Bank Street

I've posted previously in Roads/Bridges projects/issues but I decided Bank Street deserved a thread of its own.

There's a crane out today putting the hideous plastic cap "hats" on the hideous tacky plastic sidewalk-blocking Bank Street advertising signs.

Reply With Quote
     
     
  #2  
Old Posted Dec 5, 2009, 3:31 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
Ian Capstick: Bank Street banner fiasco - November 30, 2009
Reply With Quote
     
     
  #3  
Old Posted Dec 5, 2009, 3:32 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
via Spacing Ottawa - Urbsite: Bank Street... Then and Now - December 3, 2009
Reply With Quote
     
     
  #4  
Old Posted Dec 5, 2009, 3:38 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
large bike racks

I thought the large bike racks were only going to be on the side street cutouts, but there are two in front of the Quickie Mart. Here's one




Here are a couple more shots of other ones on cut outs.



Reply With Quote
     
     
  #5  
Old Posted Dec 5, 2009, 9:23 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,808
Quote:
Originally Posted by rakerman View Post
I've posted previously in Roads/Bridges projects/issues but I decided Bank Street deserved a thread of its own.

There's a crane out today putting the hideous plastic cap "hats" on the hideous tacky plastic sidewalk-blocking Bank Street advertising signs.

They put those ugly things back...wtf are they thinking!
Reply With Quote
     
     
  #6  
Old Posted Dec 5, 2009, 9:25 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
Quote:
Originally Posted by c_speed3108 View Post
They put those ugly things back...wtf are they thinking!
They earn money for the Bank Street Improvement Association or whatever, but honestly as someone who lives in the area I would pay them NOT to have the horrible tacky things. Plus which, by the time you add up the expense of having the street specifically wired for them, plus uninstalling and reinstalling them, plus maintaining them, plus they are in your way and make the street look cheap, I'm not sure it's worth it. (I dunno who eats the costs for the install - the city? the advertising company? the Bank Street merchants?)
Reply With Quote
     
     
  #7  
Old Posted Dec 5, 2009, 9:27 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,244
Images of Centretown also has a series on Bank Street
http://centretown.blogspot.com/2009/...nd-part-1.html
Reply With Quote
     
     
  #8  
Old Posted Mar 21, 2010, 3:12 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
street art bike racks

I heard a rumour that the street art bike racks were all rusting so they were taken down and the contractor has to completely replace them all.
Reply With Quote
     
     
  #9  
Old Posted Apr 25, 2010, 4:18 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
street furniture

The furniture is back after a winter vacation.

Reply With Quote
     
     
  #10  
Old Posted Apr 25, 2010, 8:38 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,109
I noticed a lot of the newly transplanted trees from last summer/fall all along Bank Street (including the ones on Mondrian's 6th floor terrace) are struggling to get going while trees all over Centretown are completely green. Is this normal for the first year after transplantation? I wonder if the trees are dead or are they just lazy? I guess time will tell.
Reply With Quote
     
     
  #11  
Old Posted Apr 25, 2010, 11:11 PM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 23,612
Quote:
Originally Posted by O-Town Hockey View Post
I noticed a lot of the newly transplanted trees from last summer/fall all along Bank Street (including the ones on Mondrian's 6th floor terrace) are struggling to get going while trees all over Centretown are completely green. Is this normal for the first year after transplantation? I wonder if the trees are dead or are they just lazy? I guess time will tell.
A few casualties are to be expected, but newly transplanted trees often take a bit longer to show leaves than established trees.
Reply With Quote
     
     
  #12  
Old Posted Jun 4, 2010, 2:37 AM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
paving

Reply With Quote
     
     
  #13  
Old Posted Jun 4, 2010, 4:39 AM
rodionx rodionx is offline
Registered User
 
Join Date: Jun 2007
Location: Centretown
Posts: 283
Didn't they just pave Bank last year when they redid the whole street between Somerset and the Queensway? Odd. They've been working on Lyon as well, which really does need it.

As for the tree question above, the city has a tree guy you can talk to if you want further details. I consulted him a couple of years ago when I was planning to plant a tree in my front yard, and wanted to know what could put up with road salt and all the other nasty stuff downtown trees put up with. His title might have been chief arborist or something like that. Nice guy. Knows his street trees.
Reply With Quote
     
     
  #14  
Old Posted Jun 4, 2010, 1:36 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,109
Quote:
Originally Posted by rodionx View Post
Didn't they just pave Bank last year when they redid the whole street between Somerset and the Queensway? Odd. They've been working on Lyon as well, which really does need it.

As for the tree question above, the city has a tree guy you can talk to if you want further details. I consulted him a couple of years ago when I was planning to plant a tree in my front yard, and wanted to know what could put up with road salt and all the other nasty stuff downtown trees put up with. His title might have been chief arborist or something like that. Nice guy. Knows his street trees.
They did pave from Somerset to the 417 last year but, just like they did North of Somerset, they left the last layer of asphault for the next year. I think that is a way to let things settle before the final 'coat' possibly?
Reply With Quote
     
     
  #15  
Old Posted Jun 6, 2010, 2:24 AM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,290
If they were smart, they would have more roadways that are a hybrid composite of concrete, asphalt, and either rubber or fibreglass. This is a lot less prone to the effects of frost, and hold up better to heavy vehicles driving over it a lot longer.

I was thinking of this, as far too often, I see asphault get laid too thinly...
Reply With Quote
     
     
  #16  
Old Posted Jun 6, 2010, 4:38 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Well they could add asbestos to the asphalt, since the fibres will give the asphalt the properties needed to counter freeze-thaw cycles...
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #17  
Old Posted Jun 7, 2010, 1:48 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 1,952
Quote:
Originally Posted by Davis137 View Post
If they were smart, they would have more roadways that are a hybrid composite of concrete, asphalt, and either rubber or fibreglass. This is a lot less prone to the effects of frost, and hold up better to heavy vehicles driving over it a lot longer.

I was thinking of this, as far too often, I see asphault get laid too thinly...
It seems to me that it is not so much the thickness of the asphalt but rather how it is laid that causes most of the problems. Indeed, asphalt, if of the right composition and applied correctly, can be laid in quite a thin layer. It appears that a lot of the asphalt is being 'stretched' too much, causing small cracks; which of course become larger cracks which in short order result in chunks of the overlay breaking out. Alas, 'stretching' the asphalt means less material used for maximized profit for the contractor so the practice is likely to continue until the City actually starts to make the contractor responsible for the finished product's durability. Contractors would rather do the job right once than have to come back and replace a bad job at their own cost.
Reply With Quote
     
     
  #18  
Old Posted Jun 7, 2010, 3:40 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 8,034
Quote:
Originally Posted by Dado View Post
Well they could add asbestos to the asphalt, since the fibres will give the asphalt the properties needed to counter freeze-thaw cycles...
We want MORE asbestos!
Reply With Quote
     
     
  #19  
Old Posted Jun 7, 2010, 4:33 PM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,808
Quote:
Originally Posted by rodionx View Post
Didn't they just pave Bank last year when they redid the whole street between Somerset and the Queensway? Odd. They've been working on Lyon as well, which really does need it.

As for the tree question above, the city has a tree guy you can talk to if you want further details. I consulted him a couple of years ago when I was planning to plant a tree in my front yard, and wanted to know what could put up with road salt and all the other nasty stuff downtown trees put up with. His title might have been chief arborist or something like that. Nice guy. Knows his street trees.

The city had never put the top finish layer on Bank Street. I am not sure why they waited..maybe something to do with seasons, but there had been little temporary ramps at all the crosswalks.

I see the question was already answered....sorry for the duplication.
Reply With Quote
     
     
  #20  
Old Posted Jun 20, 2010, 5:59 PM
rakerman rakerman is offline
Registered User
 
Join Date: Feb 2006
Posts: 748
bike rack art is back

The artistic bike racks are back



Rumour is they were rusting and had to be replaced?

Last edited by rakerman; Jun 21, 2010 at 2:41 AM. Reason: fixed weird URL error
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:28 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.