20160608_141720_HDR by Jonovision23, on Flickr

20160608_141747_HDR by Jonovision23, on Flickr

20160608_141847_HDR by Jonovision23, on Flickr
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces > Halifax > Halifax Peninsula & Downtown Dartmouth
Forum Jump



Forum Jump


All times are GMT. The time now is 10:52 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.