The GM of Saint John Waterfront Development was actually on CBC Radio last month talking about a variety of projects. So from the horse's mouth, here are the pertinent details the interview concerning this development current to March 12th:
3 Ongoing Engineering studies on the site:
-Seawall refurbishment specifications.
-Environmental Assessment (currently in the environmental file closure process).
-Developer-led geotechnical analysis.
No unforeseen hiccups so far in any of the engineering work.
Still mixed-use retail/commercial/hospitality/residential.
The planned renovations of the Loyalist Plaza area will be designed to blend seamlessly with the development.
Timeline: Still not firm, will be dictated by when the engineering studies finish up.