Quote:
Originally Posted by Cottonwood
Isn't there supposedly going to be some retail like a coffee shop on the first floor(s) in the alley between the two buildings? I hope so...
|
In the approved first floor plan of Phase 1, they had three retail spaces in phase 1, plus one planned for phase 2. The alley was lined with live/work in both phases.
Phase 2 shows no retail or live/work units on the ground floor. It looks like they located all of their parking on the first level to cut expenses of having to do a 2nd floor parking deck. But in the process, the retail space got cut to make the parking work.
Looking at the new site plan, it looks like in Phase 1 the retail along 8th street and the retail on the alley corner got turned into live/work units. The live/work units in the alley also changed and are now town homes. On the leasing website they are shown town homes.
https://theafton.com/live-here/
Lots of changes happened between permitting and construction.
Phase 1 DR drawings:
http://pdsonline.cityofboise.org/pds...id=DRH14-00262
Phase 2 DR drawings:
http://pdsonline.cityofboise.org/pds...id=DRH17-00213