Most of the 32nd floor windows and balcony doors now installed. They have removed the concrete base for the tower crane which has opened up space along the Richmond St side.
The concrete base has been poured for path to the parking garage on west side. Courtyard space still needs alot of work. Finishing top floors exterior trim is still ongoing.
The exterior construction elevator was removed this weekend. Finishing the top floor exteriors and balconies continues. The strip where the construction elevator was can now be finished with the balcony doors and railings now. Rooftop element work is still underway as is the courtyard between the parking garage and building.
Caught red handed. As if they didn't know people would notice the similarities. It must be a bit embarrassing for both SRM & Old Oak. They could have had a similar building & make changes so to not make it look like a mini replica.
haha. caught.
maybe both were inspired by a game of Jenga.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
I just moved into this building (it's address is actually 517). Haven't heard anything about that but I could see it happening. They are still working on the common hallways.