ESI engineer gave me the following information on Main Street and crane:
There will be 3 lanes open down main, and the 4th lane will be used as a ‘drop off lane’ probably a valet lane, overflow bus stop, etc. exact use yet to be identified. May also be used for Commuter ride drop off location.
We set the tower crane base, and placed the concrete footing, just over 200 cubic yards. Tower crane will erect the first week of may, charge up your camera batteries, it will be fun to watch.
Concrete was placed this week, first section is installed. It is more toward costa vida on west side. Sawtooth, get your camera ready.