Quote:
Originally Posted by bomberjet
Well since there's nothing official coming out today. Excavation work continues along the north edge of the site. Working there way along from east to west. Piling work for shoring continuing along the east sidewalk. Looks like they're almost to the church now (south property line). So shoring piling complete along the north, east and some of the west edge of site.
The construction fencing looks to be snazzied up as well. They've got the blue wrap all the way around the site now. PCL has big white flags on top of the two storey tall wooden posts they've built. Wasn't quite sure what those were for earlier.
|
PCL did the same thing with the custom vinyl fence wrap when they were going to work on the now abandoned hotel project at Portage and Main.
I have the overnight shift for the next little bit and with them killing the power to the 3 remaining parking lot lights its hard to really see what is going on with the excavation now.
I wonder if PCL was maybe tying to dress up the project and tie into the theme of entering the portals in the arena with the tall gate number signs as they have all the standard gate signs/ warning signs etc at street level.