I wonder if we will be getting a few more details on this project soon then, like the actual floor count since there seems to be some discrepancy on whether it's 73 floors or 74 floors.
__________________
"GOOD TIMES!!!" Jerri Blank (Strangers With Candy)
Reply With Quote
     
     
  #2  
Old Posted Jun 15, 2022, 1:55 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,729
It's too bad the CCTV cam was repositioned. The few times I looked at it during the past couple days, the workers at the gate have been letting material deliveries large dump trucks in.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #3  
Old Posted Jun 15, 2022, 2:20 PM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Quote:
Originally Posted by The ATX View Post
It's too bad the CCTV cam was repositioned. The few times I looked at it during the past couple days, the workers at the gate have been letting material deliveries large dump trucks in.
I made an excel spreadsheet with all of the cameras and highlighted the relevant cams (those with good downtown views or views of construction projects). What I’ve noticed is that the cameras will shift position every few days. The vantage point of this camera (#40) had been consistent up until a few days ago.
Reply With Quote
     
     
  #4  
Old Posted Jun 15, 2022, 4:57 PM
Green Country Green Country is offline
Registered User
 
Join Date: Jan 2022
Posts: 102
Quote:
Originally Posted by 427MM View Post
Official Notice to Proceed comes today! This comes from two trustworthy sources who are both excited to get moving in earnest. Let the five year countdown begin!
What is a Notice to Proceed? And who issues such a thing?
Reply With Quote
     
     
  #5  
Old Posted Jun 15, 2022, 6:04 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,729
Quote:
Originally Posted by Green Country View Post
What is a Notice to Proceed? And who issues such a thing?
That's an official notice from the developer to general contractor to begin construction.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #6  
Old Posted Jun 15, 2022, 3:11 PM
ATX2030 ATX2030 is offline
Registered User
 
Join Date: Nov 2020
Posts: 928
Sent an email to [email protected] and asked to correct the zoom and angle. Who knows maybe they might change it back. The Four Seasons (West) appears fine.

https://cctv.austinmobility.io/image/39.jpg
Reply With Quote
     
     
  #7  
Old Posted Jun 15, 2022, 3:24 PM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Quote:
Originally Posted by ATX2030 View Post
Sent an email to [email protected] and asked to correct the zoom and angle. Who knows maybe they might change it back. The Four Seasons (West) appears fine.

https://cctv.austinmobility.io/image/39.jpg
Getting stuff done!

562 used to have a great view of the 415 Colorado site, but it’s been down for a few weeks now. Best I could find now on that one was camera 561 which isn’t that great.
Reply With Quote
     
     
  #8  
Old Posted Jun 15, 2022, 3:28 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,729
Greg/Walkable responded on Twitter that this project got underway yesterday. A big official groundbreaking won't happen until fall. That's when the excavation will have been completed and possibly some underground levels constructed.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #9  
Old Posted Jun 15, 2022, 4:01 PM
AusTex's Avatar
AusTex AusTex is offline
Registered User
 
Join Date: May 2007
Location: Austin
Posts: 760
Quote:
Originally Posted by The ATX View Post
Greg/Walkable responded on Twitter that this project got underway yesterday. A big official groundbreaking won't happen until fall. That's when the excavation will have been completed and possibly some underground levels constructed.
Does this mean the sticky can be changed from Site Prep to Under Construction?
Reply With Quote
     
     
  #10  
Old Posted Jun 15, 2022, 4:06 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,729
Quote:
Originally Posted by AusTex View Post
Does this mean the sticky can be changed from Site Prep to Under Construction?
To be U/C we need concrete poured for piers/columns/diaphragm wall. I have a new updated list of tallest projects to post in the sticky thread, and this one gets a green highlight. Now I would like to confirm the status of River St. Residences before I post/tweet it.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #11  
Old Posted Jun 15, 2022, 5:56 PM
drummer drummer is offline
World Traveler
 
Join Date: Jan 2015
Location: Austin metro area
Posts: 4,733
I'm happy to go ahead and give them a notice to proceed, if it matters. Who do I email?
Reply With Quote
     
     
  #12  
Old Posted Jun 16, 2022, 12:30 AM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Well now none of the cameras are working. They’re onto us…

Anyways, if they ever do stop working again, here are some of the more interesting cams I’ve found. Just note that the views change on these quite frequently so some days you get amazing city views and the next you’ll get a dumpster in some random back alley.

Reply With Quote
     
     
  #13  
Old Posted Jun 16, 2022, 12:40 AM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,729
Nice list. That took some effort.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #14  
Old Posted Jun 16, 2022, 12:43 AM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Right here, right now
Posts: 12,729
For a brief few minutes this afternoon, the 98 Red River camera was repositioned to show the North half of the site. There was a parade of dump trucks entering the site from RR by crossing CC then getting filled with dirt and such then exiting with their load down Driskill to the frontage road.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #15  
Old Posted Jun 16, 2022, 1:21 PM
agsatx88 agsatx88 is offline
Registered User
 
Join Date: Oct 2021
Posts: 287
Some of the action this morning is visible on the camera. Excavator seems to be digging up the dirt behind where the overflow parking lot retaining wall used to be.

I drove by the site in the pre-dawn hours this morning and I'm not 100% sure but it looked like Willow street might be gone.

Reply With Quote
     
     
  #16  
Old Posted Jun 16, 2022, 10:31 PM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Figured I'd get one in before they move the camera again.

Reply With Quote
     
     
  #17  
Old Posted Jun 17, 2022, 2:32 PM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Got a quick snapshot this morning before they moved the camera again. I think they're just messing with us at this point.

Looks like the crew is in full excavation mode.


Reply With Quote
     
     
  #18  
Old Posted Jun 17, 2022, 3:03 PM
ATX2030 ATX2030 is offline
Registered User
 
Join Date: Nov 2020
Posts: 928
Quote:
Originally Posted by bobbywest87 View Post
Got a quick snapshot this morning before they moved the camera again. I think they're just messing with us at this point.

Looks like the crew is in full excavation mode.


I called and spoke with a nice gentleman with the transportation dept. about the camera angle. He told me that from time to time they adjust the angle for traffic enforcement or when they reconfigure traffic patterns which they have recently done at the intersection. He described exactly what we've been observing with the back and forth angles. It'll be hit or miss he said. Hopefully we get a dedicated construction camera soon!
Reply With Quote
     
     
  #19  
Old Posted Jun 17, 2022, 3:37 PM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Quote:
Originally Posted by ATX2030 View Post
I called and spoke with a nice gentleman with the transportation dept. about the camera angle. He told me that from time to time they adjust the angle for traffic enforcement or when they reconfigure traffic patterns which they have recently done at the intersection. He described exactly what we've been observing with the back and forth angles. It'll be hit or miss he said. Hopefully we get a dedicated construction camera soon!
Thanks for calling and getting the facts. As much as I want them to keep the cameras pointed towards the construction, I need to remember that these cameras are first and foremost for traffic and not construction.
Reply With Quote
     
     
  #20  
Old Posted Jun 19, 2022, 3:12 AM
AustinYIMBY AustinYIMBY is offline
Registered User
 
Join Date: May 2014
Location: AUSTIN
Posts: 97
From today on my phone. Standing at the gate to 80 Red River, right next to Van Zandt.

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 12:49 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.