Old Posted Apr 12, 2024, 3:15 PM
darkharbour darkharbour is offline
Registered User
 
Join Date: Jan 2021
Posts: 366
It is the new Harbour Passage extension, that has been well documented and was a separate tender issued by the City from the Ihtoli-maqahamok work. The paving took place in the Fall and it will be coated in the classic Cranberry colour to match the rest of the trail some time this Spring.

It looks great, I love the amphitheaters and seating options, much more contemporary than the older parts of the trail.
Reply With Quote
     
     
  #982  
Old Posted Apr 12, 2024, 3:39 PM
Pugsley Pugsley is offline
Registered User
 
Join Date: Feb 2009
Posts: 372
Quote:
Originally Posted by darkharbour View Post
It is the new Harbour Passage extension, that has been well documented and was a separate tender issued by the City from the Ihtoli-maqahamok work. The paving took place in the Fall and it will be coated in the classic Cranberry colour to match the rest of the trail some time this Spring.

It looks great, I love the amphitheaters and seating options, much more contemporary than the older parts of the trail.
Ah. OK.

I knew there was going to be an extension...I guess I assumed it would follow the same progress as the site as it was being developed.

Great to see it being done prior so tourists and locals can get the most of the waterfront while it progresses! Amazing!
Reply With Quote
     
     
  #983  
Old Posted Apr 15, 2024, 11:41 AM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 1,245
Work has resumed. Crews and two excavators are on site digging today where the the south-west building will be.


Reply With Quote
     
     
  #984  
Old Posted Apr 15, 2024, 12:46 PM
sailor734 sailor734 is offline
Registered User
 
Join Date: Apr 2023
Posts: 737
Nice to see. Can't wait for there to be a line of cement trucks and pumpers working!
Reply With Quote
     
     
  #985  
Old Posted Apr 17, 2024, 3:00 PM
Itme Itme is offline
Registered User
 
Join Date: Jul 2022
Posts: 36
I see there is now an Iron Maple sign up beside the Fundy harbour Group one. I didn’t realize they were going to sub out the construction. Iron maple knows what they are doing this makes me more confident in the finished product.
Reply With Quote
     
     
  #986  
Old Posted Apr 17, 2024, 10:09 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 1,585
Yes they are building the Cunard Block on Halifax harbourfront.
Reply With Quote
     
     
  #987  
Old Posted Apr 18, 2024, 4:54 PM
sailor734 sailor734 is offline
Registered User
 
Join Date: Apr 2023
Posts: 737
Quote:
Originally Posted by Itme View Post
I see there is now an Iron Maple sign up beside the Fundy harbour Group one. I didn’t realize they were going to sub out the construction. Iron maple knows what they are doing this makes me more confident in the finished product.
That's positive news.
Reply With Quote
     
     
  #988  
Old Posted Apr 25, 2024, 4:01 PM
Sabien Sabien is offline
Registered User
 
Join Date: Jun 2008
Location: Saint John, NB
Posts: 116
Judging by the number of porta-potties being delivered to the site, I'd say things are just about to start flowing! (I mean construction)
Reply With Quote
     
     
  #989  
Old Posted May 6, 2024, 3:26 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 1,245
Found a listing for leasing of the commercial spaces. 13,000 - 33,500 square feet of retail space available. One says available November 2025, the other says November 2027.



https://www.loopnet.com/Listing/35-W...n-NB/31489390/

Also these drawings were included. The public community/cultural/commercial entertainment spaces will now be integrated into the NW building, instead of being it's own building.










And there is an updated rendering of the South East building, (now with the South West building next to it):


Last edited by DyAm00394; May 6, 2024 at 5:59 PM.
Reply With Quote
     
     
  #990  
Old Posted May 6, 2024, 6:12 PM
homebody homebody is offline
Registered User
 
Join Date: Sep 2007
Location: Saint John, N.B.
Posts: 241
Quote:
Originally Posted by DyAm00394 View Post
Found a listing for leasing of the commercial spaces. 13,000 - 33,500 square feet of retail space available. One says available November 2025, the other says November 2027.



https://www.loopnet.com/Listing/35-W...n-NB/31489390/

Also these drawings were included. The public community/cultural/commercial entertainment spaces will now be integrated into the NW building, instead of being it's own building.










And there is an updated rendering of the South East building, (now with the South West building next to it):


Was the nw building always supposed to be a hotel? Or is that something new as well?
Reply With Quote
     
     
  #991  
Old Posted May 6, 2024, 6:30 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 1,245
Quote:
Originally Posted by homebody View Post
Was the nw building always supposed to be a hotel? Or is that something new as well?
Nope, was always labeled as "Hospitality/Accommodation". But the word "hotel" wasn't written on the plans before though.
Reply With Quote
     
     
  #992  
Old Posted May 7, 2024, 1:19 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 1,245
A new 2nd construction trailer was delivered to the site this morning.

Reply With Quote
     
     
  #993  
Old Posted May 9, 2024, 11:44 AM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 1,245
Now a 3rd construction trailer is being delivered this morning.

Reply With Quote
     
     
  #994  
Old Posted May 9, 2024, 11:50 AM
EnvisionSaintJohn's Avatar
EnvisionSaintJohn EnvisionSaintJohn is offline
Registered User
 
Join Date: Apr 2023
Posts: 107
When do we think Saint John will build something higher than 20
storeys?

Who’s got an idea/plan to make it happen?
Reply With Quote
     
     
  #995  
Old Posted May 9, 2024, 12:33 PM
jonny golden jonny golden is offline
Registered User
 
Join Date: May 2019
Posts: 2,250
Quote:
Originally Posted by EnvisionSaintJohn View Post
When do we think Saint John will build something higher than 20
storeys?

Who’s got an idea/plan to make it happen?
What about 91 King Street? I think his original plan was 12, but would 20 floors be possible there?
Reply With Quote
     
     
  #996  
Old Posted May 9, 2024, 2:01 PM
sailor734 sailor734 is offline
Registered User
 
Join Date: Apr 2023
Posts: 737
Quote:
Originally Posted by jonny golden View Post
What about 91 King Street? I think his original plan was 12, but would 20 floors be possible there?
Anything is possible but if the developer is struggling to make 12 stories financially viable I'm not sure 20 is likely.

It sure would stand out on top of the hill though....
Reply With Quote
     
     
  #997  
Old Posted May 9, 2024, 4:55 PM
cdnguys cdnguys is offline
Registered User
 
Join Date: Sep 2010
Posts: 1,585
Quote:
Originally Posted by EnvisionSaintJohn View Post
When do we think Saint John will build something higher than 20
storeys?

Who’s got an idea/plan to make it happen?
Down where the former SJ energy substation / SJ parking lot. I could see something like Halifax’s Maple building there
Reply With Quote
     
     
  #998  
Old Posted May 9, 2024, 5:57 PM
DyAm00394 DyAm00394 is offline
Registered User
 
Join Date: Sep 2017
Location: Saint John, N.B
Posts: 1,245
An update look of the work happening on site this afternoon. Looks like concrete pouring is starting.

Reply With Quote
     
     
  #999  
Old Posted May 9, 2024, 10:37 PM
Helladog's Avatar
Helladog Helladog is offline
Unregistered Loser
 
Join Date: Jul 2007
Location: NB
Posts: 1,348
Quote:
Originally Posted by EnvisionSaintJohn View Post
When do we think Saint John will build something higher than 20
storeys?

Who’s got an idea/plan to make it happen?
Since office space isn't in need right now, unless a major company moved to SJ, it prolly wouldn't be a commercial building. I've heard Cooke could use some facilities, but to make any new building 20 stories, would prolly have to have a major residential component.

So that leaves residential. I doubt the Fundy Quay 19-storey building will have floors added, but who knows...If the demand is there, anything is possible.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 5:27 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.