HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver


Reply

 
Thread Tools Display Modes
     
     
  #461  
Old Posted Nov 17, 2023, 2:58 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,361
From Lawrence Black twitter Nov 14th:

Now U/C!


https://twitter.com/LawrenceBlackTV
Reply With Quote
     
     
  #462  
Old Posted Nov 30, 2023, 3:44 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,785
This morning







Video Link
Reply With Quote
     
     
  #463  
Old Posted Nov 30, 2023, 6:27 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,282
this one needs to be renamed to U/C. looks like theres a crane, etc.
Reply With Quote
     
     
  #464  
Old Posted Dec 15, 2023, 5:01 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,595
Two weeks ago with the first suspended slab pour:

https://www.instagram.com/p/C0Vb1cExA1Z/
Reply With Quote
     
     
  #465  
Old Posted Jan 1, 2024, 12:44 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,785
Geez ! I missed a lot in the past month, excavation done, excavators gone, core footing poured and suspended slap no.2 Westside done.

Yesterday Dec 30, 2023








https://makeagif.com/i/6BRR7g

Video Link

Last edited by Zepfancouver; Jan 1, 2024 at 5:01 AM. Reason: replaced an image
Reply With Quote
     
     
  #466  
Old Posted Jan 2, 2024, 12:21 AM
svlt svlt is offline
Registered User
 
Join Date: Apr 2014
Location: Canada
Posts: 824
Should this be titled U/C instead of proposed?
Reply With Quote
     
     
  #467  
Old Posted Jan 2, 2024, 12:36 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Location: Vancouver
Posts: 2,689
Yes, but there are next to no mods here.
Reply With Quote
     
     
  #468  
Old Posted Jan 2, 2024, 3:02 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,595
Drone photos of the core concrete pour. 1000m

https://www.instagram.com/p/C1BNWoERkKA/?img_index=1
Reply With Quote
     
     
  #469  
Old Posted Jan 24, 2024, 4:15 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,595
Quote:
Our Fifteen Fifteen project, in partnership with Kingswood Properties, is on its way to making its mark on the Vancouver skyline.

We’ve surpassed another key milestone, excavating down 110 ft to P8 — beginning the process of building up 42 storeys.

The building silhouette will highlight Büro Ole Scheeren's distinctive design, featuring six glass-enclosed cantilevers suspended at up to 40 ft out from the building. To hoist these prefabricated cantilevered structures up from the base of the site, this project requires a specialized luffing crane, currently the largest in Canada with an impressive weight capacity of 35,270 lbs.

This is precision-driven architecture at its best — thanks to our trusted partners, Glotman Simpson Consulting Engineers, Francl Architecture Inc. and Axiom Builders.
https://www.linkedin.com/feed/update...6249089470464/
Reply With Quote
     
     
  #470  
Old Posted Jan 30, 2024, 9:03 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 38,361
From Lawrence Black twitter posted today:
(probably a week old?)


https://twitter.com/LawrenceBlackTV
Reply With Quote
     
     
  #471  
Old Posted Feb 23, 2024, 5:42 AM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,785

Last edited by Zepfancouver; Feb 23, 2024 at 6:08 AM. Reason: Added a GIF
Reply With Quote
     
     
  #472  
Old Posted Mar 16, 2024, 11:11 PM
C3YVR C3YVR is offline
Registered User
 
Join Date: Jan 2020
Posts: 183
Alberni between Cardero and Nicola is blocked off today as a crane is set up to lift HVAC units on the roof of 1500 Georgia.
Reply With Quote
     
     
  #473  
Old Posted Mar 29, 2024, 9:41 PM
Zepfancouver's Avatar
Zepfancouver Zepfancouver is offline
Registered User
 
Join Date: Aug 2017
Location: Vancouver
Posts: 1,785
After a small delay of the excavation, the East side construction has caught up.

Yesterday




https://makeagif.com/i/pmlVb3
Reply With Quote
     
     
  #474  
Old Posted Apr 6, 2024, 12:44 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 9,595
Permits issued up to Level 1

Quote:
14-Mar-2024 - Stage 2.3 issued.
Foundation structure for basement levels P3 up to incl. Level 1.
https://plposweb.vancouver.ca/Public...ectId=82111982
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 12:27 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.