Quote:
Originally Posted by colemonkee
Is there a plan to add a 4th crane to the core? Seems like the two cranes close to the tower footprint would be enough to build this thin all the way up.
|
They probably could build it with those two, but aside from that diagram showing the core crane, I also remember reading that one of the contractors said something about a fast-track schedule for the core and framing, and a dedicated crane for the core would speed it up, freeing the other cranes to concentrate on the heavy duty outer columns and floors.