Old Posted Oct 30, 2022, 6:45 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Looks like they may have started installing some of the 8th floor slabs.
Reply With Quote
     
     
  #62  
Old Posted Oct 31, 2022, 5:39 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 44,932
SSSLLLLLLLLLLLOOOOOOOWWWW construction. The base does not really look conducive to retail.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
Reply With Quote
     
     
  #63  
Old Posted Nov 2, 2022, 1:14 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
It looks like the north end of building will only be 7 floors high while the south end will be the 8 floors now. They have also started on exterior brick stone work on the west side of building now. They have been landing the precast roof slabs on the north end of building now effectively completing that end.
Reply With Quote
     
     
  #64  
Old Posted Nov 2, 2022, 4:18 PM
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 693
Quote:
Originally Posted by jammer139 View Post
It looks like the north end of building will only be 7 floors high while the south end will be the 8 floors now.
Looks like you're right. Here is a rendering from the website, looking NW from Hyde Park and Gainsborough

www.hydeparkvillageapartments.ca

Reply With Quote
     
     
  #65  
Old Posted Nov 12, 2022, 4:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Masonry contractor is back to start building the 8th floor walls in concrete block on the south end. Still have sections of the 8th floor yet to install the 8th floor concrete slabs.
Reply With Quote
     
     
  #66  
Old Posted Dec 16, 2022, 8:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Progress has pretty much stalled out in completing the 8th floor concrete block walls and prefab steel wall installs. Still alot of work left to complete the 8th floor and install the roof. Have noticed they are advertising this will be ready by the Spring but that would likely be June just prior to rolling into Summer.
Reply With Quote
     
     
  #67  
Old Posted Dec 21, 2022, 6:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Mobile crane onsite installing the 8th floor roof slabs.
Reply With Quote
     
     
  #68  
Old Posted Jan 19, 2023, 7:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
The 8th floor roof slabs are now installed and have built the mechanical penthouse. This is now topped out. They have installed the exterior brick on the west side for the podium base now as well. Alot of exterior work left and interior finishing yet to complete. No signs that any of the tenants in the plaza to the north have vacated. This is where the north building is planned to be built.
Reply With Quote
     
     
  #69  
Old Posted Mar 12, 2023, 3:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Very little progress on the mechanical penthouse so far. A little more of the exterior stone and brick has been installed on the NE side podium base.
Reply With Quote
     
     
  #70  
Old Posted Apr 2, 2023, 3:00 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Still working on the podium base exterior brick and stone installation on the SE corner.
Reply With Quote
     
     
  #71  
Old Posted Apr 3, 2023, 5:34 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 44,932
sssssllllooooowwww build. rather like the 6 story build on Coronation, and the slab going up on S. Carriage Rd.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
Reply With Quote
     
     
  #72  
Old Posted May 14, 2023, 8:45 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Contractors were working today on a Sunday applying stucco to the exterior walls. The masonry contractor has completed the podium 2 story base brick and stone installs now.
Reply With Quote
     
     
  #73  
Old Posted May 21, 2023, 3:16 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Interesting they have started on the concrete curbing and planters that front Hyde Park and Gainsborough. Still alot of exterior finishing left to complete.
Reply With Quote
     
     
  #74  
Old Posted Jul 23, 2023, 5:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Still applying the exterior stucco finishing along the SW corner of this building.
Reply With Quote
     
     
  #75  
Old Posted Aug 20, 2023, 9:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Still applying the exterior stucco finish on this building. Appear to still have alot of interior drywall and painting left as well. Another really slow build on this relatively small 8s building.



No signs that any of the tenants in the plaza immediately north are leaving as the plaza will need to be demolished for the second building to be built. Would not be surprised this developer waits a few years before starting building 2.
Reply With Quote
     
     
  #76  
Old Posted Oct 26, 2023, 1:43 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
They still have not finished the sidewalk planters around the perimeter of this building as of yet and still have fencing around it. They appear to still be working on the interiors as well. Don't think they have even got any tenants as of yet. This was a brutally slow build for some reason.
Reply With Quote
     
     
  #77  
Old Posted Nov 15, 2023, 4:24 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
They finally paved the west side parking lot. Still no progress on finishing the sidewalk surrounding the south and east side of the building. Exterior finishing work still happening around the balconies. The commercial plaza to the north where tower 2 is supposed to be built still has tenants and appears to be leasing for new tenants. I'd be surprised if tower 2 is built any time soon.
Reply With Quote
     
     
  #78  
Old Posted Nov 15, 2023, 6:38 PM
MolsonExport's Avatar
MolsonExport MolsonExport is offline
The Vomit Bag.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 44,932
Maybe they will wait until the old house on site has conveniently rotted away.
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell)
Reply With Quote
     
     
  #79  
Old Posted Nov 22, 2023, 4:22 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Paving stone contractor now on site installing paving stones for the sidewalk and walk ways around the base. Why they didn't start this months ago when the weather was so much better is really strange.
Reply With Quote
     
     
  #80  
Old Posted Dec 12, 2023, 7:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,802
Looks like they decided to pour concrete for the sidewalk area on the east side and they installed grass on sections of the south side. Appear to still be working on the interior fit out with a kitchen and bath company truck parked onsite. Don't think any tenants have moved in as of yet but could be close now. Zero signs that they intend to start phase two and build the north tower with the retail plaza still occupied with tenants.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 6:27 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.