HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #1721  
Old Posted Jul 1, 2023, 4:54 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,811
We have not had any bridge/high truck contacts that I am aware of on the low approaches to the abandoned CN Oak Point crossing / Rt3 90 bridge on Wellington Crescent in a long while.

I guess the local furniture truck drivers a paying attention to the warning signs.
Reply With Quote
     
     
  #1722  
Old Posted Jul 2, 2023, 1:30 PM
wags_in_the_peg's Avatar
wags_in_the_peg wags_in_the_peg is offline
Registered User
 
Join Date: Oct 2006
Location: Winnipeg, MB
Posts: 3,797
Hwy 433 going up to Granite Hills golf course has been announced its going from gravel to asphalt. This is huge for the area, it can get very busy with so many cottages, many who have become permanent year round plus the popularity of the golf course.
__________________
just an ordinary Prairie Boy who loves to be in the loop on what is going on
Reply With Quote
     
     
  #1723  
Old Posted Jul 14, 2023, 5:26 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Good news: PTH 3 is being twinned

Bad news: It's a measly mile's worth of it

Quote:
Manitoba confirms plan to twin Highway 3
Posted: 2:40 PM CDT Thursday, Jul. 13, 2023

A functional design study to twin a section of Provincial Trunk Highway 3 is underway, Manitoba Infrastructure Minister Doyle Piwniuk says.

The provincial government intends to widen a 1.6-kilometre section of the highway extending east from Winnipeg city limits. According to the province, reconstruction is necessary owing to increased traffic volumes and to enable development in the region.
Consultations are scheduled to wrap up by May.
Reply With Quote
     
     
  #1724  
Old Posted Jul 14, 2023, 7:18 PM
Glenn99 Glenn99 is offline
Registered User
 
Join Date: Jul 2013
Posts: 241
Quote:
Originally Posted by esquire View Post
Good news: PTH 3 is being twinned

Bad news: It's a measly mile's worth of it



Consultations are scheduled to wrap up by May.
From Brady Rd to South Landing? After they just added lights and turning lanes.
Reply With Quote
     
     
  #1725  
Old Posted Jul 14, 2023, 7:23 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
IMO they should be twinning to just past Oak Bluff as phase one, and then go from there.
Reply With Quote
     
     
  #1726  
Old Posted Jul 14, 2023, 7:33 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,263
Quote:
Originally Posted by esquire View Post
IMO they should be twinning to just past Oak Bluff as phase one, and then go from there.
What! and forgo an opportunity to create a neverending phased project? Sacrilege!
__________________
"Enlightened statesmen will not always be at the helm."
Federalist #10, James Madison
Reply With Quote
     
     
  #1727  
Old Posted Jul 14, 2023, 8:47 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
As part of the interchange project, the highway is being twinned past oak bluff. This twinning fills the gap between the City and 101.
Reply With Quote
     
     
  #1728  
Old Posted Jul 14, 2023, 9:49 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,064
Quote:
Originally Posted by bomberjet View Post
As part of the interchange project, the highway is being twinned past oak bluff. This twinning fills the gap between the City and 101.
Where did you hear this? The initial phase plans on MTI's website (to 2048) show untwinned PTH3l 3 and a single bridge for PTH 3 at Perimeter.
Reply With Quote
     
     
  #1729  
Old Posted Jul 17, 2023, 2:20 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Oh right.. Maybe since they plan to twin PTH 3 in the short term, the interchange will also get the twinning treatment.
Reply With Quote
     
     
  #1730  
Old Posted Jul 17, 2023, 2:55 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,263
Quote:
Originally Posted by bomberjet View Post
Oh right.. Maybe since they plan to twin PTH 3 in the short term, the interchange will also get the twinning treatment.
I hope so. I also hope that a few more of these south perimeter projects can be expedited, that would be nice. It's so painfully obvious to anyone driving through that we are stuck in the 60s on our road design...
__________________
"Enlightened statesmen will not always be at the helm."
Federalist #10, James Madison
Reply With Quote
     
     
  #1731  
Old Posted Jul 17, 2023, 9:03 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,178
Apparently the Perimeter northbound at Wilkes is undergoing some maintenance work soon. Could this be FINALLY fixing the ramps on the existing bridge to address the massive safety issues?
Reply With Quote
     
     
  #1732  
Old Posted Jul 17, 2023, 9:10 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
^ In fairness, the geometry of the ramps there is probably no worse than with the other pre-1970 interchanges on the Perimeter (excluding the ones that have been significantly modified like 100 @ 1 on both the east and west ends).
Reply With Quote
     
     
  #1733  
Old Posted Jul 18, 2023, 3:13 PM
CoryB CoryB is offline
Registered User
 
Join Date: Mar 2012
Posts: 6,178
Quote:
Originally Posted by esquire View Post
^ In fairness, the geometry of the ramps there is probably no worse than with the other pre-1970 interchanges on the Perimeter (excluding the ones that have been significantly modified like 100 @ 1 on both the east and west ends).
I strongly disagree. There is no other interchange on the Perimeter and to my knowledge anywhere in Manitoba that has merging traffic go through a hairpin turn almost immediately before dropping them into a 100 km/h through lane of traffic at the top of the bridge so there isn't even a ditch or field to bail into in case of an error. And by chance if there is anything even remotely close to that dangerous elsewhere in Manitoba there is no chance that it has the same volume of traffic. The southbound side is almost as bad with the exit lane from the 100 km/h being on the blind side of grade separation. In most cases the exit it actually an added lane at the top of the grade separation which greatly improves visibility to traffic before they are at that point. There was one time not that long ago there was an accident on that very part and police needed to intentionally stage some of their vehicles further back to protect the accident scene.

What is super frustrating about that intersection is the land around it is currently undeveloped agricultural and similar uses. It would be trivial to move the two interaction points further south and have a stretch of added lane to support merge and exit actions in a much safer manner.
Reply With Quote
     
     
  #1734  
Old Posted Jul 18, 2023, 3:32 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
The MTI projects map (https://www.gov.mb.ca/mit/mipmap/map.html) says grading work on PTH 100. But dates are from last year. Not sure if that work was done, or is planned to be done this year as Cory mentioned.

I doubt, IMO, that any of the work proposed in the South Perimeter master plan will be completed without some sort of press release from the Province. Especially during election season.
Reply With Quote
     
     
  #1735  
Old Posted Jul 18, 2023, 4:26 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,888
Quote:
Originally Posted by CoryB View Post
Apparently the Perimeter northbound at Wilkes is undergoing some maintenance work soon. Could this be FINALLY fixing the ramps on the existing bridge to address the massive safety issues?
They are starting the overlay project between Wilkes and Hwy 3.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #1736  
Old Posted Jul 18, 2023, 7:21 PM
Wpgstvsouth94 Wpgstvsouth94 is offline
Registered User
 
Join Date: Aug 2020
Posts: 432
Reply With Quote
     
     
  #1737  
Old Posted Jul 19, 2023, 6:24 AM
Highwayman Highwayman is offline
Registered User
 
Join Date: Apr 2021
Location: Winnipeg
Posts: 309
Quote:
Originally Posted by CoryB View Post
I strongly disagree. There is no other interchange on the Perimeter and to my knowledge anywhere in Manitoba that has merging traffic go through a hairpin turn almost immediately before dropping them into a 100 km/h through lane of traffic at the top of the bridge so there isn't even a ditch or field to bail into in case of an error. And by chance if there is anything even remotely close to that dangerous elsewhere in Manitoba there is no chance that it has the same volume of traffic. The southbound side is almost as bad with the exit lane from the 100 km/h being on the blind side of grade separation. In most cases the exit it actually an added lane at the top of the grade separation which greatly improves visibility to traffic before they are at that point. There was one time not that long ago there was an accident on that very part and police needed to intentionally stage some of their vehicles further back to protect the accident scene.

What is super frustrating about that intersection is the land around it is currently undeveloped agricultural and similar uses. It would be trivial to move the two interaction points further south and have a stretch of added lane to support merge and exit actions in a much safer manner.
221 / 101 is a mirror copy of Wilkes. Also they said they will be lengthing Wilkes on and off Ramps.
Reply With Quote
     
     
  #1738  
Old Posted Jul 24, 2023, 7:08 PM
pegcityboy's Avatar
pegcityboy pegcityboy is offline
Registered User
 
Join Date: Mar 2008
Location: Winnipeg
Posts: 587
Went golfing to Pleasant Valley yesterday ( by Pelican Lake , south end of it ) and saw road construction signs slow down east of Baldur , much to my surprise even shock , road crew working on the road at 11 am and even more shocking coming back to Winnipeg at 530 ish road crew STILL WORKING on the highway ! Highway 3 and 23 now in very good shape .
Reply With Quote
     
     
  #1739  
Old Posted Jul 25, 2023, 11:31 AM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is online now
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,479
Quote:
Originally Posted by pegcityboy View Post
Went golfing to Pleasant Valley yesterday ( by Pelican Lake , south end of it ) and saw road construction signs slow down east of Baldur , much to my surprise even shock , road crew working on the road at 11 am and even more shocking coming back to Winnipeg at 530 ish road crew STILL WORKING on the highway ! Highway 3 and 23 now in very good shape .
That’s great news. On the other hand I just arrived in Pleasant Valley (my sister lives there) Saturday from the south and 18 Highway from the US border to the Highway 3 junction is an insult to goat paths. From the Junction to the Vet Clinic corner it’s in midlife shape. From there to Ninette it’s brand new and from Ninette to the junction of Highway 2 it’s a goat path. Probably a couple of years before resurfacing commences. Folks out here expect a reduction of highway upgrades in this region if the NDP is elected. 🫤
Reply With Quote
     
     
  #1740  
Old Posted Jul 25, 2023, 2:47 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Then maybe they should vote for the NDP?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 12:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.