All the parking levels seen are part of Phase 1. While the single level of columns with exposed rebar are for Phase 2 those towers are still going through the city's approval process.
I was under the inpression everything south of the skytrain was phase 2 but this site plan says otherwise.
I wonder will they do with this giant hole if phase 2 doesn't go ahead right away? Just leave a giant hole? Fill it in and then dig it out again later for phase 2? Neither seems very palatable.
Seems like it went to Third Reading on July 10 so I don't think it matters.
Quote:
Brentwood High-rise Office Building REZ #18-24 Onni Gilmore Holdings Corp 4120/70/80 Lougheed
Highway and 4161/71
Dawson Street
Construction of a high-rise office building (Gilmore Place
Phase II Commercial Tower 4), commercial podiums,
underground parking, and pulbic open space in accordance
with the Gilmore Place Master Plan.
N/A Third Reading 2023.07.10
Brentwood High-rise residential tower with
commercial podium
Rez #18-25
Onni Gilmore Holdings Corp 4120/60/70 Lougheed
Highway and 4161/71
Dawson Street
Construction of a residential high-rise within Phase II of the
Gilmore Place Master Plan site (Tower 5).
532 Third Reading 2023.07.10
Brentwood High-rise residential tower with
commercial podium
Rez #18-26
Onni Gilmore Holdings Corp 4120/60/70 Lougheed
Highway and 4161/71
Dawson Street
Construction of a residential high-rise within Phase II of the
Gilmore Place Master Plan site (Tower 6).
480 Third Reading 2023.07.10
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish