Quote:
Originally Posted by edwards
325 Fremont
On the lot, there is a tombstone with a April 19, 2016 groundbreaking date engraved into it.
Anyone know when actual construction will start?
|
As I said before, the building permit process is two steps. First is the so-called "site permit", which is pretty general, then there are the "addenda", which get into the detail. The site permit was filed 5/4/16 and approved 3/14/17. As of now, all the addenda are on hold.