Crane components for sure. I'll count pieces in the morning.
This project is 5 stories building with underground parking. Commercial on bottom floors and apartment above floors. The pieces of the crane is onsite.
Definitely tower crane components (I had to take a drive out to Shediac to confirm).
This means that shortly, there will be two tower cranes operating concurrently in Shediac. I can assure you that such a situation has never happened before.
Definitely tower crane components (I had to take a drive out to Shediac to confirm).
This means that shortly, there will be two tower cranes operating concurrently in Shediac. I can assure you that such a situation has never happened before.
There were multiple cranes working this summer with the multiple apartment complexes under construction in Shediac., most of which were the smaller mobile ones,
There were multiple cranes working this summer with the multiple apartment complexes under construction in Shediac., most of which were the smaller mobile ones,
Tower crane (real one ) being erected today for the project on Main St.
Place Central 353 Main St Summer 2024
As per new image looks more the front of the building.
after all. Outdoor seating area on left Maybe St Louis restaurant. Not fan of the front railing facing main st.