Quote:
Originally Posted by City Wide
I bet they'll dig it out, or break it up. That's one job they have lots of practice in doing.
|
Possible, but I've seen--and actually been involved with one in a residential project--where a ledge or bedrock has been incorporated into a footing. I kind of doubt that they'll bring in a hoe ram at this point to break it up, given that they've leveled and smoothed out the bottom and are laying out and marking footing locations. They would have done that
before layout. But with this project, who knows?