Quote:
Originally Posted by Biff
The scope is set. Tower 1 will start first at 17 storeys. The second tower will be apartments (as said above) and 4 or 5 floors of offices. Tower 2 will be 28 storeys (27 floors + 1 floor of amenity space). Tower 2 will be smaller in size, floor plate wise so it should likely catch up in construction once it is out of the hole.
Regarding the construction site...the pit on the Carlton side is now down to final depth (2 floors of parking). Below the horizontal steel braces the mini excavators are working on the elevator pits and core. The rest of the site up to about a diagonal line starting closest to the MTS Centre still needs to be excavated down to the pit height along Carlton. So far they have had no issues with water. They still need to install approximately 30 caissons but after that it should start rising quickly.
They are also engaging with a video board specialist to determine what type of displays will be fronting the public plaza. the Renders do not depict the final product yet of the displays.
|
Thx for the SE site update, elevator cores.
Can you just clarify the heights/floor count for me, as I have them listed in the tread title.
I have them listed in a tallest to shortest fashion from the past updates, this includes the 2 Sutton Towers.
So tower 1 and 2 locked in at 17 and 28 floors respectively. Sutton place yet to be verified are still at 27 and 17 ?